CN204944480U - A kind of Sopwith staff for land resource mapping - Google Patents

A kind of Sopwith staff for land resource mapping Download PDF

Info

Publication number
CN204944480U
CN204944480U CN201520762543.7U CN201520762543U CN204944480U CN 204944480 U CN204944480 U CN 204944480U CN 201520762543 U CN201520762543 U CN 201520762543U CN 204944480 U CN204944480 U CN 204944480U
Authority
CN
China
Prior art keywords
sopwith staff
resource mapping
land resource
column foot
installation cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520762543.7U
Other languages
Chinese (zh)
Inventor
贾斐斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201520762543.7U priority Critical patent/CN204944480U/en
Application granted granted Critical
Publication of CN204944480U publication Critical patent/CN204944480U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

A kind of Sopwith staff for land resource mapping, it comprises a Sopwith staff body and a column foot body, described column foot body is removably installed in described Sopwith staff body, described column foot body is optionally installed on described Sopwith staff body by the land resource situation that land surveying personnel carry out as required, so that the described Sopwith staff for land resource mapping is fixed on the ground of the different hardness such as soil property, asphalt road by land resource mapping worker, thus aspect land resource mapping worker is measured.

Description

A kind of Sopwith staff for land resource mapping
Technical field
The utility model relates to a kind of Sopwith staff, in particular to a kind of Sopwith staff for land resource mapping, the wherein said Sopwith staff for land resource mapping comprises a Sopwith staff body and a column foot body, described column foot body is removably installed in described Sopwith staff body, described column foot body is optionally installed on described Sopwith staff body by the land resource situation that land surveying personnel carry out as required, so that the described Sopwith staff being used for land resource mapping is fixed on soil property by land resource mapping worker, on the ground of the different hardness such as asphalt road, thus facilitate land resource mapping worker to measure.
Background technology
Sopwith staff is the one of levelling pole, adopt tower shrink form, convenient extraction in use, all extract height out due to Sopwith staff and can reach 5m, place to use mostly is outdoor, and Sopwith staff is the survey instrument often used in land resource mapping, land resource mapping worker can be helped to carry out tunnel survey, river water level measurement etc., can usually see Sopwith staff instrument in construction ground, help construction and mapping worker to understand topography and geomorphology, help people effectively to carry out next step work.
But when we use Sopwith staff, can in the face of different topography and geomorphologies and different soil property compositions, such as, when carrying out orbit construction in the city that we live, need to survey and draw on asphalt road, because asphalt road hardness is harder, when there is the gradient on road surface, carry out measurement at placement Sopwith staff to be not easy to mapping worker and to draw data accurately, mapping worker effectively can not ensure when placing Sopwith staff that Sopwith staff can be positioned over reposefully and measure ground, when needing to use Sopwith staff to measure comparatively soft soil property ground, in order to prevent Sopwith staff run-off the straight or skew, we need Sopwith staff to be deep into underground, but when Sopwith staff is in depth descended, mapping worker needs the very large strength guarantee Sopwith staff of expense to be firmly fixed at underground.
In order to make mapping worker more convenient when carrying out land resource mapping, make Sopwith staff more adapt to the measurement of various geology and geomorphology, the present invention helps mapping worker to complete surveying work more accurately.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of Sopwith staff for land resource mapping.
For solving the problem, the technical scheme that the utility model provides is: a kind of Sopwith staff for land resource mapping, and the wherein said Sopwith staff for land resource mapping comprises:
One Sopwith staff body, wherein said Sopwith staff body comprises a Sopwith staff element and an installation elements, and described installation elements is arranged at the bottom of described Sopwith staff element, and described installation elements has a receptive cavity; And
One column foot body, wherein said column foot body comprises the insertion element of a column foot element and a taper, described column foot element has one first side, one second side, one first installation cavity and one second installation cavity, described first installation cavity is located at described first side of described column foot element, described second installation cavity is located at described second side of described column foot element, described insertion element is arranged at described second side of described column foot element, and described insertion element stretches out from described second installation cavity, described installation elements optionally and be removably installed in described first installation cavity and described second installation cavity, and described insertion element is housed inside described receptive cavity.
Further, described Sopwith staff body also comprises two setting elements, described in each, setting element compartment of terrain is arranged at described installation elements, described column foot element has two first locating slots and two second locating slots, described first side of described column foot element is located in first locating slot compartment of terrain described in each, and the first locating slot described in each is interconnected with described first installation cavity respectively, described second side of described column foot element is located in second locating slot compartment of terrain described in each, and the second locating slot described in each is interconnected with described second installation cavity respectively, wherein setting element described in each is optionally positioned the first locating slot described in each and described second locating slot.
Further, setting element described in each is arranged at described installation elements symmetrically.
Further, described insertion element has at least one insertion groove, and insertion groove compartment of terrain described in each is arranged along the length direction of described insertion element.
Further, described Sopwith staff element is the square column extended, and at least one side of described Sopwith staff element is provided with scale.
The advantage that the utility model has and beneficial effect are:
Main advantage of the present utility model is to provide a kind of Sopwith staff for land resource mapping, the wherein said Sopwith staff for land resource mapping comprises a Sopwith staff body and a column foot body, described column foot body is removably installed in described Sopwith staff body, described column foot body is optionally installed on described Sopwith staff body by the land resource situation that land surveying personnel carry out as required, so that the described Sopwith staff being used for land resource mapping is fixed on soil property by land resource mapping worker, on the ground of the different hardness such as asphalt road, thus aspect land resource mapping worker is measured.
Another advantage of the present utility model is to provide a kind of Sopwith staff for land resource mapping, wherein said Sopwith staff body comprises a Sopwith staff element, described Sopwith staff element is the square column extended, and at least one side of described Sopwith staff element is provided with scale, so that land surveying personnel check data.
Another advantage of the present utility model is to provide a kind of Sopwith staff for land resource mapping, wherein said Sopwith staff body comprises an installation elements, described installation elements is arranged at the bottom of described Sopwith staff element, described Sopwith staff element can be removably installed in described column foot body, facilitates land surveying personnel to carry and operate the described Sopwith staff for land resource mapping.
Another advantage of the present utility model is to provide a kind of Sopwith staff for land resource mapping, wherein said column foot body comprises a column foot element, described installation elements can be removably installed in described column foot element, described column foot element can be injected into the materials such as water, so that land surveying personnel are when measuring water level or near river, during the resources such as lake, atlas mapping worker can be gathered materials on the spot and water injected described column foot element, land survey position can be fixed on reposefully when using to make the described Sopwith staff for land resource mapping, prevent the described Sopwith staff run-off the straight for land resource mapping or skew, described column foot element weight is lighter, facilitate mapping worker to carry and transport, described column foot element also can be more ponderable the becoming such as stone and makes, the described Sopwith staff being used for land resource mapping can be fixed on ground to make mapping worker.
Another advantage of the present utility model is to provide a kind of Sopwith staff for land resource mapping, wherein said column foot body comprises the insertion element of a taper, described installation elements has a receptive cavity, described insertion element can be housed inside described receptive cavity, described insertion element has at least one insertion groove, insertion groove compartment of terrain described in each is arranged along the length direction of described insertion element, described insertion element can insert the underground position of comparatively soft geology, insertion groove described in each decreases the resistance of described insertion element when inserting underground, land surveying personnel are facilitated to carry out operating and fix the described Sopwith staff for land resource mapping.
Another advantage of the present utility model is to provide a kind of Sopwith staff for land resource mapping, described column foot element has one first installation cavity and one second installation cavity, described insertion element stretches out from described second installation cavity, described installation elements optionally and be removably installed in described first installation cavity and described second installation cavity, described installation elements can optionally be installed in described ground one installation cavity or the second installation cavity by land surveying personnel according to the geology and geomorphology carrying out measuring soil, such as when carrying out measuring comparatively soft soil property geology, described installation elements can be installed on described ground one installation cavity by land surveying personnel, with the underground enabling described insertion element be deep into soil property geology, thus the described Sopwith staff being used for land resource mapping is fixed on the ground in the soil that needs are measured, aspect land surveying personnel carry out DATA REASONING.
Another advantage of the present utility model is to provide a kind of Sopwith staff for land resource mapping, the wherein said Sopwith staff Each part for land resource mapping relates to rationally, scientific arrangement, therefore, material cost and the manufacturing cost of the described Sopwith staff for land resource mapping have and can be effectively controlled and monitor, thus, the cost performance of the described Sopwith staff for land resource mapping can be improved.
Another advantage of the present utility model is to provide a kind of Sopwith staff for land resource mapping, the wherein said Sopwith staff for land resource mapping does not relate to complicated technique and accurate component, and the raw material sources of the described Sopwith staff for land resource mapping extensively and at a low price, effectively can meet the demand in market, therefore, the described Sopwith staff for land resource mapping has good market outlook and space.
The technical characteristic illustrating at following embodiment, accompanying drawing and mention in claims and combination thereof are further disclosed and are set forth by other objects of the present utility model, advantage and feature.
Accompanying drawing explanation
Fig. 1 is the schematic perspective view of the Sopwith staff for land resource mapping according to a preferred embodiment of the present utility model.
Fig. 2 is the Sopwith staff exploded perspective schematic diagram for land resource mapping according to above preferred embodiment of the present utility model.
Fig. 3 is the schematic perspective view of using state of the Sopwith staff for land resource mapping according to above preferred embodiment of the present utility model.
Fig. 4 is the installment state ground schematic perspective view of the Sopwith staff for land resource mapping according to above preferred embodiment of the present utility model.
Fig. 5 is the cross-sectional schematic of the Sopwith staff for land resource mapping according to above preferred embodiment of the present utility model.
Fig. 6 is the partial enlarged drawing of Fig. 5.
Embodiment
Below describe and realize the utility model for disclosing the utility model to enable those skilled in the art.Preferred embodiment in below describing only as an example, it may occur to persons skilled in the art that other apparent modification.The ultimate principle of the present utility model defined in the following description can be applied to other embodiments, deformation program, improvement project, equivalent and not deviate from the other technologies scheme of spirit and scope of the present utility model.
The Sopwith staff for land resource mapping according to a preferred embodiment of the present utility model as shown in Figures 1 to 6, the wherein said Sopwith staff for land resource mapping comprises Sopwith staff body 10 and a column foot body 20, described column foot body 20 is removably installed in described Sopwith staff body 10, so that carry ground mapping worker, according to the geology and geomorphology selectivity carrying out measuring soil, described Sopwith staff body 10 is installed on described column foot body 20, measure different geology and geomorphologies to facilitate described in land surveying librarian use accurately for the Sopwith staff of land resource mapping.
Described Sopwith staff body 10 comprises Sopwith staff element 11 and an installation elements 12, described installation elements 12 is arranged at the bottom of described Sopwith staff element 11, described Sopwith staff element 11 is the square columns extended, and at least one side of described Sopwith staff element 11 is provided with scale, described installation elements 12 can be removably installed in described column foot this locality 20, facilitates land surveying personnel to carry and transport the described Sopwith staff for land resource mapping.
Described column foot body 20 comprises a column foot element 21, described column foot element 21 has one first side 211, one second side 212, one first installation cavity 213 and one second installation cavity 214, as shown in Figure 2 and Figure 4, described first installation cavity 213 is located at described first side 211 of described column foot element 21, described second installation cavity 214 is located at described second side 212 of described column foot element 21, described installation elements 12 optionally and be removably installed in described first installation cavity 213 and described second installation cavity 214, described column foot element 21 can be injected into the ponderable materials such as water, such as, when described in land surveying librarian use for land resource mapping Sopwith staff in river, when Hu Hai etc. carry out land survey near the place at water source, can gather materials on the spot and moisture injected described column foot element 12, to increase the weight of described column foot element 21, guarantee that the described Sopwith staff for land resource mapping is when by use, described column foot element 21 can support described Sopwith staff element 11 reposefully, land surveying personnel are helped to complete the work of Data Collection, when the described Sopwith staff for land resource mapping is after being used, the materials such as water can be discharged described column foot element 21, to alleviate the weight of described column foot element 21, the described Sopwith staff for land resource mapping facilitates land surveying personnel to carry and transport, described column foot element also can be made up of ponderable materials such as stones, to enable to guarantee when using the described Sopwith staff for land resource mapping in various geology and geomorphology that the described Sopwith staff for land resource mapping is stably fixed on needs and carries out ground, measurement ground.
Described column foot body 20 also comprises the insertion element 22 of a taper, described insertion element 22 is arranged at described second side 212 of described column foot element 21, as shown in Figure 2, and described insertion element 22 stretches out from described second installation cavity 214, described installation elements has a receptive cavity 121, as shown in Figure 4, described insertion element 22 is housed inside described receptive cavity 121, described installation elements 12 optionally and be removably installed in described first installation cavity 213 or described second installation cavity 214, when land surveying personnel measure comparatively soft geology, described installation elements 12 can be installed on described ground one installation cavity 213, as shown in Figure 3, under can earth's surface being inserted into make described insertion element 22, the described Sopwith staff for land resource mapping is made to be firmly fixed at earth's surface, thus facilitate land surveying personnel to measure, when measuring on geology and geomorphology comparatively reposefully, such as measure on asphalt road, described installation elements 21 can be installed on described second installation cavity 214 by land surveying personnel, described receptive cavity 121 is housed inside to make described insertion element 22, as shown in Figure 1, described second side 212 of described column foot element 21 can be fixed on comparatively smooth asphalt road, the described Sopwith staff for land resource mapping facilitates the multifarious use of land surveying personnel, meet the surveying work of different geology and geomorphologies greatly.
It is worth mentioning that, described insertion element 22 has at least one insertion groove 221, insertion groove 221 compartment of terrain described in each is arranged along the length direction of described insertion element 22, when inserting underground to make described insertion element 22, insertion groove 221 described in each can reduce the resistance in described insertion element 22 and soil, to alleviate the work load of land surveying personnel, land surveying personnel are facilitated to operate.
Described Sopwith staff body 20 also comprises two setting elements 13, setting element 13 compartment of terrain described in each or be arranged at described installation elements 12 symmetrically, described column foot element 21 has two first locating slot 215 and two second locating slots 216, as shown in Figure 2, described first side 211 of described column foot element 21 is located in first locating slot 215 compartment of terrain described in each, and the first locating slot 215 described in each is interconnected with described first installation cavity 213 respectively, described second side 212 of described column foot element 21 is located in second locating slot 216 compartment of terrain described in each, and the second locating slot 216 described in each is interconnected with described second installation cavity 214 respectively, wherein setting element 13 described in each is optionally positioned the first locating slot 215 described in each and described second locating slot 216, rotate or instability when being installed on described ground one locating slot 215 or the second locating slot 216 to prevent setting element 13 described in each, to guarantee that described installation elements 12 can be installed on described column foot element 21 securely, ensure that the stability of the described Sopwith staff for land resource mapping when being used and fastness.
One skilled in the art will understand that the embodiment of the present utility model shown in foregoing description and accompanying drawing only limits the utility model as an example and not.The purpose of this utility model is complete and effectively realize.Function of the present utility model and structural principle are shown in an embodiment and are illustrated, do not deviating under described principle, embodiment of the present utility model can have any distortion or amendment.

Claims (7)

1., for a Sopwith staff for land resource mapping, it is characterized in that, comprising:
One Sopwith staff body, wherein said Sopwith staff body comprises a Sopwith staff element and an installation elements, and described installation elements is arranged at the bottom of described Sopwith staff element, and described installation elements has a receptive cavity; And
One column foot body, wherein said column foot body comprises the insertion element of a column foot element and a taper, described column foot element has one first side, one second side, one first installation cavity and one second installation cavity, described first installation cavity is located at described first side of described column foot element, described second installation cavity is located at described second side of described column foot element, described insertion element is arranged at described second side of described column foot element, and described insertion element stretches out from described second installation cavity, described installation elements optionally and be removably installed in described first installation cavity and described second installation cavity, and described insertion element is housed inside described receptive cavity.
2. as claimed in claim 1 for the Sopwith staff of land resource mapping, it is characterized in that, described Sopwith staff body also comprises two setting elements, described in each, setting element compartment of terrain is arranged at described installation elements, described column foot element has two first locating slots and two second locating slots, described first side of described column foot element is located in first locating slot compartment of terrain described in each, and the first locating slot described in each is interconnected with described first installation cavity respectively, described second side of described column foot element is located in second locating slot compartment of terrain described in each, and the second locating slot described in each is interconnected with described second installation cavity respectively, wherein setting element described in each is optionally positioned the first locating slot described in each and described second locating slot.
3., as claimed in claim 2 for the Sopwith staff of land resource mapping, it is characterized in that, setting element described in each is arranged at described installation elements symmetrically.
4., as claimed in claim 1 for the Sopwith staff of land resource mapping, it is characterized in that, described insertion element has at least one insertion groove, and insertion groove compartment of terrain described in each is arranged along the length direction of described insertion element.
5., as claimed in claim 2 for the Sopwith staff of land resource mapping, it is characterized in that, described insertion element has at least one insertion groove, and insertion groove compartment of terrain described in each is arranged along the length direction of described insertion element.
6., as claimed in claim 3 for the Sopwith staff of land resource mapping, it is characterized in that, described insertion element has at least one insertion groove, and insertion groove compartment of terrain described in each is arranged along the length direction of described insertion element.
7. as the Sopwith staff for land resource mapping in claim 1 to 6 as described in any one, it is characterized in that, described Sopwith staff element is the square column extended, and at least one side of described Sopwith staff element is provided with scale.
CN201520762543.7U 2015-09-29 2015-09-29 A kind of Sopwith staff for land resource mapping Expired - Fee Related CN204944480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520762543.7U CN204944480U (en) 2015-09-29 2015-09-29 A kind of Sopwith staff for land resource mapping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520762543.7U CN204944480U (en) 2015-09-29 2015-09-29 A kind of Sopwith staff for land resource mapping

Publications (1)

Publication Number Publication Date
CN204944480U true CN204944480U (en) 2016-01-06

Family

ID=55011897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520762543.7U Expired - Fee Related CN204944480U (en) 2015-09-29 2015-09-29 A kind of Sopwith staff for land resource mapping

Country Status (1)

Country Link
CN (1) CN204944480U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105444733A (en) * 2016-01-09 2016-03-30 长安大学 Measuring scale and measuring method for automatically-centralized level gauge
CN112695811A (en) * 2020-11-30 2021-04-23 中国十七冶集团有限公司 Buried pipe earth excavation tank bottom elevation control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105444733A (en) * 2016-01-09 2016-03-30 长安大学 Measuring scale and measuring method for automatically-centralized level gauge
CN112695811A (en) * 2020-11-30 2021-04-23 中国十七冶集团有限公司 Buried pipe earth excavation tank bottom elevation control method

Similar Documents

Publication Publication Date Title
Ling et al. Application of electrical resistivity tomography for investigating the internal structure of a translational landslide and characterizing its groundwater circulation (Kualiangzi landslide, Southwest China)
Agliardi et al. Onset and timing of deep-seated gravitational slope deformations in the eastern Alps, Italy
CN103306236B (en) Method for constructing underground reservoir in ancient gully of ancient underground river channel
Stokes et al. Palaeoflood estimates of Pleistocene coarse grained river terrace landforms (Río Almanzora, SE Spain)
Benítez de Lugo Enrich et al. The hydrogeological and paleoclimatic factors in the Bronze Age Motillas Culture of La Mancha (Spain): the first hydraulic culture in Europe
CN204944480U (en) A kind of Sopwith staff for land resource mapping
CN106013049A (en) Construction method for foundation pile engineering in karst area
Fernandez et al. First delimitation of areas affected by ground deformations in the Guadalfeo River Valley and Granada metropolitan area (Spain) using the DInSAR technique
Dungca A reference for the allowable soil bearing capacities in Quezon city, Philippines
CN209589038U (en) A kind of height-adjustable ground settlement measuring point
CN205530394U (en) Testing arrangement of stake side burden frictional resistance
Rink et al. Dating the geometric Nasca lines in the Peruvian desert
CN205591134U (en) Stand protection network structure floats
CN212004998U (en) Survey and drawing tripod is with fixed antiskid device that falls
Olugbenga et al. Underground water distribution system in Gwagwalada Area Council Abuja, Nigeria, using resistivity geophysical method
RU145484U1 (en) INTERCONNECT SIGN FOR ATTACHING POINTS OF A SUPPORT BETWEEN NETWORK AND SUPPORT BETWEEN SIGNS WITH A BUILT-IN INFORMATION-INDICATION CHIP
CN108168939B (en) Equivalent sampling method for large-buried-depth soil sample
Sreedevi et al. Investigating geophysical and hydrogeological variabilities and their impact on water resources in the context of meso-watersheds
Domej et al. Geophysical investigations on the contribution of irrigation channels to landslide activity in Tusion, Tajikistan
Fadele et al. Geophysical engineering investigation around Makiyaye Village, shika area within the basement complex of North-Western Nigeria
CN212843576U (en) Oil exploration surveying instrument convenient to adjust
Amadi et al. Geological and Geophysical Investigation of Groundwater in Parts of Paiko, Sheet 185, North-Central Nigeria
CN203037862U (en) Detector embedding device specially used for deserts
Kvamme Geophysical insights and problem solving at Chief Looking’s Village, North Dakota, USA
Buró et al. Geomorphological and stratigraphic analyses at the archaeological excavation in the Megapark, Nyíregyháza-Oros

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

Termination date: 20160929