CN204899956U - Be used for subsideing post deep hole reinforced (rfd) slip casting pipe of slip casting in advance - Google Patents
Be used for subsideing post deep hole reinforced (rfd) slip casting pipe of slip casting in advance Download PDFInfo
- Publication number
- CN204899956U CN204899956U CN201520697532.5U CN201520697532U CN204899956U CN 204899956 U CN204899956 U CN 204899956U CN 201520697532 U CN201520697532 U CN 201520697532U CN 204899956 U CN204899956 U CN 204899956U
- Authority
- CN
- China
- Prior art keywords
- slip casting
- grouting pipe
- pipe
- backplate
- grouting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a be used for subsideing post deep hole reinforced (rfd) slip casting pipe of slip casting in advance, belongs to colliery apparatus equipment technical field, includes main slip casting pipe, supplementary slip casting pipe, blast pipe, prevents spouting the stock, prevents spouting the backplate, keeps off ring, grout outlet, its characterized in that: the fixed cartridge of the middle department in top surface has main slip casting pipe before preventing spouting the backplate, the fixed cover of main slip casting pipe side top surface evenly distributed is equipped with a plurality of and keeps off the ring, main slip casting pipe side top surface left side limit evenly distributed all around is equipped with a plurality of grout outlet, main slip casting pipe top is equipped with supplementary slip casting pipe and the backplate front surface is being prevented spouting by fixed cartridge, supplementary slip casting pipe top is equipped with the blast pipe and the backplate front surface is being prevented spouting by fixed cartridge, it has and prevents spouting the stock to prevent spouting before the backplate each fixed cartridge of top surface four corners department, can realize efficient grouting pressure's transmission, can realize utilizing direct cutting of coal -winning machine to pass through after the slip casting, and the efficiency of improving production can realize the slip casting in pertinence place, improvement slip casting efficiency.
Description
Technical field
The utility model belongs to technique with the apparatus field, colliery, is specifically related to a kind of Grouting Pipe of reinforcing for karst collapse col umn Deep-hole Pre-grouting.
Background technology
Mine Genesis of Karst Subsided Column be colliery common one structure, the crushed rocks that in karst collapse col umn, filling mechanical property is lower and argillaceous cave-sedimental fillings, normally permeable, support inbreak, gas accident, base plate are sunk accident, substantially all administer by the method for grouting and reinforcing in control at the scene, to ensure the safety of coal-face.The length of usual this area injected hole is at about 50m, what have even reaches about 100m, i.e. so-called deep hole, according to correlative study, when slip casting region away from Grouting Pipe more than 20m time, the pressure head of slip casting can sharply less, this is also the where the shoe pinches of Deep-hole Pre-grouting, common operation is used namely: punching-sealing of hole-slip casting-result inspection in mortar depositing construction process, in the injection hole sealing of karst collapse col umn reality, Grouting Pipe often sealing of hole is shorter and Grouting Pipe is shorter, there is the point lacked that face shows in this Grouting Pipe: 1, easily near Grouting Pipe aperture, there is hydraulic fracture, slurries are caused to waste serious and Coal Quality Decline, 2, slurries decline of pressure is in the borehole serious, and to when needing the region of grouting and reinforcing, grouting pressure can not ensure that slurries enter in karst collapse col umn, 3, slip casting tubing in the past uses steel pipe, and in follow-up mining, must leave the special time processes steel pipe, causes certain potential safety hazard, 4, after slip casting terminates, the whole tube wall of grout filling, causes the decline of concrete column difficult treatment and ature of coal in follow-up manufacturing process, reduces economic benefit, 5, can not realize the slip casting in specific aim place, often slip casting in a big way, slip casting efficiency is low.
Summary of the invention
The purpose of this utility model is: 1, hydraulic fracture does not occur near aperture, thus saves grout material and reduce ature of coal loss; 2, utilize the pvc pipe of flame-retardant and anti-static, steel pipe, as Grouting Pipe, can realize transmission that is easy for installation, that save tubing, realize high efficiency grouting pressure than ever mutually; 3, slip casting can realize utilizing coal-winning machine directly to cut through after terminating, and does not need to shut down to process specially, improves the efficiency of producing; 4, can realize the slip casting in specific aim place, improve slip casting efficiency, its technical scheme is as follows:
A kind of Grouting Pipe of reinforcing for karst collapse col umn Deep-hole Pre-grouting, it comprises main Grouting Pipe 1, auxiliary Grouting Pipe 2, stack 3, blowout prevention anchor pole 4, blowout prevention backplate 5, baffle ring 6, grout outlet 7, it is characterized in that: before described blowout prevention backplate 5, top end surface middle is fixedly fitted with main Grouting Pipe 1, described main Grouting Pipe 1 side top end surface is evenly distributed fixed cover and several baffle rings 6 is housed, on the left of the top end surface of described main Grouting Pipe 1 side, limit surrounding is evenly distributed and is provided with several grout outlets 7, be provided with auxiliary Grouting Pipe 2 above described main Grouting Pipe 1 and be fixedly inserted into blowout prevention backplate 5 front surface, be provided with stack 3 above described auxiliary Grouting Pipe 2 and be fixedly inserted into blowout prevention backplate 5 front surface, before described blowout prevention backplate 5, top end surface corner place is each is fixedly fitted with blowout prevention anchor pole 4, described main Grouting Pipe 1 is made up of PVC material, and described grout outlet about 7 distance on described main Grouting Pipe 1 side surface is 0.5m inside diameter is 40mm, described baffle ring 6 outer tip end surface is wound with encapsulant, described main Grouting Pipe 1 length is longer than auxiliary Grouting Pipe 2, described auxiliary Grouting Pipe 2 length is longer than stack 3, described main Grouting Pipe 1, auxiliary Grouting Pipe 2 and stack 3 are made up of PVC material.
The beneficial effects of the utility model are: 1, hydraulic fracture does not occur near aperture, thus save grout material and reduce ature of coal loss; 2, utilize the pvc pipe of flame-retardant and anti-static, steel pipe, as Grouting Pipe, can realize transmission that is easy for installation, that save tubing, realize high efficiency grouting pressure than ever mutually; 3, slip casting can realize utilizing coal-winning machine directly to cut through after terminating, and does not need to shut down to process specially, improves the efficiency of producing; 4, the slip casting in specific aim place can be realized, improve slip casting efficiency.
face said by accompanying drawing:
Fig. 1 is overall structure schematic diagram of the present utility model.
detailed description of the invention:
With reference to Grouting Pipe of reinforcing for karst collapse col umn Deep-hole Pre-grouting a kind of described in Fig. 1, it comprises main Grouting Pipe 1, auxiliary Grouting Pipe 2, stack 3, blowout prevention anchor pole 4, blowout prevention backplate 5, baffle ring 6, grout outlet 7, it is characterized in that: before described blowout prevention backplate 5, top end surface middle is fixedly fitted with main Grouting Pipe 1, described main Grouting Pipe 1 side top end surface is evenly distributed fixed cover and several baffle rings 6 is housed, on the left of the top end surface of described main Grouting Pipe 1 side, limit surrounding is evenly distributed and is provided with several grout outlets 7, be provided with auxiliary Grouting Pipe 2 above described main Grouting Pipe 1 and be fixedly inserted into blowout prevention backplate 5 front surface, be provided with stack 3 above described auxiliary Grouting Pipe 2 and be fixedly inserted into blowout prevention backplate 5 front surface, before described blowout prevention backplate 5, top end surface corner place is each is fixedly fitted with blowout prevention anchor pole 4, described main Grouting Pipe 1 is made up of PVC material, and described grout outlet about 7 distance on described main Grouting Pipe 1 side surface is 0.5m inside diameter is 40mm, described baffle ring 6 outer tip end surface is wound with encapsulant, described main Grouting Pipe 1 length is longer than auxiliary Grouting Pipe 2, described auxiliary Grouting Pipe 2 length is longer than stack 3, described main Grouting Pipe 1, auxiliary Grouting Pipe 2 and stack 3 are made up of PVC material.
During use, wherein main Grouting Pipe 1 length is the same with drillable length, for transmission of pressure, material is nonmetals, for PVC etc., wherein main Grouting Pipe 1 there is baffle ring 6, realize the effect of the flowing of restriction slurries and increase frictional force, and at main Grouting Pipe 1 solution space cutter grout outlet 7, for follow-up slip casting, auxiliary Grouting Pipe 2 is for injecting sleeve shell material to the space between main Grouting Pipe 1 and boring, for better protecting main Grouting Pipe 1 and the transmission realizing high efficiency pressure, material is nonmetals, for PVC etc., stack 3 is getting rid of clearance air purposes for auxiliary slip casting 2, material is nonmetals, for PVC etc., blowout prevention backplate 5 by circular hole respectively with main Grouting Pipe 1, auxiliary Grouting Pipe 2, stack 3 couples together, and will be anchored on country rock with upper part by blowout prevention anchor pole 4, realize the fixing of whole device, during slip casting, first will install with upper part, then grouting pump is connected to auxiliary slip casting, on 2, grouting under pressure, until exhaust opening 7 be not vented or pulp time stop slip casting, after grout cures, grouting pump is connected in main Grouting Pipe 1, grouting under pressure, Deep-hole Pre-grouting can be realized.
Certainly; on to state face be not to restriction of the present utility model; the utility model is also not limited in above-mentioned citing, the change that those skilled in the art make in essential scope of the present utility model, remodeling, interpolation or replacement, also should belong to protection domain of the present utility model.
Claims (5)
1. a Grouting Pipe of reinforcing for karst collapse col umn Deep-hole Pre-grouting, comprise main Grouting Pipe (1), auxiliary Grouting Pipe (2), stack (3), blowout prevention anchor pole (4), blowout prevention backplate (5), baffle ring (6), grout outlet (7), it is characterized in that: described blowout prevention backplate (5) front top end surface middle is fixedly fitted with main Grouting Pipe (1), described main Grouting Pipe (1) side top end surface is evenly distributed fixed cover and several baffle rings (6) is housed, on the left of the top end surface of described main Grouting Pipe (1) side, limit surrounding is evenly distributed and is provided with several grout outlets (7), described main Grouting Pipe (1) top is provided with auxiliary Grouting Pipe (2) and is fixedly inserted into blowout prevention backplate (5) front surface, described auxiliary Grouting Pipe (2) top is provided with stack (3) and is fixedly inserted into blowout prevention backplate (5) front surface, described blowout prevention backplate (5) front top end surface corner place is each is fixedly fitted with blowout prevention anchor pole (4).
2. according to claim 1 a kind of for karst collapse col umn Deep-hole Pre-grouting reinforce Grouting Pipe, it is characterized in that: described grout outlet (7) the left and right distance on described main Grouting Pipe (1) side surface is 0.5m inside diameter is 40mm.
3. according to claim 1 a kind of for karst collapse col umn Deep-hole Pre-grouting reinforce Grouting Pipe, it is characterized in that: described baffle ring (6) outer tip end surface is wound with encapsulant.
4. according to claim 1 a kind of for karst collapse col umn Deep-hole Pre-grouting reinforce Grouting Pipe, it is characterized in that: described main Grouting Pipe (1) length is longer than auxiliary Grouting Pipe (2), described auxiliary Grouting Pipe (2) length is longer than stack (3).
5. a kind of Grouting Pipe of reinforcing for karst collapse col umn Deep-hole Pre-grouting according to claim 1, is characterized in that: described main Grouting Pipe (1), auxiliary Grouting Pipe (2) and stack (3) are made up of PVC material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520697532.5U CN204899956U (en) | 2015-09-10 | 2015-09-10 | Be used for subsideing post deep hole reinforced (rfd) slip casting pipe of slip casting in advance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520697532.5U CN204899956U (en) | 2015-09-10 | 2015-09-10 | Be used for subsideing post deep hole reinforced (rfd) slip casting pipe of slip casting in advance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204899956U true CN204899956U (en) | 2015-12-23 |
Family
ID=54922142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520697532.5U Expired - Fee Related CN204899956U (en) | 2015-09-10 | 2015-09-10 | Be used for subsideing post deep hole reinforced (rfd) slip casting pipe of slip casting in advance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204899956U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083666A (en) * | 2018-07-19 | 2018-12-25 | 贵州磷镁材料有限公司 | A kind of grouted anchor bar construction and its construction method |
-
2015
- 2015-09-10 CN CN201520697532.5U patent/CN204899956U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083666A (en) * | 2018-07-19 | 2018-12-25 | 贵州磷镁材料有限公司 | A kind of grouted anchor bar construction and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10774591B2 (en) | Drill-power-based directional hydraulic fracturing system for downhole quick slotting and method thereof | |
CN102493822B (en) | Method for performing curtain grouting construction on tunnel by water rich fault influence zone | |
CN108060908B (en) | Long-distance horizontal directional drilling and grouting reinforcement process for water-rich sand layer under building group | |
CN103277120B (en) | A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls | |
CN103321654B (en) | The method of flexible air-bag process coal mine roadway roof collapse | |
CN104533482B (en) | A kind of reinforcement means improving gob side entry driving fender stability | |
CN103195467B (en) | Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method | |
CN103089276B (en) | Deep-shallow hole and high-low pressure coupling grouting technology | |
CN102787846B (en) | Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone | |
CN103306713B (en) | Networked reinforcement method for cross-layer drilling of outburst coal seam | |
CN103899329B (en) | A kind of administering method of large deformation breaking surrounding rock tunnel | |
CN103410564B (en) | A kind of Tunnel Gushing treatment structures and construction method thereof | |
CN102628352B (en) | Multi-section fixed point hydraulic fracturing method | |
CN110130978B (en) | Method for plugging broken coal side of thick coal seam in broken area of filling and re-mining small kiln | |
CN105781597A (en) | Method for performing anchoring and grouting reinforcement inside deep well soft rock gob-side entry retaining | |
CN102966359A (en) | Working face ventilation oxidization zone roof control method | |
CN104963670A (en) | Method for expanding and increasing permeability of hole volumes for drilling in underground coal seam | |
CN102704950B (en) | Support method used in passing water guide fracture structure in mine exploration | |
CN108661652B (en) | Reinforcing device and method for shield starting and receiving ends in mine tunnel | |
CN204572026U (en) | A kind of Multifunctional anchor rod device | |
CN104727847A (en) | Non chain pillar gob-side entry retaining method with filling wall self-erasure | |
CN204899956U (en) | Be used for subsideing post deep hole reinforced (rfd) slip casting pipe of slip casting in advance | |
CN110566155B (en) | Circulating grouting and hole sealing method for deformation-resistant gas extraction drill hole in mining area | |
CN205135648U (en) | Rib wall caving anchor | |
CN103758483A (en) | Secondary hole sealing method for treating broken area after extraction of crossing hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151223 Termination date: 20190910 |