CN204886093U - 一种高压电线除冰器的机械手 - Google Patents
一种高压电线除冰器的机械手 Download PDFInfo
- Publication number
- CN204886093U CN204886093U CN201520704296.5U CN201520704296U CN204886093U CN 204886093 U CN204886093 U CN 204886093U CN 201520704296 U CN201520704296 U CN 201520704296U CN 204886093 U CN204886093 U CN 204886093U
- Authority
- CN
- China
- Prior art keywords
- manipulator
- deicing
- inner edge
- frame
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Manipulator (AREA)
Abstract
一种高压电线除冰器的机械手,所要解决的问题是现有的除冰技术主要有三种:机械除冰法、热力融冰法和被动除冰法。但这三种除冰方法存在着操作困难,耗能较大,技术不成熟等缺点;本实用新型的技术方案是行走机构前端设置有击锤机构;所述击锤机构包括夹式打击杆和调节齿条,调节齿条两端分别设置有调节螺栓和单向弹簧,单向弹簧的另一端与设置在夹式打击杆上的滑块固定在一起;所述行走机构下方设置有机械手,机械手包括带有电线夹器的凹字形框架、框架内缘均布有四个伸缩触点,框架底部设置有伸缩套;所述凹字形框架与电线接触部分设置有绝缘层,框架内缘为圆形或椭圆形。
Description
技术领域
本实用新型属于电线除冰技术领域,特别涉及一种对封冻的高压电线进行碎冰除冰的高压线除冰器的机械手。
背景技术
对于高压电线,严重的覆冰有可能导致故障,甚至会引发大面积停电等事故。随着我国电网规模的快速增大,近50多年来,大面积冰害事故在全国各地时有发生,尤其2008年1~2月,我国南方电网出现了持续时间较长的大范围雨雪冰冻天气,造成倒塔7377基、受损3092基,受损线路总数共计13888条。其中10mm覆冰造成的线路事故(断线、倒塔)占90%以上,导致南方输电线路大规模故障停运,引发大面积停电,给当地人民群众生活和国民经济发展造成恶劣影响。
经过调研表明,现有的除冰技术主要有三种:机械除冰法、热力融冰法和被动除冰法。但这三种除冰方法存在着操作困难,耗能较大,技术不成熟等缺点。而且无法对于线路上的固有障碍进行识别并跨越;因而需要人力进行排障无法达到自动运行。
发明内容
本实用新型的目的是提供一种对封冻的高压电线进行碎冰除冰的高压线除冰器的机械手。
本实用新型的目的是这样实现的,它包括:行走机构,其特征是:行走机构前端设置有击锤机构;所述击锤机构包括夹式打击杆和调节齿条,调节齿条两端分别设置有调节螺栓和单向弹簧,单向弹簧的另一端与设置在夹式打击杆上的滑块固定在一起;所述行走机构下方设置有机械手,机械手包括带有电线夹器的凹字形框架、框架内缘均布有四个伸缩触点,框架底部设置有伸缩套;所述凹字形框架与电线接触部分设置有绝缘层,框架内缘为圆形或椭圆形。
本实用新型的优点是:除冰可靠敲击除冰与碾压除冰相结合。击锤在前,完成高频率的敲击作业,解决电线上大块的悬冰和浮冰,振摆机构跟进,通过快速的碾压进一步除去电线表面顽固的覆冰;
机械避障无需依赖繁琐的人工操作或是稳定性欠佳的控制***规避障碍,增加除冰距离,提高机构可靠性;
模块设计可任意组合机构模块以满足不同类型的除冰需要;若换上检测装置,在非灾期间也可用于巡线;
双面破冰使用对称的机构设计实现双面破冰,既可达到良好的除冰效果,同时又能保证机器在电线上行走的稳定性。
附图说明
图1为本实用新型的结构示意简图;
图2是本实用新型的击锤机构结构示意简图;
图3是本实用新型的机械手结构示意简图。
下面将结合附图通过实例对本实用新型作进一步详细说明,但下述的实例仅仅是本实用新型其中的例子而已,并不代表本实用新型所限定的权力保护范围,本实用新型的权利保护范围以权利要求书为准。
具体实施方式
实例1
参见图1~3,行走机构3前端设置有击锤机构1;所述击锤机构包括夹式打击杆7和调节齿条4,调节齿条两端分别设置有调节螺栓5和单向弹簧6,单向弹簧的另一端与设置在夹式打击杆上的滑块8固定在一起;所述行走机构下方设置有机械手2,机械手包括带有电线夹器的凹字形框架9、框架内缘均布有四个伸缩触点10,框架底部设置有伸缩套11;所述凹字形框架与电线接触部分设置有绝缘层12,框架内缘为圆形或椭圆形。
Claims (1)
1.一种高压电线除冰器的机械手,它包括:行走机构,其特征是:行走机构前端设置有击锤机构;所述击锤机构包括夹式打击杆和调节齿条,调节齿条两端分别设置有调节螺栓和单向弹簧,单向弹簧的另一端与设置在夹式打击杆上的滑块固定在一起;所述行走机构下方设置有机械手,机械手包括带有电线夹器的凹字形框架、框架内缘均布有四个伸缩触点,框架底部设置有伸缩套;所述凹字形框架与电线接触部分设置有绝缘层,框架内缘为圆形或椭圆形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520704296.5U CN204886093U (zh) | 2015-09-14 | 2015-09-14 | 一种高压电线除冰器的机械手 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520704296.5U CN204886093U (zh) | 2015-09-14 | 2015-09-14 | 一种高压电线除冰器的机械手 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204886093U true CN204886093U (zh) | 2015-12-16 |
Family
ID=54830425
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520704296.5U Expired - Fee Related CN204886093U (zh) | 2015-09-14 | 2015-09-14 | 一种高压电线除冰器的机械手 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204886093U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105633898A (zh) * | 2016-03-29 | 2016-06-01 | 国家电网公司 | 一种高压线电缆除冰设备 |
CN106684798A (zh) * | 2016-12-29 | 2017-05-17 | 三峡大学 | 可倾斜除冰机器人 |
-
2015
- 2015-09-14 CN CN201520704296.5U patent/CN204886093U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105633898A (zh) * | 2016-03-29 | 2016-06-01 | 国家电网公司 | 一种高压线电缆除冰设备 |
CN105633898B (zh) * | 2016-03-29 | 2018-02-02 | 国家电网公司 | 一种高压线电缆除冰设备 |
CN106684798A (zh) * | 2016-12-29 | 2017-05-17 | 三峡大学 | 可倾斜除冰机器人 |
CN106684798B (zh) * | 2016-12-29 | 2018-03-16 | 三峡大学 | 可倾斜除冰机器人 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202749782U (zh) | 全过程利用倒闸操作实施的输电线路融冰*** | |
CN102638021A (zh) | 一种电力线重力冲击除冰装置及其应用 | |
CN102931609A (zh) | 带负荷更换10kV跌落式熔断器的作业方法 | |
CN103001142A (zh) | 带负荷更换10kV柱上隔离开关的作业方法 | |
CN204886093U (zh) | 一种高压电线除冰器的机械手 | |
CN104269774B (zh) | 输电线路除冰装置 | |
CN201608064U (zh) | 10kV多功能操作杆 | |
CN204089127U (zh) | 线路除冰装置 | |
CN204375507U (zh) | 防污式复合绝缘子 | |
CN202796695U (zh) | 一种隔离开关保护套 | |
CN205051306U (zh) | 一种高压电线除冰器 | |
CN201720199U (zh) | 移动式绝缘带电瓷瓶清扫机 | |
CN201984882U (zh) | 自动融冰架空导线 | |
CN205453054U (zh) | 高压线电缆除冰设备 | |
CN206323108U (zh) | 一种变电站人工除冰工具 | |
CN105490204A (zh) | 一种高压线除冰驱鸟两用设备 | |
CN201408615Y (zh) | 电力高压绝缘瓷瓶吹雪融冰装置 | |
CN201549283U (zh) | 融冰型复合绝缘子 | |
CN210866096U (zh) | 一种户外专用高压跌落式熔断器 | |
CN203991434U (zh) | 一种绝缘子清洁装置 | |
CN202957555U (zh) | 配电线路交流融冰装置 | |
CN203961418U (zh) | 一种输电塔横担 | |
CN101465532A (zh) | 一种对交流线路进行直流融冰的电路 | |
CN101887788B (zh) | 一种电力高压绝缘瓷瓶吹雪融冰装置 | |
CN204740980U (zh) | 一种带有防雷功能的水平伸缩式融冰短接刀闸 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151216 Termination date: 20170914 |