CN204875390U - Low -speed magnetic suspension roof beam among precast reinforced concrete - Google Patents

Low -speed magnetic suspension roof beam among precast reinforced concrete Download PDF

Info

Publication number
CN204875390U
CN204875390U CN201520598750.3U CN201520598750U CN204875390U CN 204875390 U CN204875390 U CN 204875390U CN 201520598750 U CN201520598750 U CN 201520598750U CN 204875390 U CN204875390 U CN 204875390U
Authority
CN
China
Prior art keywords
fuliang
magnetcisuspension
magnetic suspension
sides
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520598750.3U
Other languages
Chinese (zh)
Inventor
林晓波
黄静
谭斌
李良才
张长春
潘微旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 23rd Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Original Assignee
China Railway 23rd Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 23rd Bureau Group Co Ltd, Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd filed Critical China Railway 23rd Bureau Group Co Ltd
Priority to CN201520598750.3U priority Critical patent/CN204875390U/en
Application granted granted Critical
Publication of CN204875390U publication Critical patent/CN204875390U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Vehicles With Linear Motors And Vehicles That Are Magnetically Levitated (AREA)

Abstract

The utility model provides a low -speed magnetic suspension roof beam among precast reinforced concrete has such characteristic, include: magnetcisuspension fuliang body is the rectangle, and inside cavity, quantity are two, parallel arrangement, a plurality of linking beam evenly set up in the middle of two magnetcisuspension fuliang bodies, and both ends are connected with two magnetcisuspension fuliang bodies respectively, the concrete plummer is fixed at magnetcisuspension fuliang body top, H shaped steel sleeper is fixed on the concrete plummer, F rail tablet sets up the both sides at H shaped steel sleeper, sparse platform sets up between two magnetcisuspension fuliang bodies, and the lower extreme is fixed on the concrete plummer, the forceful electric power support sets up the both sides at sparse platform, the light current support sets up the both sides at sparse platform, the support rail platform sets up the both sides at magnetcisuspension fuliang body, and the steel sleeper, set up the both sides at the support rail platform.

Description

Low speed magnetic suspension beam in prefabricated reinforced concrete
Technical field
The utility model relates to a kind of technology of track traffic, particularly low speed magnetic suspension beam in a kind of prefabricated reinforced concrete.
Background technology
At present, known magnetic levitation technology is proposed by German engineer's Herman. Ken Peier the earliest, and has applied for magnetic suspension train patent in 1934.Nineteen thirty-five has made magnetic and has floated test model, confirms the correctness of magnetic levitation track traffic principle.After 20 century 70s, the needs promoted traffic capacity requirement along with economic development, the developed countries such as Germany, Japan, the U.S., Canada, France, Britain start to develop conductivity magnetic levitation transport system in succession, achieve the progress attracted people's attention.
It is the technical research of superconduction repulsion aerotrain that current world magnetic suspension train technology mainly contains three kinds: one, and with Japanese MAGLEV for representative, speed can reach more than 500km/h, is mainly used in intercity long distance fast transportation; Two is that normal conductive magnetism attracts floating type train technical, between the high speed city being representative with Thyssen company's T ANSRAPID, rail vehicle transportation system (adopts long stator type linear synchronous generator to drive, speed is about 430km/h), with the HSST of Japanese ITOCHU corporate agent for rail vehicle transportation system in low speed city in representative (drive with short stator type line inductance electromotor, speed is about 100km/h); The magplane that three is normal conductive magnetism repulsion type suspension systems develops with Ci Fu aircraft manufacturing company of the U.S. is for representative, and speed is 100-150km/h, adopts linear synchronous generator to drive, but does not test through the actual motion of test wire.
Magnetic levitation track girder is the carrier of magnetic suspension train, and tablet is arranged on the lower edge in box-structure rail beam both sides or T-shaped beam beam face by German high-speed maglev train.Tablet is arranged on the both sides of U-shaped beam by Japan's high-speed maglev train, requires the rail beam accuracy of manufacture≤5mm.Although the shape of high-speed maglev train beam is different, beam has very strong restraint forces to magnetic suspension train.Magnetcisuspension Fuliang is pretensioning prestressed concrete structure.
The research of China's magnetic suspension train from the eighties in 20th century.In December, 1989, the National University of Defense technology develops China's First small size magnetic suspension theory sample car.Within 1992, in " eight or five " state key Program for Tackling Key Problems is listed magnetic suspension train key technology research by country.Nineteen ninety-five, the National University of Defense technology becomes 1 magnetic bogie with Zhuzhou Electric Locomotive Institute cooperation research and development, achieves the manned operation of full-scale single bogie first.In August calendar year 2001, the China jointly developed by Southwest Jiaotong University, Changchun Passenger Train Plant and Zhuzhou Electric Locomotive Institute first magnetic levitation passenger train is completed in Changchun Passenger Train Plant and rolls off the production line.In July, 2005, the medium-and low-speed maglev train through engineering approaches sample car CMS-03A of University of Science and Technology for National Defence's design rolls off the production line in Tangshan Locomotives & Cars Plant.In year January March to 2003 calendar year 2001, the first in the world bar magnetic suspension business transport line being cooperated to build by Sino-German two countries completes construction, and design highest running speed is 430 kilometers per hour.In January, 2012, Chinese South car Zhuzhou Electric Locomotive Co produces First Chinese platform medium-and low-speed maglev train, the highest operation speed per hour 100 kilometers, every train maximum passenger capacity about 600 people.The test of locomotive is completed subsequently on its test wire.
The middle low speed magnetic suspension train min. turning radius of China's design only has 50 meters, climbing capacity can reach 41 ‰, be well suited for using in urban track traffic, train runs on rail beam, and tablet and rail beam are in same plane, during parking, train sinks Yu Liangmian, during operation, train levitation height is 8mm ~ 12mm, and therefore, the beam accuracy of manufacture and tablet installation accuracy require all very high, if there is uneven settlement of foundation, detrimental effects can be caused to the operation of train.Be the magnetic-levitation that a kind of tablet is arranged on above beam disclosed in the utility model, the outward appearance of beam is rectangle, and inside is hollow, is steel concrete post-stress structure, and every sheet beam is a track, and two panels each other tie-beam forms a round circuit.To be beam the be monolithic construction of its advantage, two panels parallel girder delay-pour joint after erection, construction, erection load are lighter.Beam body is designed by post-stress, 25m across Liang Jing live amount of deflection≤L/6500, for steady, safety, Effec-tive Function provide condition.Beam face is floated tablet structure with magnetic and is separated, and the sliding friction of not stopping and producing is not born in beam face, improves the application life of beam.The ride comfort of track can be adjusted by the setting height(from bottom) of steel tie, occurs that uneven settlement of foundation or tablet are convenient to rapid-maintenance after breaking down.
Utility model content
The utility model carries out to solve the problem, low speed magnetic suspension beam in the prefabricated reinforced concrete that object is to provide a kind of easy production, efficiency high.
Low speed magnetic suspension beam in the prefabricated reinforced concrete that the utility model provides, has such feature, comprising: magnetcisuspension Fuliang body, rectangular, inner hollow, and quantity is two, arranged in parallel; A plurality of linking beam, be evenly arranged in the middle of two magnetcisuspension Fuliang bodies, two ends are connected with two magnetcisuspension Fuliang bodies respectively; Concrete plummer, is fixed on magnetcisuspension Fuliang bodies top; H profile steel sleeper, is fixed on concrete plummer; F rail tablet, is arranged on the both sides of H profile steel sleeper; Evacuation platform, be arranged between two magnetcisuspension Fuliang bodies, lower end is fixed on concrete plummer; Forceful electric power support, is arranged on the both sides of evacuation platform; Light current support, is arranged on the both sides of evacuation platform; Track, is arranged on the both sides of magnetcisuspension Fuliang body; And steel tie, be arranged on the both sides of track.
In the prefabricated reinforced concrete that the utility model provides, low speed magnetic suspension beam, also has such feature: wherein, and magnetcisuspension Fuliang body, also has: a plurality of magnetic suspension girder tensioning hole, and the dual-side being evenly distributed on magnetcisuspension Fuliang body is inner.
In the prefabricated reinforced concrete that the utility model provides, low speed magnetic suspension beam, also has such feature: wherein, and the standard span of magnetcisuspension Fuliang body is 20 meters, 22 meters, 23 meters, 25 meters etc.
In the prefabricated reinforced concrete that the utility model provides, low speed magnetic suspension beam, also has such feature: wherein, and magnetcisuspension Fuliang body has linear beam.
In the prefabricated reinforced concrete that the utility model provides, low speed magnetic suspension beam, also has such feature: wherein, and magnetcisuspension Fuliang body has camber beam.
Utility model effect
Low speed magnetic suspension beam in prefabricated reinforced concrete involved by the utility model, adjustable high-precision model is adopted to control the outward appearance of product, deflection and the deformation direction of product is controlled with stretch-draw prestressing force, simultaneously, make concrete reduce bubble and uniform quality by layering, the substep method controlled of vibrating, reach the object controlling creep of concrete and shrink.
Accompanying drawing explanation
Fig. 1 is the structural representation of low speed magnetic suspension beam in the utility model prefabricated reinforced concrete in an embodiment;
Fig. 2 is the plan view of low speed magnetic suspension beam in the utility model prefabricated reinforced concrete in an embodiment;
Fig. 3 is the half sectional view of the utility model magnetcisuspension Fuliang in an embodiment; And
Fig. 4 is the I-I view of the utility model Fig. 3 in an embodiment.
Detailed description of the invention
Referring to drawings and Examples, low speed magnetic suspension beam in the prefabricated reinforced concrete involved by the utility model is explained in detail.
Fig. 1 is the structural representation of low speed magnetic suspension beam in the utility model prefabricated reinforced concrete in an embodiment.
Fig. 2 is the plan view of low speed magnetic suspension beam in the utility model prefabricated reinforced concrete in an embodiment.
Fig. 3 is the half sectional view of the utility model magnetcisuspension Fuliang in an embodiment.
Fig. 4 is the I-I view of the utility model Fig. 3 in an embodiment.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, in prefabricated reinforced concrete, low speed magnetic suspension beam has: magnetcisuspension Fuliang body 1, linking beam 2, concrete plummer 3, fastener 4, H profile steel sleeper 5, F rail tablet 6, evacuation platform 7, forceful electric power support 8, light current support 9 and track 10.
Magnetcisuspension Fuliang body 1 has: connecting cross beam 1-4 and beam end of body connecting cross beam 1-5 in the middle part of magnetic suspension girder tensioning hole 1-1, spilled water hole 1-2, hollow box 1-3, beam body.Magnetcisuspension Fuliang body 1 is rectangular, inner hollow, and quantity is two, arranged in parallel.Magnetcisuspension Fuliang body 1 has linear beam and camber beam two kinds, and standard span is 20 meters, 22 meters, 23 meters, 25 meters etc.
Each magnetcisuspension Fuliang body 1 has eight magnetic suspension girder tensioning hole 1-1, and the dual-side being evenly distributed on magnetcisuspension Fuliang body 1 is inner.
Spilled water hole 1-2 is arranged on the bottom of magnetcisuspension Fuliang body 1, when running into the rainy day, can drain the water away.
Hollow box 1-3 is arranged on the inside of magnetcisuspension Fuliang body 1.
In the middle part of beam body, connecting cross beam 1-4 is arranged on outside magnetcisuspension Fuliang body 1 and becomes centre position, for connecting the linking beam 2 be positioned on centre position.
Beam end of body connecting cross beam 1-5 is arranged on outside magnetcisuspension Fuliang body 1 and becomes end positions, for connecting the linking beam 2 be positioned in end positions.
Linking beam 2 is arranged in the middle of two magnetcisuspension Fuliang bodies 1, and two ends are connected with two magnetcisuspension Fuliang bodies 1 respectively.
Concrete plummer 3 is fixed on the top of magnetcisuspension Fuliang body 1, for carrying the miscellaneous part that magnetcisuspension Fuliang body 1 is placed.
Fastener 4 is arranged on concrete plummer 3.
H profile steel sleeper 5 is fixed on concrete plummer 3, and the upside of fastener 4 is fixedly connected with concrete plummer 3 by fastener 4, for placing rail.
F rail tablet 6 is arranged on the both sides of H profile steel sleeper 5.
Evacuation platform 7 is arranged between two magnetcisuspension Fuliang bodies 1, and lower end is fixed on concrete plummer 3, evacuates passenger for during passenger getting on/off.
Forceful electric power support 8 is arranged on the upper end, both sides of evacuation platform 7.
Light current support 9 is arranged on the lower end, both sides of evacuation platform 7.
Track 10 is arranged on the both sides of magnetcisuspension Fuliang body 1.
The effect of embodiment and effect
Low speed magnetic suspension beam in prefabricated reinforced concrete involved by the present embodiment, adjustable high-precision model is adopted to control the outward appearance of product, deflection and the deformation direction of product is controlled with stretch-draw prestressing force, simultaneously, make concrete reduce bubble and uniform quality by layering, the substep method controlled of vibrating, reach the object controlling creep of concrete and shrink.
Above-mentioned embodiment is preferred case of the present utility model, is not used for limiting protection domain of the present utility model.

Claims (5)

1. a low speed magnetic suspension beam in prefabricated reinforced concrete, is characterized in that, comprising:
Magnetcisuspension Fuliang body, rectangular, inner hollow, quantity is two, arranged in parallel;
A plurality of linking beam, be arranged in the middle of two described magnetcisuspension Fuliang bodies, two ends respectively magnetcisuspension Fuliang body described with two are connected;
Concrete plummer, is fixed on described magnetcisuspension Fuliang bodies top;
H profile steel sleeper, is fixed on described concrete plummer;
F rail tablet, is arranged on the both sides of described H profile steel sleeper;
Evacuation platform, be arranged between two described magnetcisuspension Fuliang bodies, lower end is fixed on described concrete plummer;
Forceful electric power support, is arranged on the both sides of described evacuation platform;
Light current support, is arranged on the both sides of described evacuation platform; And
Track, is arranged on the both sides of described magnetcisuspension Fuliang body.
2. low speed magnetic suspension beam in prefabricated reinforced concrete according to claim 1, is characterized in that:
Wherein, described magnetcisuspension Fuliang body, also has:
A plurality of magnetic suspension girder tensioning hole, the dual-side being evenly distributed on described magnetcisuspension Fuliang body is inner.
3. low speed magnetic suspension beam in prefabricated reinforced concrete according to claim 1, is characterized in that:
Wherein, the standard span of described magnetcisuspension Fuliang body is 20 meters, 22 meters, 23 meters, 25 meters etc.
4. low speed magnetic suspension beam in prefabricated reinforced concrete according to claim 1, is characterized in that:
Wherein, described magnetcisuspension Fuliang body has linear beam.
5. low speed magnetic suspension beam in prefabricated reinforced concrete according to claim 2, is characterized in that:
Wherein, described magnetcisuspension Fuliang body has camber beam.
CN201520598750.3U 2015-08-10 2015-08-10 Low -speed magnetic suspension roof beam among precast reinforced concrete Expired - Fee Related CN204875390U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520598750.3U CN204875390U (en) 2015-08-10 2015-08-10 Low -speed magnetic suspension roof beam among precast reinforced concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520598750.3U CN204875390U (en) 2015-08-10 2015-08-10 Low -speed magnetic suspension roof beam among precast reinforced concrete

Publications (1)

Publication Number Publication Date
CN204875390U true CN204875390U (en) 2015-12-16

Family

ID=54819784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520598750.3U Expired - Fee Related CN204875390U (en) 2015-08-10 2015-08-10 Low -speed magnetic suspension roof beam among precast reinforced concrete

Country Status (1)

Country Link
CN (1) CN204875390U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297561A (en) * 2015-08-10 2016-02-03 中铁二十三局集团轨道交通工程有限公司 Medium and low speed prefabricated reinforced concrete magnetic levitation beam and manufacturing method thereof
WO2017101767A1 (en) * 2015-12-17 2017-06-22 中铁第四勘察设计院集团有限公司 Double-track beam for magnetic-levitation rail-wrap-type rail transit
WO2017101768A1 (en) * 2015-12-17 2017-06-22 中铁第四勘察设计院集团有限公司 Double-track beam for rail-wrap-type rail transit
CN106985874A (en) * 2016-09-21 2017-07-28 比亚迪股份有限公司 Track for straddle type rail transit system
CN108203900A (en) * 2018-02-09 2018-06-26 北京交通大学 A kind of cross-saddle single-track traffic radial type two-orbit beam
CN108374316A (en) * 2018-02-07 2018-08-07 湖南省交通规划勘察设计院有限公司 Medium-and low-speed maglev traffic combination beam element, medium-and low-speed maglev traffic combination beam, rail system and construction method
CN109398371A (en) * 2018-11-19 2019-03-01 中铁第四勘察设计院集团有限公司 A kind of staged evacuation platform with cable bearer

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297561A (en) * 2015-08-10 2016-02-03 中铁二十三局集团轨道交通工程有限公司 Medium and low speed prefabricated reinforced concrete magnetic levitation beam and manufacturing method thereof
WO2017101767A1 (en) * 2015-12-17 2017-06-22 中铁第四勘察设计院集团有限公司 Double-track beam for magnetic-levitation rail-wrap-type rail transit
WO2017101768A1 (en) * 2015-12-17 2017-06-22 中铁第四勘察设计院集团有限公司 Double-track beam for rail-wrap-type rail transit
CN106985874A (en) * 2016-09-21 2017-07-28 比亚迪股份有限公司 Track for straddle type rail transit system
CN106985874B (en) * 2016-09-21 2019-11-08 比亚迪股份有限公司 Track for straddle type rail transit system
CN108374316A (en) * 2018-02-07 2018-08-07 湖南省交通规划勘察设计院有限公司 Medium-and low-speed maglev traffic combination beam element, medium-and low-speed maglev traffic combination beam, rail system and construction method
CN108203900A (en) * 2018-02-09 2018-06-26 北京交通大学 A kind of cross-saddle single-track traffic radial type two-orbit beam
CN109398371A (en) * 2018-11-19 2019-03-01 中铁第四勘察设计院集团有限公司 A kind of staged evacuation platform with cable bearer
CN109398371B (en) * 2018-11-19 2024-05-17 中铁第四勘察设计院集团有限公司 Stepped evacuation platform with cable support

Similar Documents

Publication Publication Date Title
CN204875390U (en) Low -speed magnetic suspension roof beam among precast reinforced concrete
CN107190595B (en) Permanent magnet suspension train track system
CN201473871U (en) Rail track of maglev train with middle and low-speed
US8272332B2 (en) Smart mass transit rail system
CN103485279A (en) Wet joint for straddle type monorail traffic
CN103276643A (en) Monorail tramcar rail using rising and falling parallel turnout
CN101992780A (en) Air public transportation method
CN103661415B (en) A kind of maglev bogie and track structure
Yan The linear motor powered transportation development and application in China
CN106835861B (en) Assembled monorail transit system
CN204875389U (en) Pillar track girder system all
Cassat et al. Maglev–worldwide status and technical review
CN105297561A (en) Medium and low speed prefabricated reinforced concrete magnetic levitation beam and manufacturing method thereof
CN102700552A (en) New-energy electric bus train hung on light rails in city
CN102874261B (en) A kind of linear motor train traveling gear
TWI577590B (en) Solar and hydrodynamic airlift system
CN204282231U (en) Tram overhead station
CN207277171U (en) A kind of straddle-seat type single traffic rail beam girder falling telescopic device
KR101566526B1 (en) Air-floating elevated structures of Light Rail Transit
CN202039259U (en) Stereoscopic road
CN202574216U (en) Urban suspension light-rail new-energy electric public-transport train
CN201816593U (en) Bridge type elevated station
CN103144639B (en) Continuous multi-stage large-span cable-stayed arch air electrified railway
WO2017145189A1 (en) System train air
CN109763386B (en) Switch braced system suitable for stride a monorail

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20180810

CF01 Termination of patent right due to non-payment of annual fee