CN204872185U - Cement pole is deposited and is used fixing device - Google Patents
Cement pole is deposited and is used fixing device Download PDFInfo
- Publication number
- CN204872185U CN204872185U CN201520440356.7U CN201520440356U CN204872185U CN 204872185 U CN204872185 U CN 204872185U CN 201520440356 U CN201520440356 U CN 201520440356U CN 204872185 U CN204872185 U CN 204872185U
- Authority
- CN
- China
- Prior art keywords
- axle
- sleeve
- cement pole
- ball
- deposited
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004568 cement Substances 0.000 title claims abstract description 48
- 238000005096 rolling process Methods 0.000 claims abstract description 8
- 238000010586 diagram Methods 0.000 description 3
- 230000006378 damage Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Landscapes
- Road Signs Or Road Markings (AREA)
Abstract
The utility model discloses a cement pole is deposited and is used fixing device, its structure includes support body, axle and rolling device, the support body constitute by two risers and a bottom plate, be connected with the riser respectively perpendicularly in the corresponding both sides of bottom plate, it has three row at least axles to arrange about between two riser inboards, every row of axle parallel is equipped with at least two, the epaxial a plurality of rolling device that evenly is equipped with the limiting plate respectively between every adjacent rolling device, the rolling device comprises sleeve and ball, the sleeve is put with the axle sleeve, at the inside through -hole that is equipped with of sleeve, be equipped with the ball in the through -hole, ball and axle rolling friction, the sleeve outside is the arcwall face to the indent. This fixing device increases than the current mode of stacking and stacks quantity, and can guarantee that the cement pole of stacking can not sideslip or turn on one's side under the same condition of area occupied, just is convenient for get and puts, and labour saving and time saving reduces intensity of labour.
Description
Technical field
The utility model relates to a kind of anchor fitting, and specifically a kind of cement pole is deposited and used anchor fitting.
Background technology
Existing cement pole is stacked basic employing taper and is stacked mode, this mode exist take store area large, utilization of area efficiency is low, stack the too high upper strata cement pole that easily causes to break away, cement pole is caused to damage and injury to personnel, for addressing this problem, existing mode adopts substantially reinforces bottom both sides cement poles, pads triangle or wedge shape anchor fitting (stone, steel etc.) is reinforced below the cement pole of bottom both sides.Upper strata cement pole first can only be removed laggard line operate by access bottom cement pole, causes work capacity to strengthen.
Utility model content
The purpose of this utility model is to provide a kind of cement pole to deposit with anchor fitting, and this anchor fitting, when area occupied is identical, increases stacking quantity than existing stacking mode, and can ensure that the cement pole stacked can not break away or turn on one's side, and be convenient to pick and place, time saving and energy saving, reduce labour intensity.
The technical scheme in the invention for solving the technical problem is: a kind of cement pole is deposited with anchor fitting, its structure comprises support body, axle and tourelle, described support body is made up of two risers and a base plate, vertically riser is connected with respectively in the corresponding both sides of base plate, be arranged above and below between inside two risers at least three row's axles, often row axle is parallel is provided with at least two, described axle is evenly provided with several tourelles, between often adjacent tourelle, is respectively equipped with positioning plate; Described tourelle is made up of sleeve and ball, and described sleeve and axle sleeve are put, and is provided with a through hole in sleeve inner, is provided with ball in described through hole, ball and axle friction of rolling; Arcwall face for concaving outside described sleeve.
Further, the two ends of described axle are fixedly connected with respectively with inside the riser of support body, the ball in described sleeve and axle point cantact.
Further, described positioning plate is a circular plate body, and the through hole of positioning plate is put with axle sleeve and is fixedly connected with.
The beneficial effects of the utility model are:
1, because the support body employing of this anchor fitting arranges riser in base plate both sides, can ensure that the cement pole stacked can not due to too high and turn on one's side, the personnel that cause are avoided to injure, the axle of many rows with tourelle is had between riser, ensure that the cement pole quantity of often arranging stacking is identical, under floor area same case, add and stack cement pole quantity, make full use of space.Owing to having sufficient distance between upper row and the axle of lower row, when picking and placeing cement pole, without the need to again upper strata cement pole being removed laggard line operate, time saving and energy saving, ensure worker safety.
If 2, due to the axle between riser being provided with individual tourelle, and be the arcwall face of indent outside the sleeve of tourelle, when placing cement pole, because cement pole is cylindrical, cement pole more can be fitted with the sleeve of arcwall face, prevents from breakking away; Because sleeve is by ball and axle point cantact, stack cement pole time only need pile from one end into, time saving and energy saving.
3, owing to being provided with positioning plate between often adjacent tourelle, prevent tourelle from moving both sides while rotation, ensure that the stability of tourelle, safety labor-saving when cement pole is stacked.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the left view of the utility model using state;
Fig. 3 is the birds-eye view of Fig. 1;
Fig. 4 is the connection diagram of support body and axle in the utility model;
Fig. 5 is the connection diagram of tourelle and axle;
Fig. 6 is the left view of Fig. 5;
Fig. 7 is using state figure of the present utility model.
In figure: 1 riser, 2 base plates, 3 axles, 4 tourelles, 41 through holes, 42 balls, 43 sleeves, 5 positioning plates, 6 cement poles.
Detailed description of the invention
With reference to Figure of description, a kind of cement pole of the present utility model is deposited and be described in detail below with anchor fitting.
As shown in Fig. 1, Fig. 3, Fig. 4, a kind of cement pole of the present utility model is deposited with anchor fitting, its structure comprises support body, axle 3 and tourelle, described support body is made up of two risers 1 and a base plate 2, riser 1 is vertically connected with respectively in the corresponding both sides of base plate 2, be arranged above and below between inside two risers 1 at least three row's axles 3, often row axle is parallel is provided with at least two, also many rows many axles can be set according to the situation in different place, increase while stacking cement pole quantity, ensure the stability of cement pole, prevent landing.
As shown in Figure 5, Figure 6, described axle 3 is evenly provided with several tourelles 4, between often adjacent tourelle, is respectively equipped with positioning plate 5; Described tourelle is made up of sleeve 43 and ball 42, and described sleeve 43 is nested with axle 3, is provided with a through hole 41, is provided with ball 42 in described through hole 41 in sleeve 43 inside, ball 42 and axle 3 friction of rolling; Arcwall face for concaving outside described sleeve 43.Because cement pole 6 is cylindrical, cement pole 6 more can be fitted with the sleeve 43 of arcwall face, prevents from breakking away; Because sleeve 43 is by ball 42 and axle 3 point cantact, only need pile from one end when stacking cement pole into, time saving and energy saving.
The two ends of described axle 3 are fixedly connected with respectively with inside the riser 1 of support body, the ball 42 in described sleeve 43 and axle 3 point cantact.Distance between two rows tourelle will ensure that cement pole slides smoothly, so that the heap of cement pole enters and takes out.
Described positioning plate is a circular plate body, and the through hole of positioning plate is put with axle sleeve and is fixedly connected with.Positioning plate, prevent tourelle from moving both sides while rotation, positioning plate ensure that the stability of tourelle, safety labor-saving when cement pole is stacked.
As Fig. 2, shown in Fig. 7, during use, at least need two these anchor fittings, be placed in the two ends of cement pole respectively, when stacking cement pole, a cement pole is stacked the tourelle axle from one end of this device, cement pole one end is contacted with sleeve arcwall face, then cement pole is piled into, be connected because tourelle rolls with axle, staff only need very little power cement pole is piled into, time saving and energy saving, and the upper cement pole quantity of stacking of each row is identical, actv. adds stacks space, also can pick and place arbitrarily the cement pole of each row, without the need to again upper strata cement pole being removed laggard line operate, time saving and energy saving, ensure worker safety.
The above, just explain through diagrams principles more of the present utility model, this specification sheets is not the utility model to be confined in shown described concrete structure and Applicable scope, therefore every corresponding modify of being likely utilized and equivalent, all belong to the scope of the claims that the utility model is applied for.
Except technical characteristic described in specification sheets, all the other technical characteristics are those skilled in the art's known technology.
Claims (3)
1. a cement pole is deposited with anchor fitting, it is characterized in that, comprise support body, axle and tourelle, described support body is made up of two risers and a base plate, vertically be connected with riser respectively in the corresponding both sides of base plate, be arranged above and below between inside two risers at least three row's axles, often row axle is parallel is provided with at least two, described axle is evenly provided with several tourelles, between often adjacent tourelle, is respectively equipped with positioning plate; Described tourelle is made up of sleeve and ball, and described sleeve and axle sleeve are put, and is provided with a through hole in sleeve inner, is provided with ball in described through hole, ball and axle friction of rolling; Arcwall face for concaving outside described sleeve.
2. a kind of cement pole according to claim 1 is deposited with anchor fitting, and it is characterized in that, the two ends of described axle are fixedly connected with respectively with inside the riser of support body, the ball in described sleeve and axle point cantact.
3. a kind of cement pole according to claim 1 is deposited with anchor fitting, and it is characterized in that, described positioning plate is a circular plate body, and the through hole of positioning plate is put with axle sleeve and is fixedly connected with.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520440356.7U CN204872185U (en) | 2015-06-24 | 2015-06-24 | Cement pole is deposited and is used fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520440356.7U CN204872185U (en) | 2015-06-24 | 2015-06-24 | Cement pole is deposited and is used fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204872185U true CN204872185U (en) | 2015-12-16 |
Family
ID=54816586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520440356.7U Expired - Fee Related CN204872185U (en) | 2015-06-24 | 2015-06-24 | Cement pole is deposited and is used fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204872185U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105947403A (en) * | 2016-07-05 | 2016-09-21 | 太仓市金毅电子有限公司 | Plastic package |
CN108190180A (en) * | 2017-12-19 | 2018-06-22 | 中国建筑第八工程局有限公司 | The device and its application method of the storage of lattice supporting member, transport and installation |
CN108216972A (en) * | 2017-11-29 | 2018-06-29 | 中车齐齐哈尔车辆有限公司 | Container and container loading method |
CN108953771A (en) * | 2018-08-20 | 2018-12-07 | 滁州市棋然装饰工程有限公司 | A kind of water power pipeline engineering plumbing installation |
CN114701735A (en) * | 2022-04-24 | 2022-07-05 | 曹银涛 | Space-saving building material stacking device for highway construction and using method thereof |
-
2015
- 2015-06-24 CN CN201520440356.7U patent/CN204872185U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105947403A (en) * | 2016-07-05 | 2016-09-21 | 太仓市金毅电子有限公司 | Plastic package |
CN108216972A (en) * | 2017-11-29 | 2018-06-29 | 中车齐齐哈尔车辆有限公司 | Container and container loading method |
CN108190180A (en) * | 2017-12-19 | 2018-06-22 | 中国建筑第八工程局有限公司 | The device and its application method of the storage of lattice supporting member, transport and installation |
CN108190180B (en) * | 2017-12-19 | 2023-11-21 | 中国建筑第八工程局有限公司 | Device for storage, transportation and installation of lattice support members and method of use thereof |
CN108953771A (en) * | 2018-08-20 | 2018-12-07 | 滁州市棋然装饰工程有限公司 | A kind of water power pipeline engineering plumbing installation |
CN114701735A (en) * | 2022-04-24 | 2022-07-05 | 曹银涛 | Space-saving building material stacking device for highway construction and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204872185U (en) | Cement pole is deposited and is used fixing device | |
CN203006065U (en) | Plastic pipe placing rack | |
CN203948793U (en) | Delivery pipe support and Vehicular concrete conveying pump | |
CN204078272U (en) | Combined hanging framework | |
CN202558275U (en) | Tray stacking system | |
CN106480898A (en) | The telescopic base structure of mountain area small load | |
CN204847572U (en) | Support frame that cable laying used | |
CN203889444U (en) | Escalator truss sectional material placement rack | |
CN209380716U (en) | A kind of head rolling machine material frame | |
CN203819670U (en) | Containerized general transport case group | |
CN203064333U (en) | Loading box convenient to stack | |
CN202489016U (en) | Shallow water seedling growing plate | |
CN202090606U (en) | Putting platform for putting steel-bar stirrup | |
CN202124459U (en) | Cap removing plate of cap remover for vacuum test tubes | |
CN204463167U (en) | Card hopper and automatic card dispenser | |
CN212224636U (en) | Building construction is platform is stacked with template in scene | |
CN205241099U (en) | Interim strorage device of body of tower round pin axle | |
CN215753594U (en) | Three-dimensional storage frame of prefabricated component | |
CN206051170U (en) | A kind of line concentrator of computer connection wire | |
CN202346119U (en) | Support for cable reel | |
CN217350362U (en) | Tool capable of stacking and hoisting stirrups | |
CN204197601U (en) | Stirrup stores lifting frame | |
CN207595486U (en) | A kind of shelf that can make tubulose class stack of goods | |
CN213324620U (en) | Steel pipe storage rack | |
CN205396962U (en) | Whole scaffold steel pipe puts things in good order frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151216 Termination date: 20200624 |