CN204850519U - Building isolation bearing change with split type jacking device - Google Patents

Building isolation bearing change with split type jacking device Download PDF

Info

Publication number
CN204850519U
CN204850519U CN201520432699.9U CN201520432699U CN204850519U CN 204850519 U CN204850519 U CN 204850519U CN 201520432699 U CN201520432699 U CN 201520432699U CN 204850519 U CN204850519 U CN 204850519U
Authority
CN
China
Prior art keywords
clamp
lower seat
utility
split type
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520432699.9U
Other languages
Chinese (zh)
Inventor
单庆斌
黄明艳
罗朝鲜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Original Assignee
YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN KUNGANG STEEL STRUCTURE CO Ltd filed Critical YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Priority to CN201520432699.9U priority Critical patent/CN204850519U/en
Application granted granted Critical
Publication of CN204850519U publication Critical patent/CN204850519U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a building isolation bearing change with split type jacking device aims at providing a convenient to use and can effectively reduce the split type jacking device that the building isolation bearing who changes the degree of difficulty changed usefulness. It includes first clamp and the second clamp of cliping bearing or lower seat from both sides, the middle part of first clamp and second clamp has the rectangular channel that bearing or lower seat are held in the cooperation, first clamp and second clamp pass through bolted connection, and are provided with first backup pad on the first clamp, are provided with the second backup pad on the second clamp. The utility model discloses a jacking device of components of a whole that can function independently form, not only simple structure easily makes, installs and removes the convenience moreover, can effectively improve the efficiency that isolation bearing changed, reduces and changes the degree of difficulty and effective reduce cost.

Description

The split type lift-up device of a kind of architectural vibration-insulation bearing replacement
Technical field
The utility model relates to architectural vibration-insulation bearing technical field, especially relates to a kind of split type lift-up device of architectural vibration-insulation bearing replacement.
Background technology
Existing shock isolating pedestal is installed on lower margin basis and between building support, when requiring replacement, must jacking upward, make it produce a gap and remove upper and lower connecting bolt, shock isolating pedestal transverse direction could be shifted out.When shock isolating pedestal jacking produces gap, be very difficult for mega structure, its difficulty is: that usually change is in some posts one, and stressed is the several times of design normal value, by beam around post and floor distortion and obtain gap.Therefore the stress point on post is arranged, upper and lower Jacking point design is all key factor.Therefore, be necessary to provide a kind of device be convenient to shock isolating pedestal and changed.
Utility model content
The utility model overcomes shortcoming of the prior art, provides a kind of structure simple, easy to use and effectively can reduce the split type lift-up device of the architectural vibration-insulation bearing replacement changing difficulty.
In order to solve the problems of the technologies described above, the utility model is achieved through the following technical solutions:
The split type lift-up device of a kind of architectural vibration-insulation bearing replacement, for the jacking of upper bearing and lower seat, described upper bearing and lower seat is provided with support ring; It comprises the first clamp and the second clamp of clamping upper bearing or lower seat from both sides, the middle part of described first clamp and the second clamp has the rectangular channel coordinating and hold upper bearing or lower seat, described first clamp and the second clamp are bolted, and the first clamp is provided with the first gripper shoe, the second clamp is provided with the second gripper shoe.
Compared with prior art, the utility model tool has the following advantages:
The utility model adopts the lift-up device of separate form, and not only structure is simple, be easy to manufacture, and mounting or dismounting is convenient, effectively can improves the efficiency that shock isolating pedestal is changed, reduce and change difficulty and effectively reduce costs.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Structural representation when Fig. 1 is shock isolating pedestal installation.
Fig. 2 is structural representation of the present utility model.
Fig. 3 is the structural representation that the utility model is changed for shock isolating pedestal.
Wherein: 1-stone bolt, 2-lower seat, 21-support ring, 31-first clamp, 32-second clamp, 33-first gripper shoe, 34-bolt, 35-second gripper shoe, 4-jack, 5-shock isolating pedestal, the upper bearing of 6-.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not paying the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Figure 1 shows that structural representation when shock isolating pedestal is installed, in figure, shock isolating pedestal 5 is installed between bearing 6 and lower seat 2, lower seat 2 is installed on ground by stone bolt 1, upper bearing 6 and lower seat 2 are provided with support ring 21, need upper bearing 6 to be separated with lower seat 2 jacking when shock isolating pedestal 5 is changed.
The split type lift-up device of the bearing replacement of architectural vibration-insulation shown in Fig. 2, for the jacking of upper bearing 6 and lower seat 2, described upper bearing 6 and lower seat 2 is provided with support ring 21; Described split type lift-up device comprises the first clamp 31 and the second clamp 32 clamping upper bearing 6 or lower seat 2 from both sides, the middle part of described first clamp 31 and the second clamp 32 has the rectangular channel coordinating and hold upper bearing 6 or lower seat 2, described first clamp 31 is connected respectively by bolt 34 with second clamp 32 left and right sides, and the first clamp about 31 two ends are respectively arranged with the first gripper shoe 33, second clamp about 32 two ends is respectively arranged with the second gripper shoe 35.
The utility model shown in Fig. 3 is used for structural representation when shock isolating pedestal 5 is changed, before lifting operation, by paired the first clamp 31, second clamp 32 of two covers respectively combination of holds be contained in lower seat 2 and upper bearing 6, make lower seat 2 and upper bearing 6 be placed in rectangular channel in the middle part of the first corresponding clamp 31, second clamp 32 respectively, then by bolt 34, first clamp 31, second clamp 32 is connected.During lifting operation, between the first gripper shoe 33, second gripper shoe 35 between lower seat 2 and upper bearing 6, put into jack 4, and two of shock isolating pedestal about 5 groups of connecting bolts are removed, can lifting operation be carried out, thus change shock isolating pedestal 5.
The utility model adopts the lift-up device of separate form, and not only structure is simple, be easy to manufacture, and mounting or dismounting is convenient, effectively can improves the efficiency that shock isolating pedestal is changed, reduce and change difficulty and effectively reduce costs.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (1)

1. the split type lift-up device of architectural vibration-insulation bearing replacement, for the jacking of upper bearing and lower seat, described upper bearing and lower seat is provided with support ring; It is characterized in that: comprise the first clamp and the second clamp of clamping upper bearing or lower seat from both sides, the middle part of described first clamp and the second clamp has the rectangular channel coordinating and hold upper bearing or lower seat, described first clamp and the second clamp are bolted, and the first clamp is provided with the first gripper shoe, the second clamp is provided with the second gripper shoe.
CN201520432699.9U 2015-06-23 2015-06-23 Building isolation bearing change with split type jacking device Expired - Fee Related CN204850519U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520432699.9U CN204850519U (en) 2015-06-23 2015-06-23 Building isolation bearing change with split type jacking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520432699.9U CN204850519U (en) 2015-06-23 2015-06-23 Building isolation bearing change with split type jacking device

Publications (1)

Publication Number Publication Date
CN204850519U true CN204850519U (en) 2015-12-09

Family

ID=54741084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520432699.9U Expired - Fee Related CN204850519U (en) 2015-06-23 2015-06-23 Building isolation bearing change with split type jacking device

Country Status (1)

Country Link
CN (1) CN204850519U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115405126A (en) * 2022-09-09 2022-11-29 中铁二院昆明勘察设计研究院有限责任公司 Quick replacement method for shock insulation support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115405126A (en) * 2022-09-09 2022-11-29 中铁二院昆明勘察设计研究院有限责任公司 Quick replacement method for shock insulation support

Similar Documents

Publication Publication Date Title
CN103730231B (en) A kind of head cover of transformer lowering or hoisting gear
CN204850519U (en) Building isolation bearing change with split type jacking device
CN202672024U (en) Novel bridge pier column
CN102996585B (en) Embracing hoop applied transformer rack assembling method
CN206988755U (en) A kind of equipment mounting base for electromechanical engineering
CN203865934U (en) Temporary suspension device of pulley lifting mechanism for electric pole
CN203846787U (en) Wallboard assembling machine
CN204876622U (en) Building isolation bearing change with inserting beam type jacking device
CN204456923U (en) Pre-embedded bolt location and installation assembly
CN204023826U (en) Magnetic crane lifting rubber earthquake isolation support
CN204510265U (en) Adjustable height inspection well cover
CN204097973U (en) Hydraulic rotary locking device for plane gate and trash rack
CN203495535U (en) Hinging type construction device for installation and removal of gantry crane
CN206105775U (en) Support frock of engine restoration usefulness
CN104167850A (en) Motor support
CN205592317U (en) A hydro -cylinder support for bumper shock absorber
CN204156348U (en) A kind of novel floor-embedded switch cubicle
CN205740111U (en) A kind of electric pole gold utensil stringer used for operation maintenance of ascending a height
CN204551744U (en) A kind of tin core rubber earthquake isolation support
CN204028241U (en) The sub-electrical property experiment device of three phase isolated
CN213039296U (en) Hydraulic support with safety limiting structure
CN209738796U (en) Manual fender engine support
CN203361224U (en) Steel brush attached to hydraulic grab
CN201647796U (en) Turnover tool for wind-driven generator
CN205389675U (en) Flowerpot self -lock device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

CF01 Termination of patent right due to non-payment of annual fee