CN204850397U - Take turn down rims elevartor shaft operation platform - Google Patents
Take turn down rims elevartor shaft operation platform Download PDFInfo
- Publication number
- CN204850397U CN204850397U CN201520540899.6U CN201520540899U CN204850397U CN 204850397 U CN204850397 U CN 204850397U CN 201520540899 U CN201520540899 U CN 201520540899U CN 204850397 U CN204850397 U CN 204850397U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- platform frame
- utility
- model
- operating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a take turn down rims elevartor shaft operation platform, relates to building construction field. The utility model discloses an operation platform frame, landing slab, two sets of stand, operation platform frame level sets up in the top of two sets of stands, every assemblage post includes a root length stand and a short stand respectively, connect a diagonal brace respectively at the lower extreme of every assemblage post, the one end of every diagonal brace all is equipped with vertical support, and the other end all is equipped with the angle support, the landing slab passes through the top of bolted connection at the operation platform frame, top symmetry at the operation platform frame sets up a pair of rings, at the hinged joint of difference all around of operation platform frame drop in leaf. The utility model discloses it is stable to pass power, and the atress is effectual, and the preparation is convenient, at the bottom of the price, reduces intensity of labour, guarantees construction quality.
Description
Technical field
The utility model relates to the realm of building construction.
Background technology
In modern architecture construction, elevator shaft is very common component, elevator shaft is through absolutely from basis to roof, centre does not have floor layer, but during upper elevator well construction, need to arrange support in well, when doing the work such as wiping manipulation ash in well, also operating platform is needed, during traditional construction, ground steel pipe scaffold can be set up from basis, constantly up set up along with the increase of housing construction level, and put forth effort layer in certain storey setting, putting forth effort layer is set up again, operation layer lays scaffold floor, and carry out necessary protection, the steel pipe amount that this way drops into is very large, time-consumingly to take a lot of work, affect the duration adversely, easy initiation quality problems, and safety is not high, people have also been made other some attempt, but effect is not fine, especially secure context can not meet the demands, a kind of band flange elevator shaft Novel operating plateform system efficiently solves this problem.
Utility model content
The purpose of this utility model is to provide a kind of convenient processing, greatly can improve operating condition, improve the hoistway operation platform of the band flange of construction safety.
The utility model comprises operating platform frame, landing slab, two groups of columns; Described operating platform frame is horizontally placed on the top of two groups of columns; Often organize column and comprise a long column and a short column respectively; Connect a hound respectively in the lower end often organizing column, one end of every root hound is equipped with vertical support, and the other end is equipped with angle bearing; Described landing slab is bolted above operating platform frame; A pair suspension ring is symmetrical arranged above described operating platform frame; At the surrounding chain connection drop in leaf respectively of described operating platform frame.
During the utility model construction, according to the size of elevator shaft, the good operation platform system of processing and fabricating, strict controlling dimension, carries out antirust treatment, ensures that turnover panel freedom and flexibility can be stirred, and leans against on landing slab by down tilt in turnover panel, first two-layer elevator shaft is arrived in the good bottom one of construction according to a conventional method, after borehole wall maintenance to prescribed strength, the installation of plateform system can be carried out, by hanging device, plateform system is hung in elevator shaft, vertical support is allowed to be close to elevator shaft inwall, just strictly be stuck on the right angle concrete at elevator entrance door place with hour angle bearing, and adjust, make support body straight, turnover panel is overturn to horizontal direction, and rely on the inwall of elevator shaft, ensure that the panel of operating platform is covered with whole elevator shaft, so far platform is just put up, can at top-operation, after the construction of this operation layer, after foreign material on clear and upright platform, construct to upper strata with crane gear lifting, so repeatedly, until complete.
The utility model, to elevator shaft all standing, without any foreign material tenesmus, does not need separately to lay scaffold floor, construction civilization degree is high, and the utility model can be processed according to different elevator shafts, a terraced plateform system, flexible use, power have been passed to by the bearing at two ends on the building unit that completed by the utility model, is not pass to bottom ground, power transmission is stablized, stressed effect is good, easy to make, at the bottom of price, reduce labour intensity, ensure construction quality.
The utility model is oblique respectively between described often group column arranges bracing piece, strengthens stability.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is using state figure of the present utility model.
Fig. 3 is the structural representation of landing slab of the present utility model.
Detailed description of the invention
As shown in Figure 1, 2, 3, the utility model comprises operating platform frame 1, landing slab 2, two groups of columns 3; Operating platform frame 1 is horizontally placed on the top of two groups of columns 3; Often organize column 3 and comprise an a long column 3-1 and short column 3-2 respectively; Connect a hound 4 respectively in the lower end often organizing column 3, one end of every root hound 4 is equipped with vertical support 5, and the other end is equipped with angle bearing 6; Obliquely respectively between column 3 arrange bracing piece 9 often organizing, landing slab 2 is bolted above operating platform frame 1; A pair suspension ring 7 is symmetrical arranged above operating platform frame 1; At the surrounding chain connection drop in leaf 8 respectively of operating platform frame 1.
Claims (2)
1. the hoistway operation platform with flange, is characterized in that: comprise operating platform frame, landing slab, two groups of columns; Described operating platform frame is horizontally placed on the top of two groups of columns; Often organize column and comprise a long column and a short column respectively; Connect a hound respectively in the lower end often organizing column, one end of every root hound is equipped with vertical support, and the other end is equipped with angle bearing; Described landing slab is bolted above operating platform frame; A pair suspension ring is symmetrical arranged above described operating platform frame; At the surrounding chain connection drop in leaf respectively of described operating platform frame.
2. a kind of hoistway operation platform with flange according to claim 1, is characterized in that: obliquely respectively between column arrange bracing piece described often group.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520540899.6U CN204850397U (en) | 2015-07-24 | 2015-07-24 | Take turn down rims elevartor shaft operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520540899.6U CN204850397U (en) | 2015-07-24 | 2015-07-24 | Take turn down rims elevartor shaft operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204850397U true CN204850397U (en) | 2015-12-09 |
Family
ID=54740962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520540899.6U Expired - Fee Related CN204850397U (en) | 2015-07-24 | 2015-07-24 | Take turn down rims elevartor shaft operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204850397U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971262A (en) * | 2016-04-20 | 2016-09-28 | 胡彦彬 | Folding tool type wall attachment supporting working platform |
CN106522534A (en) * | 2016-12-19 | 2017-03-22 | 中冶天工集团有限公司 | Operating platform bracket for reinforced concrete elevator shaft construction |
-
2015
- 2015-07-24 CN CN201520540899.6U patent/CN204850397U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971262A (en) * | 2016-04-20 | 2016-09-28 | 胡彦彬 | Folding tool type wall attachment supporting working platform |
CN105971262B (en) * | 2016-04-20 | 2018-01-30 | 胡彦彬 | A kind of attached wall support operation post of foldable tool formula |
CN106522534A (en) * | 2016-12-19 | 2017-03-22 | 中冶天工集团有限公司 | Operating platform bracket for reinforced concrete elevator shaft construction |
CN106522534B (en) * | 2016-12-19 | 2019-08-23 | 中冶天工集团有限公司 | Armored concrete construction of lift well operating platform bracket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204850397U (en) | Take turn down rims elevartor shaft operation platform | |
CN102877637A (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
CN105464358A (en) | Multi-layer construction basket | |
CN110371823A (en) | Self-carry suitable for the additional elevator construction of assembled rises hanging device and construction method | |
CN208586885U (en) | A kind of novel hanging basket lateral traction bracket | |
CN202451040U (en) | Perpendicular high-altitude crawling ladder | |
CN104131706A (en) | Vertical steel bar two-layer connecting structure of concrete framework structure and construction method of vertical steel bar two-layer connecting structure | |
CN205575534U (en) | Lattice formula groined type support body lifting means | |
CN206769351U (en) | A kind of regularization hoistway operation platform hoisting frame | |
CN207582929U (en) | Adhesion type elevating construction platform | |
CN207144446U (en) | A kind of construction Skidproof hanging cradle | |
CN205116854U (en) | Coal scuttle is portable platform for aggregate erection | |
CN204980945U (en) | Supplementary tower crane dismounting device | |
CN205348720U (en) | Take hoisting device's removal scaffold | |
CN203624932U (en) | Portable indoor material lifter | |
CN208830765U (en) | Prefabricated balcony supporting apparatus | |
CN107461029B (en) | Lower hanging beam pouring forming device based on hydraulic climbing formwork system setting | |
CN205296804U (en) | Protective cage structure in elevator shaft | |
CN218538895U (en) | Safety device for manned lifting hanging basket of building tower crane | |
CN206397107U (en) | Armored concrete construction of lift well operating platform bracket | |
CN201678398U (en) | High-rise indoor object-suspending device | |
CN205778473U (en) | A kind of removable straight steel ladder | |
CN208280571U (en) | A kind of external wall coat of paint maintenance hanging basket | |
CN211949526U (en) | Annular double rail | |
CN203201130U (en) | Operation platform system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151209 Termination date: 20180724 |
|
CF01 | Termination of patent right due to non-payment of annual fee |