CN204847654U - Elevator mechanically prevents device down - Google Patents

Elevator mechanically prevents device down Download PDF

Info

Publication number
CN204847654U
CN204847654U CN201520519606.6U CN201520519606U CN204847654U CN 204847654 U CN204847654 U CN 204847654U CN 201520519606 U CN201520519606 U CN 201520519606U CN 204847654 U CN204847654 U CN 204847654U
Authority
CN
China
Prior art keywords
connecting rod
digging line
wire digging
permanent seat
holdout device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520519606.6U
Other languages
Chinese (zh)
Inventor
程本纲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xini Electromechanical Group Co ltd
Original Assignee
SYNEY ELEVATOR (HANGZHOU) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SYNEY ELEVATOR (HANGZHOU) CO Ltd filed Critical SYNEY ELEVATOR (HANGZHOU) CO Ltd
Priority to CN201520519606.6U priority Critical patent/CN204847654U/en
Application granted granted Critical
Publication of CN204847654U publication Critical patent/CN204847654U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

The utility model relates to an elevator mechanically prevents device down, including connecting rod fixing seat, link mechanism, its characterized in that: the last link mechanism that installs of connecting rod fixing seat, link mechanism links to each other with the steel wire cable, and the action of steel wire cable control link mechanism makes link mechanism be in fold condition to it is down to prevent the electricity to be passed, and resets through automatic the drawing in in of compression spring. Its advantage lies in: 1. It is little to adopt link mechanism occupation space, 2. Steel wire cable fixing base is fixed and is done the position that personnel easily are close to the check man. The console switch mounted position is unrestricted.

Description

A kind of elevator down mechanical holdout device
Technical field
The utility model belongs to elevator components, is specifically related to a kind of elevator down mechanical holdout device.
Background technology
During overhauling elevator, overhauling elevator personnel generally will enter the on site maintenance that the top layer of hoistway or pit carry out elevator, and period ensures particularly important to service personnel personal safety.Elevator down mechanical holdout device is elevator pit height not being met to GB/T7588-5.7.3.3 safety requirements, the elevator down mechanical holdout device arranged during maintenance, the safety of protection pit overhaul personnel.
At present, existing elevator down mechanical holdout device structure is comparatively complicated, thus take up room comparatively large, and operating switch installation site is restricted, is not easy to operated by personnel.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of elevator down mechanical holdout device that is less, convenient operation that takes up room, the safety of protection pit overhaul personnel.
In order to solve the problems of the technologies described above, the utility model by the following technical solutions:
A kind of elevator down mechanical holdout device, comprise connecting rod permanent seat, connecting rod mechanism, it is characterized in that: installing connecting rods mechanism on connecting rod permanent seat, connecting rod mechanism is connected with wire digging line, wire digging line control link mechanism action, connecting rod mechanism is made to be in folded state, descending to stop electricity to be passed, and automatically draw reset in by Compress Spring.
Described connecting rod mechanism comprises first connecting rod, second connecting rod and third connecting rod, first connecting rod, second connecting rod, third connecting rod are articulated successively, first connecting rod can move up and down along cage guide direction, during first connecting rod action, connecting rod mechanism is in folded state, now second connecting rod crosses out guide rail, descending to stop electricity to be passed.
Described wire digging line one end is connected with first connecting rod, and the other end is fixed on through wire digging line sleeve pipe and triggers on spanner.
It is provided with wire digging line permanent seat in addition, and wire digging line permanent seat is provided with and triggers spanner snap close.
Described wire digging line permanent seat is fixed on the position that service work personnel are easy to close.
Described connecting rod fixed seating is provided with electrical contact switch in the top position place of first connecting rod.
The utility model compared with prior art has following beneficial effect:
1. adopt connecting rod mechanism to take up room little; 2. wire digging line permanent seat is fixed on the position that service work personnel are easy to close.Operating switch installation site is unrestricted.
Accompanying drawing explanation
Fig. 1 is the utility model running state structural representation diagram
Fig. 2 is the utility model inspecting state structural representation diagram.
In figure: 1. electrical contact switch 2. wire digging line sleeve pipe 3. wire digging line 4. wire digging line permanent seat 5. guide rail 6. connecting rod permanent seat 7. connecting rod mechanism 8. Compress Spring 9. triggers spanner 10. and triggers spanner snap close.
Detailed description of the invention
See Fig. 1, Fig. 2, the utility model comprises electrical contact switch 1, wire digging line sleeve pipe 2, wire digging line 3, wire digging line permanent seat 4, connecting rod permanent seat 6, connecting rod mechanism 7, Compress Spring 8, trigger spanner 9, connecting rod permanent seat 6 is fixed on guide rail 5 by pressing plate height on demand, wire digging line permanent seat 4 is fixed on the position that service work personnel are easy to close, connecting rod permanent seat 6 is provided with connecting rod mechanism 7, connecting rod mechanism 7 is connected with wire digging line 3, connecting rod mechanism 7 is by wire digging line 3 control action, connecting rod mechanism is made to be in folded state, descending to stop electricity to be passed, and automatically draw reset in by Compress Spring 8.
Connecting rod mechanism 7 comprises first connecting rod 11, second connecting rod 12 and third connecting rod 13, first connecting rod 11, second connecting rod 12, third connecting rod 13 are articulated successively, first connecting rod 11 can move up and down along guide rail direction, during first connecting rod action, connecting rod mechanism is in folded state, now second connecting rod 12 crosses out guide rail 5, descending to stop electricity to be passed, and the top position place that connecting rod permanent seat 6 is positioned at first connecting rod 11 is provided with electrical contact switch 1.
Wire digging line 3 one end is connected with first connecting rod 11, and the other end is fixed on through wire digging line sleeve pipe 2 and triggers on spanner 9, and wire digging line permanent seat 4 is provided with and triggers spanner snap close 10, and connecting rod permanent seat is provided with the sleeve pipe installing Compress Spring 8.
See Fig. 1, when elevator normally runs, make connecting rod mechanism 7 be in rounding state by Compress Spring 8 tension force upwards, now first connecting rod 11 upper end and electrical contact switch 1 inconsistent, make electrical contact switch 1 be in closure state.
See Fig. 2, during overhauling elevator, also pin with triggering spanner snap close 10 to fixed position by triggering spanner 9 downwards, make Compress Spring compress 8 by wire digging line 3 pulling force, drive first connecting rod 11 descending, and drive second connecting rod 12, third connecting rod 13 action, second connecting rod 23 is made to cross out guide rail 5, descending to stop electricity to be passed, first connecting rod 11 and electrical contact switch 1 depart from simultaneously, make electrical contact switch 1 be in off-state.

Claims (6)

1. an elevator down mechanical holdout device, comprise connecting rod permanent seat, connecting rod mechanism, it is characterized in that: installing connecting rods mechanism on connecting rod permanent seat, connecting rod mechanism is connected with wire digging line, wire digging line control link mechanism action, connecting rod mechanism is made to be in folded state, descending to stop electricity to be passed, and automatically draw reset in by Compress Spring.
2. a kind of elevator down mechanical holdout device as claimed in claim 1, it is characterized in that: described connecting rod mechanism comprises first connecting rod, second connecting rod and third connecting rod, first connecting rod, second connecting rod, third connecting rod are articulated successively, first connecting rod can move up and down along cage guide direction, during first connecting rod action, connecting rod mechanism is in folded state, and now second connecting rod crosses out guide rail, descending to stop electricity to be passed.
3. a kind of elevator down mechanical holdout device as claimed in claim 2, is characterized in that: wire digging line one end is connected with first connecting rod, and the other end is fixed on through wire digging line sleeve pipe and triggers on spanner.
4. a kind of elevator down mechanical holdout device as claimed in claim 1, is characterized in that: it is provided with wire digging line permanent seat in addition, and wire digging line permanent seat is provided with and triggers spanner snap close.
5. a kind of elevator down mechanical holdout device as claimed in claim 4, is characterized in that: wire digging line permanent seat is fixed on the position that service work personnel are easy to close.
6. a kind of elevator down mechanical holdout device as claimed in claim 2, is characterized in that: connecting rod fixed seating is provided with electrical contact switch in the top position place of first connecting rod.
CN201520519606.6U 2015-07-17 2015-07-17 Elevator mechanically prevents device down Active CN204847654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520519606.6U CN204847654U (en) 2015-07-17 2015-07-17 Elevator mechanically prevents device down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520519606.6U CN204847654U (en) 2015-07-17 2015-07-17 Elevator mechanically prevents device down

Publications (1)

Publication Number Publication Date
CN204847654U true CN204847654U (en) 2015-12-09

Family

ID=54738227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520519606.6U Active CN204847654U (en) 2015-07-17 2015-07-17 Elevator mechanically prevents device down

Country Status (1)

Country Link
CN (1) CN204847654U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106892309A (en) * 2017-03-08 2017-06-27 浙江巨人控股有限公司 Device is prevented under a kind of home lift

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106892309A (en) * 2017-03-08 2017-06-27 浙江巨人控股有限公司 Device is prevented under a kind of home lift

Similar Documents

Publication Publication Date Title
CN101301976B (en) Integrated security device of elevator
CN101920880B (en) Speed-limiting control device of home elevator
CN203545377U (en) Machine-room-free one-way speed limiter
CN102491144A (en) Rope breakage protecting device for main unit of flat-bottomed steep tank
CN204847654U (en) Elevator mechanically prevents device down
CN101700850B (en) Elevator stopping device
CN201028435Y (en) Suspending elevator apparatus
CN102359263A (en) Automatic falling preventing device for integral lifting scaffold
CN201914800U (en) Top-rushing prevention device of construction elevator
CN204958077U (en) Flexible toeguard at bottom of elevator sedan -chair
CN204958045U (en) Elevator electromagnetic braking device
CN208454243U (en) Elevator counterweight safety device
CN203556107U (en) Foot fastener for pole climbing
CN202831604U (en) Anti-falling and anti-rolling guide unloading support
CN201746188U (en) Speed limit controlling means for home elevators
CN104370239A (en) Mechanical brake release device of machine-room-less lift brake
CN202248828U (en) Automatic falling-preventing device for integrally lifted scaffold
CN203566854U (en) Manual-automatic integrated unloading block frame and rail-mounted concrete mixer
CN107221902B (en) A kind of special assistance platform of overhead type busbar ceramic insulator
CN205617870U (en) Protection device that falls is prevented in stereo garage special use
CN2758218Y (en) Rope clamping device for elevator lifting over speed
CN201703930U (en) Rotatable integrated upper holdout device for home elevator
CN203690776U (en) Pulling-pressing structure of interlocking device
CN101139061A (en) Elevator rolling-proof device
CN204251166U (en) A kind of counterweight

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171023

Address after: 311227 west of Yangcheng Road, Nanyang Street Economic and Technological Development Zone, Xiaoshan District, Hangzhou, Zhejiang

Patentee after: SYNEY ELECTRIC (HANGZHOU) CO.,LTD.

Address before: 311227 No. 31 Yangcheng Road, Nanyang Development Zone, Hangzhou, Zhejiang, Xiaoshan

Patentee before: SYNEY ELEVATOR (HANGZHOU) Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 18 Xinta Jinshen Road, Lili Town, Wujiang District, Suzhou City, Jiangsu Province, 215200

Patentee after: Xini Electromechanical Group Co.,Ltd.

Address before: 311227 west side of Yangcheng Avenue, Nanyang Street Economic and Technological Development Zone, Xiaoshan District, Hangzhou City, Zhejiang Province

Patentee before: SYNEY ELECTRIC (HANGZHOU) CO.,LTD.