CN204832468U - A accelerated test system for single -phase electric energy meter battery life - Google Patents

A accelerated test system for single -phase electric energy meter battery life Download PDF

Info

Publication number
CN204832468U
CN204832468U CN201520582571.0U CN201520582571U CN204832468U CN 204832468 U CN204832468 U CN 204832468U CN 201520582571 U CN201520582571 U CN 201520582571U CN 204832468 U CN204832468 U CN 204832468U
Authority
CN
China
Prior art keywords
electric energy
energy meter
phase electric
accelerated test
battery life
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520582571.0U
Other languages
Chinese (zh)
Inventor
周超
徐晴
刘建
祝宇楠
田正其
龚丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520582571.0U priority Critical patent/CN204832468U/en
Application granted granted Critical
Publication of CN204832468U publication Critical patent/CN204832468U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tests Of Electric Status Of Batteries (AREA)

Abstract

The utility model discloses an accelerated test system for single -phase electric energy meter battery life, including the warm and humid hot case of programme -controlled height, examine single -phase electric energy meter, programmable power supply, load box and intelligent ammeter control cabinet, examined single -phase electric energy meter and placed at the warm and humid hot incasement of programme -controlled height, it is connected with the intelligent ammeter control cabinet through the S485 -RS232 converter to be examined single -phase electric energy meter, the intelligent ammeter control cabinet is connected with the warm and humid hot case of programme -controlled height, the load box, programmable power supply is connected with the intelligent ammeter control cabinet respectively, programmable power supply, the load box is still examined single -phase electric energy meter with the quilt and is connected. The utility model discloses a simulate and trigger complex operating condition such as stopping telegram in reply incident, different humitures under the real load operating mode, bring out the operation of electric energy meter in line processing ware and at high consumption state, quicken the battery discharge process, obtain the battery life accelerated test value, be used for assessing the life -span under the on -the -spot operating environment of single -phase electric energy meter battery, have good application prospect.

Description

A kind of accelerated test system for single-phase electric energy meter battery life
Technical field
The utility model belongs to intelligent electric energy meter operational reliability technical field of measurement and test, is specifically related to a kind of accelerated test system for single-phase electric energy meter battery life.
Background technology
Along with the iterative method of State Grid Corporation of China's power information acquisition system construction project, increasing intelligent electric energy meter has been put in on-the-spot operation, the functions such as electric energy metrical, the timing of intelligent electric energy meter are freezed, load record are all based upon on the basis of accurate timing, and the prerequisite of accurate timing is normal power supply.Due to, in current state net single-phase electric energy meter design proposal, battery is as Clock battery and working power for subsequent use two kinds of purposes.For the electric energy meter of on-the-spot actual motion, when power network line normal power supply, battery is only powered to clock module, when power network line is in power down mode, when working power for subsequent use made by battery, the multichannel module for power supply such as CPU, liquid crystal, clock chip, storage capacitor to be supported simultaneously, once battery cannot normal power supply, the catastrophic failure that single-phase electric energy meter is relevant with timing will be brought out.
At present, be by carrying out separately battery to the detection for single-phase electric energy meter battery performance, the test of the coherent detection project such as such as " open-circuit voltage ", " external short circuit ", " improper charge test ", " forced electric discharge test ".Although, although these method of testings can assess the state of battery to a certain extent, but, these methods do not relate to the factor such as design proposal, actual operating mode of single-phase electric energy meter itself, testing result often has a tremendous difference with battery life in on-the-spot actual motion, and there will be battery cannot the hidden danger of normal power supply.
Utility model content
The utility model to solve in above-mentioned prior art the detection for single-phase electric energy meter battery performance be by carrying out separately battery, do not relate to the factors such as the design proposal of single-phase electric energy meter itself, actual operating mode, the problem that testing result often has a tremendous difference with battery life in on-the-spot actual motion.
In order to achieve the above object, the technical scheme that the utility model adopts is:
A kind of accelerated test system for single-phase electric energy meter battery life, it is characterized in that: comprise program control high/low temperature damp heat box, tested single-phase electric energy meter, programmable power supply, load box and intelligent electric energy meter control desk, described tested single-phase electric energy meter is placed in program control high/low temperature damp heat box, described tested single-phase electric energy meter is connected by R485 serial communication interface one end with RS485-RS232 converter, the other end of described RS485-RS232 converter is connected with intelligent electric energy meter control desk, described intelligent electric energy meter control desk is also connected with program control high/low temperature damp heat box by RS232 serial communication interface or network interface, described load box, programmable power supply is connected with intelligent electric energy meter control desk respectively by RS232 serial communication interface or network interface, described programmable power supply, load box is also connected with tested single-phase electric energy meter by power lead.
The aforesaid accelerated test system for single-phase electric energy meter battery life, it is characterized in that: the temperature of described program control high/low temperature damp heat box arranges scope between-45 DEG C ~ 75 DEG C, humidity arranges scope between 0-100%RH, the humiture environment in simulation single-phase electric energy meter actual motion.
The aforesaid accelerated test system for single-phase electric energy meter battery life, is characterized in that: described load box comprises electric current 5A, 10A, 20A and power factor 1.0,0.5L, 0.8C combination in any gear, real load during simulation single-phase electric energy meter on-site runs.
The beneficial effects of the utility model are: the accelerated test system and method for single-phase electric energy meter battery life of the present utility model, telegram in reply event is stopped by triggering under simulation actual loading operating mode, the complex working conditions such as different humitures, bring out electric energy meter inner treater and operate in high power consumption state, accelerate battery discharge procedure, thus obtain different humiture, electric energy meter battery life accelerated test value under different load, this value can be used for assessing the life-span under the on-the-spot running environment of single-phase electric energy meter battery, for the quality control of electric energy meter provides technical support, have a good application prospect.
Accompanying drawing explanation
Fig. 1 is the system chart of the accelerated test system for single-phase electric energy meter battery life of the present utility model.
Fig. 2 is the Work condition analogue schematic diagram stopping telegram in reply control strategy of the accelerated test method for single-phase electric energy meter battery life of the present utility model.
Fig. 3 is the voltage-time curve schematic diagram of battery in single-phase electric energy meter of the present utility model.
Embodiment
Below in conjunction with Figure of description, the utility model is further described.
Accelerated test system for single-phase electric energy meter battery life of the present utility model, as shown in Figure 1, comprise program control high/low temperature damp heat box, tested single-phase electric energy meter, programmable power supply, load box and intelligent electric energy meter control desk, described tested single-phase electric energy meter is placed in program control high/low temperature damp heat box, described tested single-phase electric energy meter is connected by R485 serial communication interface one end with RS485-RS232 converter, the other end of described RS485-RS232 converter is connected with intelligent electric energy meter control desk, described intelligent electric energy meter control desk is also connected with program control high/low temperature damp heat box by RS232 serial communication interface or network interface, described load box, programmable power supply is connected with intelligent electric energy meter control desk respectively by RS232 serial communication interface or network interface, described programmable power supply, load box is also connected with tested single-phase electric energy meter by power lead.
The temperature of described program control high/low temperature damp heat box arranges scope between-45 DEG C ~ 75 DEG C, and humidity arranges scope between 0-100%RH, the humiture environment in simulation single-phase electric energy meter actual motion.
Described load box comprises electric current 5A, 10A, 20A and power factor 1.0,0.5L, 0.8C combination in any gear, real load during simulation single-phase electric energy meter on-site runs.
Based on the accelerated test method of the above-mentioned accelerated test system for single-phase electric energy meter battery life, comprise the following steps,
Step (1), is placed on tested single-phase electric energy meter in program control high/low temperature damp heat box, and connects programmable power supply and load box, is arranged the temperature T of program control high/low temperature damp heat box by intelligent electric energy meter control desk 1be 75 DEG C, humidity W 1for 80%RH, the operating voltage U being boosted to tested single-phase electric energy meter by intelligent electric energy meter control desk control programmable power supply is 220V, controls by intelligent electric energy meter control desk the load gear choosing load box;
Step (2), intelligent electric energy meter control desk reads the initial voltage V of battery in single-phase electric energy meter 0, intelligent electric energy meter control desk reads single-phase electric energy meter initial voltage of battery according to " DL/T645-2007 multifunctional electric energy meter communication protocol ";
Step (3), because battery in single-phase electric energy meter design proposal needs to power to single-phase electric energy meter inner treater under power-down conditions, research shows that electric energy meter is constantly stopping event procedure a large amount of read-write operation that will carry out instantaneously in power down due to processor of sending a telegram in reply, battery power consumption is maximum, thus set up the control strategy that single-phase electric energy meter carries out stopping telegram in reply event, control strategy process is as follows
(1) single-phase electric energy meter is boosted to 220V duration t1, then have a power failure and duration t2;
(2) single-phase electric energy meter is boosted to 220V duration t3 again, then have a power failure and duration t4;
(3) single-phase electric energy meter is boosted to 220V duration t5 again, then have a power failure and duration t6;
(4) single-phase electric energy meter is boosted to 220V duration t1 again, repeat (1) sequential loop to carry out, as shown in Figure 2, the Work condition analogue schematic diagram of control strategy, t1 is 40s, t2 be 50ms, t3 be 30s, t4 be 200ms, t5 be 20s, t6 is 600ms, adjustable according to actual conditions;
Step (4), in step (3), intelligent electric energy meter control desk is with cycle T cmeasure the cell voltage V in single-phase electric energy meter i, corresponding moment when measuring cell voltage.Cycle T cfor 100s, adjustable according to actual conditions;
Step (5), intelligent electric energy meter control desk controls programmable power supply to carry out stopping telegram in reply event according to the control strategy that step (3) is set up continuously, the processor triggered in single-phase electric energy meter constantly resets, accelerate the discharge process of battery, until intelligent electric energy meter control desk detects the cell voltage V in single-phase electric energy meter ilower than battery undervoltage threshold voltage V settime, stop test, and record duration of test runs T end;
Step (6), intelligent electric energy meter control desk forms voltage-time curve V (t) of battery in single-phase electric energy meter according to step (5), as shown in Figure 3, and according to formula (1), calculate single-phase electric energy meter battery life accelerated test value BL
B L = ∫ 0 T e n d V ( t ) d t V 0 · T e n d T e n d - - - ( 1 )
Step (7), the quantity choosing same batch of single-phase electric energy meter is N, tests, obtain the battery life accelerated test value BL of each single-phase electric energy meter according to above-mentioned steps (1)-step (6) 1, BL 2, BL 3... BL n, and according to formula (2), calculate the mean lifetime value BL of this batch of single-phase electric energy meter ave,
BL a v e = Σ i = 1 N BL i N - - - ( 2 )
Wherein, BL iit is the battery life accelerated test value of i-th single-phase electric energy meter;
Step (8), according to above-mentioned steps (1)-step (7), by intelligent electric energy meter control desk, different temperature values, different humidity values, different load gears are set, test corresponding temperature value, humidity value, load gear, mean lifetime value in same batch of single-phase electric energy meter under test various combination operating mode, respectively in order to assess the battery operation life at the scene in single-phase electric energy meter.
In sum, accelerated test system and method for single-phase electric energy meter battery life of the present utility model, the complex working conditions such as telegram in reply event, different humitures are stopped by triggering under simulation actual loading operating mode, bring out electric energy meter inner treater and operate in high power consumption state, accelerate battery discharge procedure, thus electric energy meter battery life accelerated test value under obtaining different humiture, different load, this value can be used for assessing the life-span under the on-the-spot running environment of single-phase electric energy meter battery, for the quality control of electric energy meter provides technical support, have a good application prospect.
More than show and describe ultimate principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and instructions just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (3)

1. the accelerated test system for single-phase electric energy meter battery life, it is characterized in that: comprise program control high/low temperature damp heat box, tested single-phase electric energy meter, programmable power supply, load box and intelligent electric energy meter control desk, described tested single-phase electric energy meter is placed in program control high/low temperature damp heat box, described tested single-phase electric energy meter is connected by R485 serial communication interface one end with RS485-RS232 converter, the other end of described RS485-RS232 converter is connected with intelligent electric energy meter control desk, described intelligent electric energy meter control desk is also connected with program control high/low temperature damp heat box by RS232 serial communication interface or network interface, described load box, programmable power supply is connected with intelligent electric energy meter control desk respectively by RS232 serial communication interface or network interface, described programmable power supply, load box is also connected with tested single-phase electric energy meter by power lead.
2. the accelerated test system for single-phase electric energy meter battery life according to claim 1, it is characterized in that: the temperature of described program control high/low temperature damp heat box arranges scope between-45 DEG C ~ 75 DEG C, humidity arranges scope between 0-100%RH, the humiture environment in simulation single-phase electric energy meter actual motion.
3. the accelerated test system for single-phase electric energy meter battery life according to claim 1, it is characterized in that: described load box comprises electric current 5A, 10A, 20A and power factor 1.0,0.5L, 0.8C combination in any gear, real load during simulation single-phase electric energy meter on-site runs.
CN201520582571.0U 2015-08-05 2015-08-05 A accelerated test system for single -phase electric energy meter battery life Expired - Fee Related CN204832468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520582571.0U CN204832468U (en) 2015-08-05 2015-08-05 A accelerated test system for single -phase electric energy meter battery life

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520582571.0U CN204832468U (en) 2015-08-05 2015-08-05 A accelerated test system for single -phase electric energy meter battery life

Publications (1)

Publication Number Publication Date
CN204832468U true CN204832468U (en) 2015-12-02

Family

ID=54690053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520582571.0U Expired - Fee Related CN204832468U (en) 2015-08-05 2015-08-05 A accelerated test system for single -phase electric energy meter battery life

Country Status (1)

Country Link
CN (1) CN204832468U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105044614A (en) * 2015-08-05 2015-11-11 国家电网公司 Single-phase electric energy meter battery life acceleration test system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105044614A (en) * 2015-08-05 2015-11-11 国家电网公司 Single-phase electric energy meter battery life acceleration test system and method

Similar Documents

Publication Publication Date Title
CN105044614A (en) Single-phase electric energy meter battery life acceleration test system and method
CN207198262U (en) A kind of charging pile test system with feedback function
CN102645635A (en) Device and method for testing corresponding relation between open circuit voltage (OCV) and system on chip (SOC)
CN105929278B (en) A kind of unsteady flow module high voltage test macro and method
CN108333446A (en) Super capacitor detection method based on variable propeller pitch control
CN204855786U (en) From measurement formula ammeter accuracy testing check table
CN109270472A (en) A kind of method and device of lithium battery on-line monitoring
CN109490790A (en) Using the lithium dynamical battery power characteristic test method and device of compensated pulse method
CN106019167A (en) Intelligent electric energy meter clock battery performance testing method based on working condition simulation
CN109298245A (en) The detection method and device of super capacitor in pitch-controlled system
CN111505521A (en) Method for testing storage life of lithium secondary battery in accelerated manner
CN202854237U (en) Storage battery on-line internal resistance detection device having adaptive test technology
CN116203428A (en) Self-discharge detection method for calculating equivalent model parameters of lithium battery based on constant-voltage charging and discharging
CN203299318U (en) Short-circuit detection apparatus for battery core
CN204832468U (en) A accelerated test system for single -phase electric energy meter battery life
CN203849400U (en) Intelligent ammeter carrier wave communication module dynamic power consumption detector
CN103135057A (en) Quick measurement method with battery self-discharge performance
CN205643688U (en) Single -phase electric energy meter detection device
CN204882853U (en) Electric energy meter pressure resistance test installation
CN210347800U (en) Fill experimental detecting system of electric pile
CN204028346U (en) A kind of electric energy meter Auto-Test System
CN207440201U (en) A kind of condenser leakage current multichannel independent test system
CN203054133U (en) Intelligent test system of intelligent protection and measuring control device
CN101957401A (en) Power-distribution electric energy comprehensive measuring apparatus and measuring method thereof
CN207502984U (en) A kind of portable intelligent actuating of relay power measuring

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20190805

CF01 Termination of patent right due to non-payment of annual fee