CN204823466U - Metallurgy crane equipment wire rope changes serving device - Google Patents

Metallurgy crane equipment wire rope changes serving device Download PDF

Info

Publication number
CN204823466U
CN204823466U CN201520456838.1U CN201520456838U CN204823466U CN 204823466 U CN204823466 U CN 204823466U CN 201520456838 U CN201520456838 U CN 201520456838U CN 204823466 U CN204823466 U CN 204823466U
Authority
CN
China
Prior art keywords
reel
rope
steel rope
crane
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520456838.1U
Other languages
Chinese (zh)
Inventor
戴新
徐金虎
白海军
方军荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Original Assignee
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd filed Critical Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority to CN201520456838.1U priority Critical patent/CN204823466U/en
Application granted granted Critical
Publication of CN204823466U publication Critical patent/CN204823466U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the technical field of the metallurgical machinery overhauls equipment, concretely relates to metallurgy crane equipment wire rope changes serving device, the device includes the reel 1 of horizontal cone column structure, this reel 1 is installed on center pin 4, install on the support tile seat 8 on support frame 7 at 4 both ends of center pin, the swing joint of 1 cone structure tip on reel department has ring flange 5, the welding is gone up to this ring flange 5 has hand wheel 2, ring flange 5 is connected with reel 1 through pressing plate bolt 3, its cone structure main aspects department welding has hand wheel 2. The utility model discloses simple structure, simple manufacture utilizes waste and old materials to make, has reduced intensity of labour, has improved labor efficiency, provides convenient for the user.

Description

A kind of crane for steelworks use equipment steel rope replacing cord winder
Technical field
The utility model belongs to metallurgical machinery repair apparatus technical field, is specifically related to a kind of crane for steelworks use equipment steel rope replacing cord winder.
Background technology
The general tonnage of metallurgical weight-lifting equipment is large, and load-carrying capacity is strong, be used for liquid metal handling, and operating frequency is high and be in high temperature, high soot region, shortens operating cycles and the life-span of steel rope, is unfavorable for normal Steel wire rope maintenance and maintenance, change number of times frequent.
Often overhaul efficiency is restricted by following problem in daily overhead traveling crane maintenance process.1. the replacing of overhead traveling crane hoist rope is due to the restriction in time, place and space, all need 14 people and fork truck crane to coordinate before each maintenance according to movable and fixed pulley group and height of the carbody, steel rope to be put well by size from finished product rope volume in advance new rope, with manpower by 4 newly rope be rolled into colligation good after deliver to Overhaul site, expend 10 little left and right; 2. new fag end is fixed, pressing plate is removed and install to need 16 people × 8 hour to carry out at overhead traveling crane upper and lower during steel rope replacing, need overhead traveling crane slowly to hoist in serving process after new and old rope welding successively 4 new fag ends to be involved in movable and fixed pulley group, new fag end is being fixed on car body.Until new rope wear around after fall old rope after rise time carry out recovery operation, while also to need to rely on manpower that old rope is coiled in ground colligation in order as personnel firm; 3. fall deadweight after rise because of steel rope self and have twisted phenomena, when overhead traveling crane fall velocity is too fast, personnel need firmly old rope peace to be fallen according to clockwise direction dish simultaneously, easily cause steel rope normal disk lopping to cause bounce-back to injure worker.
Problems not only increases labour power for a long time, cannot eliminate safe hidden trouble and have a strong impact on production, at present for problems, does not also have a kind of device that can facilitate new and old steel rope replacing.
Summary of the invention
The purpose of this utility model will provide one to be suitable for crane for steelworks use equipment steel rope replacing cord winder exactly.
The utility model is achieved through the following technical solutions:
A kind of crane for steelworks use equipment steel rope replacing cord winder, this device comprises the reel 1 of horizontal taper shape structure, this reel 1 is arranged on center shaft 4, center shaft 4 two ends are arranged on the support watt seat 8 on bracing frame 7, reel 1 cone structure small end place is connected with flange 5, this flange 5 is welded with handwheel 2, and flange 5 is connected with reel 1 by follower bolt 3, and the large end place of its cone structure is welded with handwheel 2.
In order to better realize the purpose of this utility model, bracing frame 7 lower end is provided with base 6.
In order to better realize the purpose of this utility model, on reel 1, the steel rope specification of coiling is diameter 11-36mm.
Compared with prior art, the beneficial effects of the utility model are:
1) this device is utilized original strength of turning round can be loosened and is fixed on reel by disposable for steel rope being coiled on reel.After need not being put well according to design length successively by new rope again, carry out secondary flake down and colligation utilizing personnel.Shorten and put rope time and personnel, in the past 14 people x8 hour, present 8 people x6 hour.
2) needed by steel rope replacing in the past ground staff to overturn back and forth to reclaim the time of old rope to improve, alleviate labour intensity.Needed in the past 16 people change rope ground 10 people be reduced to 7 people, this device is observed and is operated, can complete in 4 hours new and old rope wear around.
3) this device personnel are utilized only to need to control in cord winder both sides the rotating speed of cord winder, eliminate in the past cheese serving time need a large amount of personnel to fake stand up remove steel rope turn round strength phenomenon, prevent the steel rope bounce-back when overturning fake from hurting sb.'s feelings, guarantee is improve to the safety of operating personnel, eliminates the danger factor of existence.
4) utility model structure is simple, makes simple, utilizes waste and scrap to make.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1. reel, 2. handwheel, 3. follower bolt, 4. center shaft, 5. flange, 6. base, 7. bracing frame, 8. support watt seat.
Detailed description of the invention
Below the utility model is described further:
As shown in Figure 1, a kind of crane for steelworks use equipment steel rope replacing cord winder, this device comprises the reel 1 of horizontal taper shape structure, this reel 1 is arranged on center shaft 4, and center shaft 4 two ends are arranged on the support watt seat 8 on bracing frame 7, and bracing frame 7 lower end is provided with base 6, reel 1 cone structure small end place is connected with flange 5, this flange 5 is welded with handwheel 2, and flange 5 is connected with reel 1 by follower bolt 3, and the large end place of its cone structure is welded with handwheel 2.
When the utility model specifically uses, the new rope of volume is first by after steel wire rope head one ends wound is on reel 1, rotation both sides handwheel 2 newly will be restricted and be coiled successively on reel 1, when new and old steel rope replacing, the utility model is placed in the both sides of plate hook portal frame, first outermost for fixed pulley group two fast lines are cut off and weld together of newly restricting, operation people control both sides fix and movable handwheel 2 rotating speed carry out new and old rope change, after new rope is all wrapped in assembly pulley, cut off new and old rope socket, be new rope and change complete.
When reclaiming old rope, old rope fag end is fixed on swift 1, be coiled in by old rope on reel 1 firm with iron wire colligation successively, then remove follower bolt 3, flange 5 is separated with reel 1, remove the support watt seat 8 of center shaft 4 axle head, sling with overhead traveling crane by swift 1, old steel rope can be reclaimed from the whole dish landing of swift 1 to ground, swift 1 utilizes six decile steel pipe manufacturings, reduce friction force, alleviate the weight of whole device.

Claims (3)

1. a crane for steelworks use equipment steel rope replacing cord winder, this device comprises the reel (1) of horizontal taper shape structure, this reel (1) is arranged on center shaft (4), center shaft (4) two ends are arranged on the support watt seat (8) on bracing frame (7), it is characterized in that: described reel (1) cone structure small end place is connected with flange (5), this flange (5) is welded with handwheel (2), flange (5) is connected with reel (1) by follower bolt (3), and the large end place of its cone structure is welded with handwheel (2).
2. a kind of crane for steelworks use equipment steel rope replacing cord winder as claimed in claim 1, is characterized in that: described bracing frame (7) lower end is provided with base (6).
3. a kind of crane for steelworks use equipment steel rope replacing cord winder as claimed in claim 1, is characterized in that: the steel rope specification of the upper coiling of described reel (1) is diameter 11-36mm.
CN201520456838.1U 2015-06-30 2015-06-30 Metallurgy crane equipment wire rope changes serving device Expired - Fee Related CN204823466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520456838.1U CN204823466U (en) 2015-06-30 2015-06-30 Metallurgy crane equipment wire rope changes serving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520456838.1U CN204823466U (en) 2015-06-30 2015-06-30 Metallurgy crane equipment wire rope changes serving device

Publications (1)

Publication Number Publication Date
CN204823466U true CN204823466U (en) 2015-12-02

Family

ID=54681089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520456838.1U Expired - Fee Related CN204823466U (en) 2015-06-30 2015-06-30 Metallurgy crane equipment wire rope changes serving device

Country Status (1)

Country Link
CN (1) CN204823466U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110429510A (en) * 2019-08-23 2019-11-08 安徽博晟亿电力科技有限公司 A kind of stockbridge damper resetting-mechanism and its operating method
CN110577166A (en) * 2019-09-18 2019-12-17 太原重工股份有限公司 Reducing drum of metallurgical crane and manufacturing method thereof
CN111960184A (en) * 2020-08-18 2020-11-20 马鞍山钢铁股份有限公司 Replacement structure and replacement method for single steel wire rope of metallurgical crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110429510A (en) * 2019-08-23 2019-11-08 安徽博晟亿电力科技有限公司 A kind of stockbridge damper resetting-mechanism and its operating method
CN110577166A (en) * 2019-09-18 2019-12-17 太原重工股份有限公司 Reducing drum of metallurgical crane and manufacturing method thereof
CN111960184A (en) * 2020-08-18 2020-11-20 马鞍山钢铁股份有限公司 Replacement structure and replacement method for single steel wire rope of metallurgical crane

Similar Documents

Publication Publication Date Title
CN204823466U (en) Metallurgy crane equipment wire rope changes serving device
CN203284095U (en) Tower crane for cooling tower
CN104444762B (en) Wind power foundation ring overturning device and method for overturning foundation ring by using same
CN105905806B (en) Metallurgical crown block steel rope replacing device and production method and application method
CN106044574B (en) The synchronous method for changing ladle carne gantry beam and steel wire rope
CN201999622U (en) Hoisting device for working roller or intermediate roller
CN203329226U (en) Movable safety belt fixing device
CN205802798U (en) Metallurgical crown block steel rope replacing device
CN207632372U (en) A kind of vehicle-mounted cantilever crane of intelligent light-duty
CN201956831U (en) Lifting device for motor rotor
CN201433037Y (en) Lifting hook for section of wind-power tower
CN201228193Y (en) Disjointed universal shaft guide conveying enclasping machine
CN213059944U (en) High-efficient removal type lifting device
CN205590168U (en) Overturning lifting device
CN107763304A (en) A kind of replacing options of the vertical FlexbleJoint in high-altitude
CN203284100U (en) Tower crane achieving automatic replacement of steel wire rope
CN207645635U (en) A kind of multi-functional chemical engineering equipment hoisting frame
CN203922502U (en) A kind of macrobending radius roller hoist cable fender guard
CN203439948U (en) Gantry lifting frame for cableway
CN207108239U (en) A kind of Novel steel profile hoisting device
CN206814306U (en) The detachable simple loop wheel machine of transformer station
CN201690190U (en) Cable winding and rewinding device of electromagnetic lifter crane
CN206232337U (en) A kind of lifting appliance of electric equipment maintenance
CN203652916U (en) Special blanking tool used to unwind steel wire ropes
CN104085796B (en) Macrobending radius roller hoist cable protective device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20160630