CN204781326U - Novel prestressing force industry stock ground cover shed structure - Google Patents

Novel prestressing force industry stock ground cover shed structure Download PDF

Info

Publication number
CN204781326U
CN204781326U CN201520341123.1U CN201520341123U CN204781326U CN 204781326 U CN204781326 U CN 204781326U CN 201520341123 U CN201520341123 U CN 201520341123U CN 204781326 U CN204781326 U CN 204781326U
Authority
CN
China
Prior art keywords
truss
suspension cable
steel truss
prestressed steel
strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520341123.1U
Other languages
Chinese (zh)
Inventor
葛家琪
王明珠
王树
刘鑫刚
张国军
张奇铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aviation Planning and Design Institute Group Co Ltd
Original Assignee
China Aviation Planning and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aviation Planning and Design Institute Group Co Ltd filed Critical China Aviation Planning and Design Institute Group Co Ltd
Priority to CN201520341123.1U priority Critical patent/CN204781326U/en
Application granted granted Critical
Publication of CN204781326U publication Critical patent/CN204781326U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a novel prestressing force industry stock ground cover shed structure, include and constitute by horizontal parallel arrangement's a multispan prestressing force steel truss and longitudinal arrangement's a multichannel space string roof beam, the prestressing force steel truss is opened string roof beam interconnect with the space and is constituteed holistic integral type structure. Still disclose the prestressing force steel truss and opened string roof beam integrated configuration construction method with the space, included structural design, confirmed construction method, assembled, set up a tire supporting frame, installation temporarily to truss grouping, steel truss ground and vertically stabilize steps such as truss, a space string roof beam construction. Combine a space string roof beam and prestressing force steel truss, full play is the advantage of structure separately, can make building structure at molding, usage space, cost, construction, installation and the optimum that reaches in transit.

Description

A kind of novel pre-stressed industrial stock ground canopy structure
Technical field
The utility model relates to civil engineering work construction applications, particularly relates to a kind of novel pre-stressed industrial stock ground canopy structure.
Background technology
That steel truss structure is handsome in appearance is generous, brevity and lucidity, structure stress are clear, are applicable to large span and super-span, are widely used in the large-scale public building such as railway terminal, airport and the industrial construction such as large-span industrial building, warehouse.
Traditional trussed construction is due to the impact of deadweight, vertical load and distortion, and its span is limited and economy is poor.Prestressing force concept is introduced on common truss basis, form truss-string-structure, due to prestressed effect, truss produces the prestressing effect of antiarch upwards, can the opposing effectively deadweight contrary with antiarch direction, the vertical forward such as dead load, mobile load load, can depth of truss be reduced, improve structural span, reduce steel using amount.But the prestressing effect of the truss string structure of routine only can resist the effect of forward load, is disadvantageous for reversed loads identical with antiarch direction such as wind suctions, the long span building that wind inhales load control therefore can not be used for.
Adopt truss string structure or common truss as the building of agent structure, the general purlin that adopts is as the supporting member of roofing, and purlin is arranged on winding up of truss.Truss has stronger stable type in own layer, but in out-of-plane less stable.Purlin is beam type flexural member, and general employing square steel or H profile steel, be connected to winding up of truss by purlin holder, very limited to the out-of-plane supporting role of truss, the resistance to overturning of this truss+purlin is poor.Because purlin is flexural member, the span of its less expensive is 5m ~ 8m, and therefore truss clear spacing is also 5 ~ 8m, causes truss very close, and steel amount is very large, less economical, impacts the attractive in appearance of structure simultaneously.
For arch truss, under vertical uniform load q, there is huge horizontal thrust in its truss support place, cause substructure and bearing cost high.
Structure and the force way of tension string beam structure and truss string structure are similar, be winded up by stiffening member, flexible cable lower edge, centre connect the structural system formed with strut, strut generation component is upwards made by stretch-draw lower edge high strength drag-line, chord member is caused to produce the internal forces distribution contrary with outside vertical uniform load q, thus reduce the internal force of structure, reduce the distortion of structure.The prestressing effect of conventional beam string only can resist the effect of forward load, is disadvantageous for reversed loads identical with antiarch direction such as wind suctions.Because beam string winds up as single rod member, its out of plane stiffness is very weak, and stability is very poor.
Utility model content
The utility model proposes a kind of combined structure system prestressed steel truss and Spatial beam string structure being carried out combine, what the traditional form that effective solution truss string structure adds purlin caused be not highly resistant to, and wind inhales load, resistance to overturning is poor, truss space is close, steel using amount is large, arch truss bearing thrust large etc. shortcoming.
Concrete solution is: the utility model discloses a kind of novel pre-stressed industrial stock ground canopy structure, comprise and being made up of the many Pin prestressed steel truss be laterally arranged in parallel and longitudinal multiple tracks Spatial beam string structure arranged, described prestressed steel truss and Spatial beam string structure are interconnected and form overall integral structure.
Further, prestressed steel truss comprise winded up by truss, steel truss agent structure that truss lower edge, truss web are formed, truss winds up, truss lower edge and truss web are mutually permanently connected, also comprise last quarter rope, strut, hound, suspension cable, strut and truss lower edge are articulated and connected, and last quarter rope is connected by rope bar connected node with strut, and the end of last quarter rope is connected with truss lower edge, by stretch-draw last quarter rope to structure Shi Hanzhang, make truss generation antiarch upwards; One end of suspension cable is connected with truss lower edge, and the other end is connected on the truss rope bar tie point of last quarter rope, strut, hound, by giving suspension cable Shi Hanzhang, makes structure produce downward effect.
Further, steel truss agent structure is quadrangle truss or triangular truss; Steel truss agent structure adopts related subgroup truss or solder sphere truss.
Further, in the peak of the arc formed of prestressed steel truss, lower oblique cord and stress steel truss junction and arrange longitudinal stability truss close to the position at two ends.
Further, Spatial beam string structure is made up of the beam that winds up, the web member that winds up, triangle strut, upper suspension cable, jump stay, lower suspension cable; Two wind up beam and the web member formation plane frames that wind up; Upper suspension cable, jump stay and triangle strut produce prestressing effect upwards to the beam that winds up, and form the tension string beam structure with carrying forward load; Upper suspension cable is connected by the beam rope bar tie point that winds up with triangle strut, lower suspension cable one end is connected on the truss lower edge of truss, the other end is connected with triangle strut, upper suspension cable, jump stay by beam string rope bar tie point, by oblique pull under stretch-draw, formed and there is the tension string beam structure carrying reverse wind load.
The upper suspension cable of Spatial beam string structure and the beam that winds up, to be winded up with the truss of prestressed steel truss by connected node and be connected, the lower suspension cable of Spatial beam string structure is connected with the truss lower edge of prestressed steel truss.
Beneficial effect:
Different from the Earthquake response of traditional truss+purlin, a kind of combined structure system prestressed steel truss and Spatial beam string structure being carried out combine, prestressed steel truss and space are opened string two combine, form a kind of interactional new structural systen, improve stability and the supporting capacity of structure.The last quarter rope of prestressed steel truss structure, strut and truss acting in conjunction form truss string structure, and can resist vertical uniform load q, suspension cable can resist reverse wind load, can reduce the horizontal force of bearing simultaneously.
Spatial Beam String Structure is arranged between two Pin steel trusss, and its power transmission effect is identical with main purlin.Because Spatial Beam String Structure all has effective supporting capacity to plane internal loading peace the curved beam, simultaneously due to the existence of lower suspension cable, be highly resistant to reverse wind and inhale load.Adopt Spatial beam string structure to replace common purlin, change tradition into prestressing force beam string structure, significantly can increase span compared with common purlin, make the span of purlin increase to 20 ~ 40m by 5 ~ 8m by curved purlin, that reduces purlin uses material usage.Due to purlin across increase, the distance between adjacent two Pin steel trusss is increased, and then reduces the quantity of steel truss, reduce the material usage of steel truss.Spatially the upper suspension cable of beam string structure and the end of beam are connected to winding up of truss, and lower suspension cable is connected with the lower-chord panel point of trussed construction, and each node that truss is winded up has a side direction fulcrum, can improve the resistance to overturning of truss.Spatial beam string structure and prestressed steel truss are combined, gives full play to the advantage of each self-structure, building structure can be made in moulding, usage space, cost, difficulty of construction, manufacture and transport to reach optimum.
For the closed transformation in the stock ground of the outdoor coal yard in the coal-burning power plant runed, iron and steel works, adopt the utility model can adopt the construction method of packet slip, do not affect stock ground equipment in construction process and run, equipment is without the need to transformation, factory, without the need to stopping work, can reduce cost, reduces the wasting of resources.
Accompanying drawing explanation
Fig. 1 is the overall schematic of embodiment 1 prestressed steel truss and Spatial beam string structure combining structure;
Fig. 2 is that embodiment 1 prestressed steel truss is connected with Spatial beam string structure and arranges overall schematic;
Fig. 3 is embodiment 1 prestressed steel truss elevation;
Fig. 4 is that embodiment 1 prestressed steel truss axle measures intention;
Fig. 5 is embodiment 1 Spatial Beam String Structure schematic diagram;
Fig. 6 is that embodiment 1 prestressed steel truss is connected enlarged drawing with Spatial beam string structure;
Fig. 7 is the lifting segmentation of embodiment 1 prestressed steel truss and temporary support moulding bed schematic diagram;
Fig. 8 is the minor structure schematic diagram as burst construction in embodiment 1 work progress;
Fig. 9 is the overall schematic of embodiment 2 prestressed steel truss and Spatial beam string structure combining structure;
Figure 10 is embodiment 2 prestressed steel truss elevation;
Figure 11 is embodiment 2 prestressed steel truss lifting stepwise schematic views;
In figure, 1-prestressed steel truss; 11-truss winds up; 12-truss lower edge; 13-strut; 14-last quarter rope; 15-suspension cable; 16-hound; 17-truss web; 18-rope support connected node; 19-truss rope bar tie point; 2-Spatial beam string structure; 21-winds up beam; The upper suspension cable of 22-; Suspension cable under 23-; 24-tie point; 25-triangle strut; 26-jump stay; 27-winds up web member; 28-beam string rope bar tie point; 3-longitudinal stability truss; 4-temporary support moulding bed; 41-prestressed steel truss lifting stage casing; 42-prestressed steel truss lifting limit section; 43-truss sections position; The prestressed steel truss lifting stage casing of 51-embodiment 2; The prestressed steel truss lifting limit section of 52-embodiment 2.
Detailed description of the invention
In conjunction with super-span building, the utility model is described the technical scheme in the utility model.
Embodiment 1
As shown in Figures 1 to 8, embodiment 1 adopts Spatial beam string structure and arc prestressed steel truss to carry out the combined structure system combined for super-span building, by prestressed steel truss 1, the Spatial beam string structure 2 of arc, stablizes truss 3 and forms; The truss quadrangle of prestressed steel truss 1 is spacing 36m, and totally 12 Pin, are arranged in parallel, span 180m, height 8m, width 6m; Three road longitudinal stability truss 3 are set at the top of truss and both sides, do not establish the location arrangements Spatial beam string structure of stable truss.
Prestressed steel truss 1 winds up 11 by truss, truss lower edge 12, truss web 17, strut 13, last quarter rope 14, suspension cable 15, hound 16 are formed.The space related subgroup trussed construction that wherein truss winds up 11, truss lower edge 12, truss web 17 form quadrangle; Strut 13 upper end and truss lower edge 12 are articulated and connected, and two rod member lower ends of strut 13 are handed over as any is connected with last quarter rope 14 by rope support connected node 18; Apply stretching force to last quarter rope 14, stretching force produces pre-arching action upwards to truss, effectively can resist vertical uniform load q; Hound 16 upper end is connected to truss lower edge 12 and strut 13 junction, and lower end is connected by truss rope bar tie point 19 with last quarter rope 14, strut 13 lower end, suspension cable 15 upper end; Suspension cable 15 lower end is connected to truss lower edge, and stretching oblique drag-line 15 can resist reverse wind action.
Prestressed steel truss 1 is arranged in parallel, and establishes stable truss 3 between two Pin prestressed steel truss 1, and due to the existence of Spatial beam string structure 2, stablizing truss arrangement beam can greatly reduce.
The wind up upper suspension cable 22 of beam 2 structure of space is connected to the end of the beam 21 that winds up, and falls to install to 11 relevant positions of winding up of prestressed steel truss 1 after ground spliced stretch-draw completes; Wind up 11 to be connected by will wind up beam 21 and truss of connected node 24; The lower suspension cable 23 of Spatial beam string structure 2 is connected with the lower-chord panel point 20 of prestressed steel truss 1, suspension cable 23 under stretch-draw;
The beam 21 that winds up of Spatial beam string structure 2 replaces the main purlin between ordinary steel truss, forms the interactional combined structure system of Earthquake response.
Embodiment 2
As shown in Fig. 9 to Figure 10, embodiment 2 adopts Spatial beam string structure and square prestressed steel truss to carry out the combined structure system combined for super-span building, by square prestressed steel truss 1, Spatial beam string structure 2, stablizes truss 3 and forms; The truss quadrangle of prestressed steel truss 1 is spacing 36m, and totally 12 Pin, are arranged in parallel, span 180m, height 8m, width 6m; Three road longitudinal stability truss 3 are set at the top of truss and both sides, do not establish the location arrangements Spatial beam string structure of stable truss.
Prestressed steel truss of the present utility model and Spatial beam string structure combining structure construction method, comprise the steps:
First, structure design is completed.
Secondly, determine constructure scheme, carry out construction overall process simulation analysis according to constructure scheme, determine the prestressing force pull-up values in each step stretching process.
Then, to truss grouping, be no less than Spatial beam string structure 2 between two Pin prestressed steel truss 1 and truss as one group using adjacent, form minor structure.The installation simultaneously of prestressed steel truss 1 in same group of minor structure.
4th step, carries out installation on ground to single Pin prestressed steel truss 1 point three sections, and fragment bit puts the outside being arranged on last quarter rope 14 and truss lower edge 12 connected node.To truss stage casing 51 at ground configuration last quarter rope 14, strut 13, brace 16; And preliminary stretch-draw is carried out to last quarter rope 14.
5th step, the both sides section 52 of first prestressed steel truss 1, truss hoisting stage casing 51, splices with limit section 452, forms complete single Pin prestressed steel truss 1, and truss support and sliding construction equipment connection is firm, preliminary stretch-draw oblique cord 15.
6th step, two Pin prestressed steel truss 1 of same minor structure install the longitudinal stability truss 3 between two Pin prestressed steel truss 1 after having constructed.Spatial beam string structure 2 is completed at installation on ground, suspension cable 22 and jump stay 26 in preliminary stretch-draw; Lifting Spatial beam string structure 2, is connected Spatial beam string structure 2 with winding up of truss 1 by connected node 24; Lower suspension cable 23 is connected to lower chord 12 correspondence position of prestressed steel truss 1; Suspension cable 23 under stretch-draw, makes Spatial beam string structure 2 reach specific prestressing force.
7th step, treats that the Spatial beam string structure 2 in a group between two Pin prestressed steel truss 1 is constructed complete; To last quarter rope 14 with skew rope 15 and carry out two times tensioning.
8th step, adopts gliding construction method slippage to ad-hoc location one group of minor structure of having assembled, truss support node and basis is connected and fixed, to last quarter rope 14 with skew rope 15 and carry out final stretch-draw, make steel cable stretching force reach design load.
Finally, the Spatial beam string structure 2 between each group of minor structure is installed, completes main structural engineering construction.

Claims (7)

1. a novel pre-stressed industrial stock ground canopy structure, it is characterized in that, comprise and being made up of the many Pin prestressed steel truss (1) be laterally arranged in parallel and longitudinal multiple tracks Spatial beam string structure (2) arranged, described prestressed steel truss (1) and Spatial beam string structure (2) are interconnected and form overall integral structure.
2. novel pre-stressed industrial stock ground according to claim 1 canopy structure, it is characterized in that, prestressed steel truss (1) comprise winded up (11) by truss, steel truss agent structure that truss lower edge (12), truss web (17) are formed, truss winds up (11), truss lower edge (12) and truss web (17) are mutually permanently connected
Also comprise last quarter rope (14), strut (13), hound (16), suspension cable (15), strut (13) and truss lower edge (12) are articulated and connected, and last quarter rope (14) is connected by rope bar connected node (19) with strut (13);
The end of last quarter rope (14) is connected with truss lower edge (12), by stretch-draw last quarter rope to structure Shi Hanzhang, makes truss generation antiarch upwards; One end of suspension cable (15) is connected with truss lower edge (12), the other end is connected on truss rope bar tie point (19) of last quarter rope (14), strut (13), hound (16), by giving suspension cable (15) Shi Hanzhang, structure is made to produce downward effect.
3. novel pre-stressed industrial stock ground according to claim 2 canopy structure, it is characterized in that, steel truss agent structure is quadrangle truss or triangular truss; Steel truss agent structure adopts related subgroup truss or solder sphere truss.
4. novel pre-stressed industrial stock ground according to claim 1 canopy structure, it is characterized in that, at the peak of the arc formed of prestressed steel truss (1), lower oblique cord (14) is with prestressed steel truss (1) junction and arrange longitudinal stability truss (3) close to the position at two ends.
5. novel pre-stressed industrial stock ground according to claim 1 canopy structure, it is characterized in that, Spatial beam string structure (2) is made up of the beam that winds up (21), the web member that winds up (27), triangle strut (25), upper suspension cable (22), jump stay (26), lower suspension cable (23); Two beams that wind up (21) and the web member that winds up (27) form plane frame;
Upper suspension cable (22), jump stay (26) and triangle strut (25) produce prestressing effect upwards to the beam that winds up (21), form the tension string beam structure with carrying forward load.
6. novel pre-stressed industrial stock ground according to claim 5 canopy structure, it is characterized in that, upper suspension cable (22) is connected by beam rope bar tie point (28) that winds up with triangle strut (25), lower suspension cable (23) one end is connected on the truss lower edge (12) of truss (1), the other end is connected with triangle strut (25), upper suspension cable (22), jump stay (26) by beam string rope bar tie point (28), by suspension cable under stretch-draw (23), formed and there is the tension string beam structure carrying reverse wind load.
7. novel pre-stressed industrial stock ground according to claim 1 canopy structure, it is characterized in that, the upper suspension cable (22) of Spatial beam string structure (2) and the beam that winds up (21), by connected node (24) and the truss of prestressed steel truss (1) wind up (12) be connected, the lower suspension cable (23) of Spatial beam string structure (2) is connected with the truss lower edge (12) of prestressed steel truss (1).
CN201520341123.1U 2015-05-25 2015-05-25 Novel prestressing force industry stock ground cover shed structure Active CN204781326U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520341123.1U CN204781326U (en) 2015-05-25 2015-05-25 Novel prestressing force industry stock ground cover shed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520341123.1U CN204781326U (en) 2015-05-25 2015-05-25 Novel prestressing force industry stock ground cover shed structure

Publications (1)

Publication Number Publication Date
CN204781326U true CN204781326U (en) 2015-11-18

Family

ID=54521405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520341123.1U Active CN204781326U (en) 2015-05-25 2015-05-25 Novel prestressing force industry stock ground cover shed structure

Country Status (1)

Country Link
CN (1) CN204781326U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847017A (en) * 2015-05-25 2015-08-19 中国航空规划建设发展有限公司 Novel prestress industrial stockyard canopy structure and method for constructing same
CN105401657A (en) * 2015-11-20 2016-03-16 中冶赛迪工程技术股份有限公司 Inverted-V-shaped truss with span larger than 100 m and construction method of inverted-V-shaped truss
CN106193306A (en) * 2016-08-17 2016-12-07 中国航空规划设计研究总院有限公司 A kind of long-span hangar fringe truss prestressed structural systems and construction method thereof
CN107254917A (en) * 2017-07-11 2017-10-17 浙江东南网架股份有限公司 A kind of many order prestressed steel truss structures of super-span and its construction method
CN107919837A (en) * 2018-01-04 2018-04-17 苏州高创特新能源发展股份有限公司 A kind of Bidirectional String Structure beam agriculture light complimentary bracket system
CN111042540A (en) * 2019-12-18 2020-04-21 徐州中煤百甲重钢科技股份有限公司 Construction method for aerial butt joint of ground suspension cables of super-large-span prestressed pipe truss

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847017A (en) * 2015-05-25 2015-08-19 中国航空规划建设发展有限公司 Novel prestress industrial stockyard canopy structure and method for constructing same
CN104847017B (en) * 2015-05-25 2017-03-08 中国航空规划设计研究总院有限公司 A kind of prestressing force industry stock ground canopy structure and construction method
CN105401657A (en) * 2015-11-20 2016-03-16 中冶赛迪工程技术股份有限公司 Inverted-V-shaped truss with span larger than 100 m and construction method of inverted-V-shaped truss
CN106193306A (en) * 2016-08-17 2016-12-07 中国航空规划设计研究总院有限公司 A kind of long-span hangar fringe truss prestressed structural systems and construction method thereof
CN106193306B (en) * 2016-08-17 2018-09-18 中国航空规划设计研究总院有限公司 A kind of long-span hangar fringe truss prestressed structural systems and its construction method
CN107254917A (en) * 2017-07-11 2017-10-17 浙江东南网架股份有限公司 A kind of many order prestressed steel truss structures of super-span and its construction method
CN107254917B (en) * 2017-07-11 2022-08-09 浙江东南网架股份有限公司 Super-large-span multi-order secondary prestressed steel truss structure and construction method thereof
CN107919837A (en) * 2018-01-04 2018-04-17 苏州高创特新能源发展股份有限公司 A kind of Bidirectional String Structure beam agriculture light complimentary bracket system
CN111042540A (en) * 2019-12-18 2020-04-21 徐州中煤百甲重钢科技股份有限公司 Construction method for aerial butt joint of ground suspension cables of super-large-span prestressed pipe truss

Similar Documents

Publication Publication Date Title
CN104847017B (en) A kind of prestressing force industry stock ground canopy structure and construction method
CN204781326U (en) Novel prestressing force industry stock ground cover shed structure
CN103088750B (en) Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN204530991U (en) A kind of large-span prestressed arch truss and rope film combining structure
CN105625578B (en) It is adapted to the huge prestressing force beam string structure and construction method of the closing of super-span coal yard
CN204551891U (en) A kind of Spatial beam string structure and truss combining structure
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN109235650B (en) Large-span rigid gable space grid-three-section combined cable arch truss-membrane structure system
CN107386091B (en) The suspension bridge and construction method of saddle paraboloid spatial mixing cable system
CN201826251U (en) Quickly-assembled sectional type composite material truss bridge
CN109235651B (en) Large-span rigid gable space grid-cable membrane structure system
CN109487912A (en) A kind of construction method of super-span truss-string-structure
CN203080400U (en) Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables
CN203222919U (en) Circular-arc-shaped coal storage steel shed of net rack structure
CN202578055U (en) Height and width adjustable greenhouse for coke oven building construction
CN205475697U (en) It opens string structure to be fit for huge prestressing force of super large span coal yard confined
CN101481903B (en) Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling
CN202380390U (en) Flexible arch support frame with vault pushing steel truss girder
CN107419806B (en) Large-span X-shaped grid three-dimensional string structure system and construction method thereof
CN102330470A (en) Single-layer prestressing frame structure
CN203034345U (en) Coal transporting trestle of integral continuous steel truss
CN111877559A (en) Steel-wood mixed cross string arch shell structure
CN215800931U (en) Concrete-filled steel tube truss suitable for high-speed railway
CN105908838A (en) Roundabout stretching structure
CN202450450U (en) Reinforcement and reconstruction structure of suspension bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant