CN204780429U - It carries wire rope who takes measure roof beam to be exclusively used in flexible slipform of prilling tower - Google Patents
It carries wire rope who takes measure roof beam to be exclusively used in flexible slipform of prilling tower Download PDFInfo
- Publication number
- CN204780429U CN204780429U CN201520471749.4U CN201520471749U CN204780429U CN 204780429 U CN204780429 U CN 204780429U CN 201520471749 U CN201520471749 U CN 201520471749U CN 204780429 U CN204780429 U CN 204780429U
- Authority
- CN
- China
- Prior art keywords
- wire rope
- construction
- steel wire
- roof beam
- exclusively used
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a measure roof beam is carried and is taken the construction technology, specifically is an it carries wire rope who takes measure roof beam to be exclusively used in flexible slipform of prilling tower. The utility model provides a traditional measure roof beam carry and take that construction technology construction work load is big, construction cycle is long, construction cost is high, the poor problem of construction security. It carries wire rope who takes measure roof beam to be exclusively used in flexible slipform of prilling tower is including bifilar wire rope, wire rope dop, ligature iron wire, wherein, a Y shape branching has respectively been seted up at bifilar wire rope's both ends, two furcate outer terminal surfaces of every Y shape are all fixed as an organic whole, and two Y shape branchings enclose into two lantern rings separately, the figure of wire rope dop is two sets of, and the every wire rope of group dop all includes a plurality of wire rope dop, the both ends side that bifilar wire rope was located to the hoop is arranged to two sets of wire rope dops equidistance separately. The utility model is suitable for a superstructure construction of prilling tower is applicable to the superstructure construction of silo class buildings such as coal store, former coal bunker, cement bunker, grain depot equally.
Description
Technical field
The utility model relates to measure beam belt construction technology, specifically a kind of steel wire rope being exclusively used in granulation tower flexible sliding belt measure beam.
Background technology
In the Superstructure Construction process of granulation tower, the construction of measure beam belt is one important basic link.Traditional measure beam belt construction technology mainly comprises following three kinds: the first construction technology is after slding form operation, utilize pre-buried bracket to fall platform by measure beam belt to position to be installed.The second construction technology is in advance by measure beam belt to the door frame of sliding formwork, removes the Partial flats of sliding formwork, and utilize jack that measure beam is down to position to be installed after slding form operation.The third construction technology is installation measure platform again after slding form operation, and utilizes measure platform and tower crane by measure beam belt to position to be installed.Practice shows, traditional measure beam belt construction technology limit due to self principle, there are the following problems: one, in work progress, traditional measure beam belt construction technology needs a large amount of built-in fitting of installation and removal on the barrel of granulation tower, causes that construction workload is large, long construction period, construction cost are high thus.Its two, in work progress, traditional measure beam belt construction technology needs workmen to carry out a large amount of work high above the ground, causes the personal safety of workmen to be easily on the hazard thus, thus causes working security poor.Based on this, be necessary to invent a kind of brand-new measure beam belt construction technology, to solve the problems referred to above that traditional measure beam belt construction technology exists.
Summary of the invention
The utility model, in order to solve the problem that traditional measure beam belt construction technology construction workload is large, long construction period, construction cost are high, working security is poor, provides a kind of steel wire rope being exclusively used in granulation tower flexible sliding belt measure beam.
The utility model adopts following technical scheme to realize: the steel wire rope being exclusively used in granulation tower flexible sliding belt measure beam, comprises twin cable, steel wire clamp, tie wire; Wherein, the two ends of twin cable respectively offer a Y shape bifurcated; Two outer faces of each Y shape bifurcated are all fixed as one, and two Y shape bifurcateds surround two collars separately; The number of steel wire clamp is two groups, and often group steel wire clamp includes several steel wire clamps; Two groups of steel wire clamps separately equidistant arrangement hoop are located at the side, two ends of twin cable, and two groups of steel wire clamps are all between two Y shape bifurcateds; The number of tie wire is two; Two tie wires twine the side, two ends being tied to twin cable separately, and two tie wires are all between two groups of steel wire clamps.
Concrete use procedure is as follows: as shown in Figure 3, first, and prefabricated two Pin measure beams, and two Pin measure beams are put on the ground in granulation tower; Then, in granulation tower, assemble two flexible sliding devices, and the sliding variable cross-section place to granulation tower of the platform controlling two flexible sliding devices; Then, choose two steel wire ropes being exclusively used in granulation tower flexible sliding belt measure beam described in the utility model, and by two steel wire ropes being exclusively used in granulation tower flexible sliding belt measure beam described in the utility model separately around on the diagonal brace of two flexible sliding devices; Then, the head end of two Pin measure beams is hung on respectively in the collar that first two Y shape bifurcated being exclusively used in the steel wire rope of granulation tower flexible sliding belt measure beam described in the utility model surround, and ensure the head end of the head end of a Pin measure beam higher than the 2nd Pin measure beam, the tail end of two Pin measure beams is hung on respectively in the collar that second two Y shape bifurcated being exclusively used in the steel wire rope of granulation tower flexible sliding belt measure beam described in the utility model surround, and ensure the tail end of the tail end of a Pin measure beam lower than the 2nd Pin measure beam; Then, the platform controlling two flexible sliding devices continues sliding, and the platform of two flexible sliding devices drives two Pin measure beams sliding to position to be installed by the diagonal brace of two flexible sliding devices thus; Then, workmen stands on the suspension bracket of two flexible sliding devices, and pulls adjustment by two steel wire ropes being exclusively used in granulation tower flexible sliding belt measure beam described in the utility model to two Pin measure beams, makes two Pin measure beams accurately in place; Finally, two Pin measure beams and built-in fitting are welded and fixed, complete the belt of measure beam thus.
Compared with traditional measure beam belt construction technology, the steel wire rope being exclusively used in granulation tower flexible sliding belt measure beam described in the utility model achieves on the low diagonal brace hanging on two flexible sliding devices alternately of two Pin measure deck-moldings, utilize two flexible sliding devices can by two Pin measure safety beams on this basis, stably synchronous belt is to position to be installed, possesses following advantage thus: one, adopt described in the utility model be exclusively used in the steel wire rope of granulation tower flexible sliding belt measure beam after, without the need to a large amount of built-in fitting of installation and removal on the barrel of granulation tower in work progress, effectively reduce construction workload thus, effectively shorten construction period, effectively reduce construction cost.They are two years old; adopt described in the utility model be exclusively used in the steel wire rope of granulation tower flexible sliding belt measure beam after; in work progress, carry out a large amount of work high above the ground without the need to workmen, the available protecting personal safety of workmen thus, thus effectively enhance working security.
The utility model is rational in infrastructure, it is ingenious to design, efficiently solve the problem that traditional measure beam belt construction technology construction workload is large, long construction period, construction cost are high, working security is poor, be applicable to the Superstructure Construction of granulation tower, be equally applicable to the Superstructure Construction of the silo class buildings such as coal store, run coal bin, cement bunker, grain depot.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is using state reference diagram of the present utility model.
In figure: 1-twin cable, 2-steel wire clamp, 3-tie wire, 4-measure beam, 5-flexible sliding device, 6-is exclusively used in the steel wire rope of granulation tower flexible sliding belt measure beam.
Detailed description of the invention
Be exclusively used in the steel wire rope of granulation tower flexible sliding belt measure beam, comprise twin cable 1, steel wire clamp 2, tie wire 3; Wherein, the two ends of twin cable 1 respectively offer a Y shape bifurcated; Two outer faces of each Y shape bifurcated are all fixed as one, and two Y shape bifurcateds surround two collars separately; The number of steel wire clamp 2 is two groups, and often group steel wire clamp 2 includes several steel wire clamps 2; The side, two ends of twin cable 1 is located at by two groups of respective equidistant arrangement hoops of steel wire clamp 2, and two groups of steel wire clamps 2 are all between two Y shape bifurcateds; The number of tie wire 3 is two; Two tie wires 3 twine the side, two ends being tied to twin cable 1 separately, and two tie wires 3 are all between two groups of steel wire clamps 2.
During concrete enforcement, described measure beam 4 is Steel Truss Beam; The weight of every Pin measure beam 4 is 2 tons.
Claims (1)
1. be exclusively used in a steel wire rope for granulation tower flexible sliding belt measure beam, it is characterized in that: comprise twin cable (1), steel wire clamp (2), tie wire (3); Wherein, the two ends of twin cable (1) respectively offer a Y shape bifurcated; Two outer faces of each Y shape bifurcated are all fixed as one, and two Y shape bifurcateds surround two collars separately; The number of steel wire clamp (2) is two groups, and often organizes steel wire clamp (2) and include several steel wire clamps (2); The side, two ends of twin cable (1) is located at by two groups of respective equidistant arrangement hoops of steel wire clamp (2), and two groups of steel wire clamps (2) are all between two Y shape bifurcateds; The number of tie wire (3) is two; Two tie wires (3) twine the side, two ends being tied to twin cable (1) separately, and two tie wires (3) are all positioned between two groups of steel wire clamps (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520471749.4U CN204780429U (en) | 2015-07-03 | 2015-07-03 | It carries wire rope who takes measure roof beam to be exclusively used in flexible slipform of prilling tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520471749.4U CN204780429U (en) | 2015-07-03 | 2015-07-03 | It carries wire rope who takes measure roof beam to be exclusively used in flexible slipform of prilling tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204780429U true CN204780429U (en) | 2015-11-18 |
Family
ID=54520516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520471749.4U Expired - Fee Related CN204780429U (en) | 2015-07-03 | 2015-07-03 | It carries wire rope who takes measure roof beam to be exclusively used in flexible slipform of prilling tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204780429U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113803409A (en) * | 2021-09-18 | 2021-12-17 | 科顿环境科学股份有限公司 | Non-adjustable steel wire rope pre-tightening and mounting method for planar truss |
-
2015
- 2015-07-03 CN CN201520471749.4U patent/CN204780429U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113803409A (en) * | 2021-09-18 | 2021-12-17 | 科顿环境科学股份有限公司 | Non-adjustable steel wire rope pre-tightening and mounting method for planar truss |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203377546U (en) | High speed railway spanning construction apparatus | |
CN101597960B (en) | Large-tonnage jack tension construction technology for non-bonded prestressed silo | |
CN102828510B (en) | H type soldier pile and preparation method thereof | |
CN206706584U (en) | Pier arch rib in the asymmetric button lashed cable cable system installation Multi-arch bridge of middle pier | |
CN103291076A (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN103470093B (en) | Concrete chimney dismantling method | |
CN110093865A (en) | A kind of Bridge Erector | |
CN109339458A (en) | A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation | |
CN104499723A (en) | Movable safety net and installation method thereof | |
CN104631329A (en) | Method for adjusting overall line shape of continuous catwalk of suspension bridge | |
CN107165062A (en) | A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame | |
CN104909312A (en) | Electric operating vehicle | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN203947421U (en) | Compound beam cable stayed bridge direction across bridge prestress application device | |
CN105568856A (en) | Synchronous construction method for sparse-cable-stayed bridge cable beam | |
CN204780429U (en) | It carries wire rope who takes measure roof beam to be exclusively used in flexible slipform of prilling tower | |
KR100981982B1 (en) | Precast coping lifting system | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN204999517U (en) | Coal transporting trestle steel truss hoist device in power plant's chimney | |
CN209308433U (en) | A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation | |
CN105040592B (en) | Horizontal pull rope bridge and erection method thereof | |
CN105155840A (en) | Flexible slip-form lifting measure beam construction method for granulation tower | |
CN202039299U (en) | Totally-closed hanging basket | |
CN210458987U (en) | Soft temporary pocket hoisting device is changed to jib | |
CN106150171B (en) | Formwork support platform and its application inside a kind of reinforced concrete silo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151118 Termination date: 20200703 |
|
CF01 | Termination of patent right due to non-payment of annual fee |