CN204754212U - Unsettled fire control vestibule hangs mould formwork assembly - Google Patents
Unsettled fire control vestibule hangs mould formwork assembly Download PDFInfo
- Publication number
- CN204754212U CN204754212U CN201520395875.6U CN201520395875U CN204754212U CN 204754212 U CN204754212 U CN 204754212U CN 201520395875 U CN201520395875 U CN 201520395875U CN 204754212 U CN204754212 U CN 204754212U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- fire
- unsettled
- vestibule
- fire control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model relates to an unsettled fire control vestibule hangs mould formwork assembly, fire control vestibule predetermine that beam slab platform free end is inboard to be predetermine beam slab platform width direction along the fire control vestibule and be provided with a horizontal supporting beam, be provided with the triangle -shaped truss on the horizontal supporting beam, triangle -shaped truss both ends set up respectively on the horizontal supporting beam on the beam slab platform is predetermine to the fire control vestibule of two adjacent units, a triangle -shaped truss and a horizontal supporting beam fixed connection. The utility model discloses unsettled fire control vestibule hangs mould formwork assembly sets up through the welding of triangle -shaped truss, bears that the load is big, the construction span is big, stability is strong, can effectually prevent that degree of disturbing is out of shape too big production, practices thrift artifically, and the construction scope is wider. Unsettled fire control vestibule hangs mould formwork system and for the regularization equipment, props up and establish and demolish convenient and fast, can repeated turnover use, and the installation rate and the security that effectively improve the template can effectual reduction engineering cost for the construction progress of engineering.
Description
Technical field
The utility model relates to a kind of building operations mould structure, specifically, relates to a kind of unsettled fire-fighting vestibule and hangs mould and prop up mould assembly.
Background technology
Along with the development that domestic city is built, for meeting fire-fighting requirements, under the prerequisite of vacant interior architecture area, developing exterior space area and ensureing fire-fighting requirements.The design of outdoor fire fighting vestibule mostly adopts reinforced concrete beam and plate to connect 2 unit and solves passageway for fire apparatus problem, add appearance and modeling, have that body weight is large, span is large, ground clearance is high, side not near agent structure, such fire-fighting vestibule needs formwork to build to guarantee the use of fire-fighting vestibule, outward appearance and quality.In order to ensure the construction quality of structure, form bracing system requires that safety is high, brings difficulty and trouble to constructor, sometimes needs to set up and lands full hall scaffold, bring difficulty and trouble, and construction cost is higher to constructor.
Unsettled fire-fighting vestibule hangs mould and props up mould assembly system, and it has, and structure is simple, good integrity, construction space are large, time and labour saving, safe and reliable, effectively can overcome the advantages such as construction span is large.Traditionally at present hang mould technology, can only meet construction area narrow range, span is little, dead load is light construction, such mould technology of hanging scope of application is narrower.
Utility model content
For above-mentioned deficiency of the prior art, the utility model provide a kind of quick and easy for installation, structure is simple, safe and reliable, reduce the unsettled fire-fighting vestibule of construction cost and hang mould and prop up mould assembly.
Technical solution adopted in the utility model is:
A kind of unsettled fire-fighting vestibule hangs mould and props up mould assembly, comprises the fire-fighting vestibule preset beam plate platform of adjacent two unit, inside described fire-fighting vestibule preset beam plate platform free end, fire-fighting vestibule preset beam plate berm width direction is provided with cross binding beam; Described cross binding beam is provided with triangular truss, and described triangular truss two ends are separately positioned on the cross binding beam on the fire-fighting vestibule preset beam plate platform of adjacent two unit; Described triangular truss is fixedly connected with cross binding beam;
Described triangular truss comprises horizontal stand and side stand;
Described horizontal stand is provided with upper strata steel pipe; Lower floor's steel pipe is connected with upper strata steel pipe by longitudinal steel pipe;
Described upper strata steel pipe is connected with suspension rod upper end; Described suspension rod lower end is connected with lower floor steel pipe;
Described lower floor steel pipe is provided with flitch; Described flitch is provided with bottom template, above the template of bottom, is provided with side plate template; Described side plate template and upper strata steel pipe are connected by buckleing joint with lower floor steel pipe.
Described bottom template is provided with installing hole; Described suspension rod runs through bottom template installing hole.
Described triangular truss is formed by two groups, and the inner side and outer side that fire-fighting vestibule preset beam plate platform is connected with agent structure respectively arranges one group.
Described upper strata steel pipe upper surface is provided with top junction plate, and top junction plate is provided with connecting hole; Described lower floor steel pipe soffit is provided with lower connecting plate, and lower connecting plate is provided with connecting hole; Described suspension rod top and bottom are respectively arranged with external screw thread; Described lower connecting plate is connected with suspension rod two ends by nut with top junction plate.
The beneficial effect of the utility model hinge structure:
The unsettled fire-fighting vestibule of the utility model hangs mould and props up mould assembly, quick and easy for installation, structure is simple, safe and reliable, reduce construction cost.Set up by the welding of triangular truss, bearing load is large, construction span is large, stability strong, can effectively prevent degree of disturbing to be out of shape excessive generation, save artificial, boundary of works area is wider.It is regularization assembling that unsettled fire-fighting vestibule hangs mould formwork system, installs and removes convenient and swift, can repeat turnover and use, effectively improve installation rate and the safety of template, can effectively reduce engineering cost, accelerate the construction speed of engineering.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram that the unsettled fire-fighting vestibule of the utility model hangs that mould props up mould assembly;
Fig. 2 is the 1-1 sectional structure schematic diagram of Fig. 1;
Fig. 3 is that the utility model unsettled fire-fighting vestibule hangs mould and props up the suspension rod of mould assembly and upper and lower fastener for connection schematic diagram;
Fig. 4 is the triangular truss structural representation that the unsettled fire-fighting vestibule of the utility model hangs that mould props up mould assembly.
Critical piece symbol description in accompanying drawing:
In figure:
1, fire-fighting vestibule preset beam plate platform 2, cross binding beam
3, triangular truss 4, horizontal stand
5, side stand 6, upper strata steel pipe
7, lower floor's steel pipe 8, longitudinal steel pipe
9, suspension rod 10, flitch
11, bottom template 12, side plate template
13, top junction plate 14, lower connecting plate
15, structure is mended after nut 16, concrete
17, agent structure.
Detailed description of the invention
Referring to drawings and Examples, the utility model is described in detail:
Accompanying drawing 1-4 is known, a kind of unsettled fire-fighting vestibule hangs mould and props up mould assembly, comprise the fire-fighting vestibule preset beam plate platform 1 of adjacent two unit, inside described fire-fighting vestibule preset beam plate platform 1 free end, fire-fighting vestibule preset beam plate platform 1 width is provided with cross binding beam 2; Described cross binding beam 2 is provided with triangular truss 3, and described triangular truss 3 two ends are separately positioned on the cross binding beam 2 on the fire-fighting vestibule preset beam plate platform 1 of adjacent two unit; Described triangular truss 3 is fixedly connected with cross binding beam 2;
Described triangular truss 3 comprises horizontal stand 4 and side stand 5;
Described horizontal stand 4 is provided with upper strata steel pipe 6; Lower floor's steel pipe 7 is connected with upper strata steel pipe 6 by longitudinal steel pipe 8;
Described upper strata steel pipe 6 is connected with suspension rod 9 upper end; Described suspension rod 9 lower end is connected with lower floor steel pipe 7;
Described lower floor steel pipe 7 is provided with flitch 10; Described flitch 10 is provided with bottom template 11, above bottom template 11, is provided with side plate template 12; Described side plate template 12 and upper strata steel pipe 6 are connected by buckleing joint with lower floor steel pipe 7.
Described bottom template 11 is provided with installing hole; Described suspension rod 9 runs through bottom template installing hole.
Described triangular truss 3 is formed by two groups, and the inner side and outer side that fire-fighting vestibule preset beam plate platform 1 is connected with agent structure 17 respectively arranges one group.
Described upper strata steel pipe 6 upper surface is provided with top junction plate 13, and top junction plate 13 is provided with connecting hole; Described lower floor steel pipe 7 soffit is provided with lower connecting plate 14, and lower connecting plate 14 is provided with connecting hole; Described suspension rod 9 top and bottom are respectively arranged with external screw thread; Described lower connecting plate 14 is connected with suspension rod 9 two ends by nut 15 with top junction plate 13.
The unsettled fire-fighting vestibule of the utility model hangs mould and props up mould assembly, quick and easy for installation, structure is simple, safe and reliable, reduce construction cost.Set up by the welding of triangular truss, bearing load is large, construction span is large, stability strong, can effectively prevent degree of disturbing to be out of shape excessive generation, save artificial, boundary of works area is wider.It is regularization assembling that unsettled fire-fighting vestibule hangs mould formwork system, installs and removes convenient and swift, can repeat turnover and use, effectively improve installation rate and the safety of template, can effectively reduce engineering cost, accelerate the construction speed of engineering.
The unsettled fire-fighting vestibule of the utility model hangs mould and props up mould assembly, and work progress is as follows:
Concrete i iron being shelved on two ends is reserved in structure and is returned on beam, and be shelved on by triangle steel tubular truss on cross binding beam, triangle steel tubular truss carries out welding anchoring with cross binding beam contact site; Upper strata steel pipe is shelved on triangle steel tubular truss lower edge and horizontal stand, suspension rod is installed, lower floor's steel pipe is shelved below mounted suspension rod, lower floor's steel pipe below suspension rod is shelved the flitch and template that process, mend the beam slab side plate template of structure after installing concrete, side plate formwork sides steel pipe is connected with buckleing to save with lower floor and upper strata steel pipe.Progressively adjust the high-strength nut corrected on suspension rod during installation form, make it hang mould formwork and meet structural requirement, so just form whole unsettled fire-fighting vestibule and hang mould formwork stero.
After unsettled fire-fighting vestibule hangs the installation of mould formwork stero, arrange operative employee to carry out reinforcing bar binding and concreting, during concreting, symmetrically from two ends should carry out concreting toward centre.Reach after the length of time until concrete, carry out form removable, need the template of unsettled fire-fighting vestibule and suspension rod etc. to clean out after dismounting, template brushes release agent, is then transported to hypomere construction area, and turnover uses.
The above is only preferred embodiment of the present utility model, not does any pro forma restriction to structure of the present utility model.Every above embodiment is done according to technical spirit of the present utility model any simple modification, equivalent variations and modification, all belong within the scope of the technical solution of the utility model.
Claims (4)
1. unsettled fire-fighting vestibule hangs mould and props up a mould assembly, it is characterized in that:
Comprise the fire-fighting vestibule preset beam plate platform of adjacent two unit, inside described fire-fighting vestibule preset beam plate platform free end, fire-fighting vestibule preset beam plate berm width direction is provided with cross binding beam; Described cross binding beam is provided with triangular truss, and described triangular truss two ends are separately positioned on the cross binding beam on the fire-fighting vestibule preset beam plate platform of adjacent two unit; Described triangular truss is fixedly connected with cross binding beam;
Described triangular truss comprises horizontal stand and side stand;
Described horizontal stand is provided with upper strata steel pipe; Lower floor's steel pipe is connected with upper strata steel pipe by longitudinal steel pipe;
Described upper strata steel pipe is connected with suspension rod upper end; Described suspension rod lower end is connected with lower floor steel pipe;
Described lower floor steel pipe is provided with flitch; Described flitch is provided with bottom template, above the template of bottom, is provided with side plate template; Described side plate template and upper strata steel pipe are connected by buckleing joint with lower floor steel pipe.
2. unsettled fire-fighting vestibule hangs mould and props up mould assembly according to claim 1, it is characterized in that: described bottom template is provided with installing hole; Described suspension rod runs through bottom template installing hole.
3. unsettled fire-fighting vestibule hangs mould and props up mould assembly according to claim 1, it is characterized in that: described triangular truss is formed by two groups, and the inner side and outer side that fire-fighting vestibule preset beam plate platform is connected with agent structure respectively arranges one group.
4. unsettled fire-fighting vestibule hangs mould and props up mould assembly according to claim 1, it is characterized in that: described upper strata steel pipe upper surface is provided with top junction plate, and top junction plate is provided with connecting hole; Described lower floor steel pipe soffit is provided with lower connecting plate, and lower connecting plate is provided with connecting hole; Described suspension rod top and bottom are respectively arranged with external screw thread; Described lower connecting plate is connected with suspension rod two ends by nut with top junction plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520395875.6U CN204754212U (en) | 2015-06-10 | 2015-06-10 | Unsettled fire control vestibule hangs mould formwork assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520395875.6U CN204754212U (en) | 2015-06-10 | 2015-06-10 | Unsettled fire control vestibule hangs mould formwork assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204754212U true CN204754212U (en) | 2015-11-11 |
Family
ID=54468935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520395875.6U Expired - Fee Related CN204754212U (en) | 2015-06-10 | 2015-06-10 | Unsettled fire control vestibule hangs mould formwork assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204754212U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374555A (en) * | 2018-05-04 | 2018-08-07 | 舜杰建设(集团)有限公司 | Girder with rolled steel section en cased in concrete, which pours, to be smash without support hung formwork structure and method |
-
2015
- 2015-06-10 CN CN201520395875.6U patent/CN204754212U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374555A (en) * | 2018-05-04 | 2018-08-07 | 舜杰建设(集团)有限公司 | Girder with rolled steel section en cased in concrete, which pours, to be smash without support hung formwork structure and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104453197B (en) | High Large Cantilever concrete structural steel shape supports platform | |
CN201053200Y (en) | Assembled | |
CN201546435U (en) | Bolted stayed cantilever scaffold | |
CN101397844B (en) | Construction method of special section steel concrete composite structure inclined wall mould base engineering | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN202017346U (en) | Late poured band hanging formwork structure | |
CN204126230U (en) | Assembly scaffold unit | |
CN108979131B (en) | Integral lifting platform device for high-rise building construction steel formwork and operation frame | |
CN103422668A (en) | Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof | |
CN105155830A (en) | Construction method for combined type fixed and integral lifting of elevator shaft stereotyped operation platform | |
CN107419746A (en) | A kind of mobile formwork system and its construction method | |
CN213329955U (en) | Flower basket diagonal rod type overhanging scaffold | |
CN207392716U (en) | A kind of tool-type suspension scaffold | |
CN103993666A (en) | Improved supporting system construction method suitable for large overhung outer floating plate roof | |
CN207879008U (en) | Diameter Silo structure roof support system | |
CN107514145A (en) | A kind of removable steel roofing liner installation construction device and method | |
CN204781960U (en) | High -rise building shear force wall movement joint department template is propped up and is established and reinforcement system | |
CN204754212U (en) | Unsettled fire control vestibule hangs mould formwork assembly | |
CN204456810U (en) | A kind of gaily decorated basket pull bar suspension scaffold | |
CN206784915U (en) | A kind of new steel structure suspension type flooring gang form | |
CN208201919U (en) | A kind of piping lane monoblock type, which is quickly pacified, tears aluminium alloy mould bases support construction open | |
CN101250942A (en) | Large mould plate pylon | |
CN203334643U (en) | Tower crane standard knot and structural steel combination high-altitude large-span operation frame device | |
CN201943350U (en) | Supporting steel frame for die holder of high-altitude large span overhanging structure | |
CN209907894U (en) | Flower basket pull rod type overhanging scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151111 Termination date: 20160610 |
|
CF01 | Termination of patent right due to non-payment of annual fee |