CN204730632U - Gangue tunnel cave cooling section structure - Google Patents

Gangue tunnel cave cooling section structure Download PDF

Info

Publication number
CN204730632U
CN204730632U CN201520269148.5U CN201520269148U CN204730632U CN 204730632 U CN204730632 U CN 204730632U CN 201520269148 U CN201520269148 U CN 201520269148U CN 204730632 U CN204730632 U CN 204730632U
Authority
CN
China
Prior art keywords
kiln
layer
wall
track
plateau
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520269148.5U
Other languages
Chinese (zh)
Inventor
吴建昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changxing Zhen Ming Refractory Co Ltd
Original Assignee
Changxing Zhen Ming Refractory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changxing Zhen Ming Refractory Co Ltd filed Critical Changxing Zhen Ming Refractory Co Ltd
Priority to CN201520269148.5U priority Critical patent/CN204730632U/en
Application granted granted Critical
Publication of CN204730632U publication Critical patent/CN204730632U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)

Abstract

The utility model discloses a kind of gangue tunnel cave cooling section structure, the kiln car comprising kiln body and travel in described kiln body, kiln body comprises Yao Ding, kiln wall and service aisle, kiln wall comprises the body of wall plateau for being fixed on ground, body of wall plateau adopts rubble brick body to be built into, and described body of wall plateau is provided with the padded layer adopting concreting; Padded layer is provided with the first body of wall layer, the second cavity layer, cavity insulating and the 3rd body of wall layer that set gradually from the inside to the outside, cooling section vibrational power flow has kiln top insulating, the below of kiln top insulating is provided with the support boatswain chair for kiln top insulating, and described boatswain chair is connected on elevator by steel wire rope.The utility model insulation construction not only easy construction is quick, and energy-conservation and environment-friendly advantage, improves heat insulation effect, reduces energy consumption; Kiln top heat insulation structural arranges rationally, and kiln top insulating can powerful support.

Description

Gangue tunnel cave cooling section structure
Technical field
The utility model relates to a kind of gangue tunnel cave cooling section structure.
Background technology
Tunnel cave is generally a long linear tunnel, and fixing wall and vault are arranged at its both sides and top, and the track that bottom is laid runs kiln car.Combustion apparatus is located at the both sides, middle part of tunnel cave, constitute fixing high temperate zone--clinkering zone, the high-temperature flue gas that burning produces is under the effect of tunnel cave front end chimney or air-introduced machine, flow along tunnel to kiln hood direction, preheating enters the goods in kiln step by step simultaneously, and this section constitutes the preheating zone of tunnel cave.Blast cold wind at the kiln tail of tunnel cave, the goods of latter a section in cooling tunnel kiln, the cold wind blasted flows through goods and after being heated, then extracts out and send into the thermal source of drier as dried, and this section just constitutes the salband of tunnel cave.In existing refractory material production process, consider cost factor, mostly adopt gangue as combustion material, gangue is the solid waste discharged in coal mining process and coal washing process, is a kind of black gray expandable rock lower, harder than coal with a kind of phosphorus content of coal seam association in coalification course.Comprise choose from the spoil of extraction top board, base plate and interlayer and coal washing process in the digging gangue in tunnelling process, mining process wash spoil.In the process firing refractory material, there is following problem: the heat insulation effect of kiln body is poor in existing gangue tunnel cave cooling section structure, causes energy to run off more, affect production cost and product quality; Kiln top heat insulation structural arranges unreasonable, causes kiln top insulating to obtain powerful support, limits the thickness of kiln top insulating, have impact on heat insulation effect.
Utility model content
The purpose of this utility model is to overcome above shortcomings in prior art, and provides a kind of reasonable in design, better heat preservation, the gangue tunnel cave cooling section structure that kiln top heat insulation structural structural strength is high.
The technical scheme in the invention for solving the above technical problem is:
A kind of gangue tunnel cave cooling section structure, it is characterized in that: the kiln car comprising kiln body and travel in described kiln body, kiln body comprises Yao Ding, kiln wall and service aisle, kiln wall comprises the body of wall plateau for being fixed on ground, body of wall plateau adopts rubble brick body to be built into, and described body of wall plateau is provided with the padded layer adopting concreting, padded layer is provided with the first body of wall layer set gradually from the inside to the outside, second cavity layer, cavity insulating and the 3rd body of wall layer, described first body of wall layer adopts concreting to form, second cavity layer adopts light fire brick to be built into, 3rd body of wall layer adopts brick body to be built into, supporting layer is provided with between described second cavity layer and padded layer, described supporting layer adopts brick body to be built into, the separation layer adopting refractory brick to form is provided with between supporting layer and the 3rd body of wall layer, the articulamentum adopting concreting is provided with between first body of wall layer and supporting layer, the medial surface 30mm-60mm of the medial surface distance first body of wall layer of articulamentum, the medial surface 80mm-120mm of the medial surface distance supporting layer of articulamentum, the track structure travelled for kiln car is provided with in service aisle, described track structure comprises track plateau and track installation layer, described track plateau adopts rubble brick body to be built into, the width of track plateau is 500mm-900mm, track installation layer adopts concreting to form, be embedded with U bolt in track installation layer, be provided with track between the two ends of U bolt, described track is fixed on U bolt by pressure strip, kiln top comprises kiln lamina tecti, the below of kiln lamina tecti is fixed with elevator, the lower end of elevator connects kiln top insulating, the two ends up and down of elevator are provided with inserting groove, cooling section vibrational power flow has kiln top insulating, the below of kiln top insulating is provided with the support boatswain chair for kiln top insulating, and described boatswain chair is connected on elevator by steel wire rope.
As preferably, cooling section vibrational power flow has for air-blast device pressure balanced in service aisle, described air-blast device comprises air blast, the air blast erecting bed adopting refractory brick to be built into is provided with between adjacent two track plateau in service aisle, air blast erecting bed is provided with the air blast installing hole for installing air blast, service aisle bottom surface residing for described air blast erecting bed is 15 °-35 ° and is obliquely installed, air-blast device connection control system.
The utility model compared with prior art, has the following advantages and effect: insulation construction not only easy construction is quick, and energy-conservation and environment-friendly advantage, improves heat insulation effect, reduces energy consumption; Kiln top heat insulation structural arranges rationally, and kiln top insulating can powerful support, can arrange thicker kiln top insulating, ensure that heat insulation effect, and structure is simple, the easy construction of kiln top, and construction cost is low; By air blast to be arranged on inclined-plane and by arranging multiple air blast, improve cooling effect, and be provided with the air blast erecting bed adopting refractory brick to be built in service aisle between adjacent two track plateau, make the construction of air blast more simple, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment gangue tunnel cave.
Fig. 2 is the cross section structure schematic diagram at A-A place in Fig. 1 in the utility model embodiment.
Fig. 3 is the cross section structure schematic diagram at B-B place in Fig. 1 in the utility model embodiment.
Fig. 4 is the cross section structure schematic diagram at C-C place in Fig. 1 in the utility model embodiment.
Fig. 5 is the cross section structure schematic diagram at D-D place in Fig. 1 in the utility model embodiment.
Fig. 6 is the cross section structure schematic diagram at E-E place in Fig. 1 in the utility model embodiment.
Fig. 7 is the cross section structure schematic diagram at F-F place in Fig. 1 in the utility model embodiment.
Fig. 8 is the cross section structure schematic diagram at G-G place in Fig. 1 in the utility model embodiment.
Fig. 9 is the cross section structure schematic diagram at H-H place in Fig. 1 in the utility model embodiment.
Figure 10 is the utility model embodiment middle orbit mounting structure schematic diagram.
Figure 11 is the structural representation of sand sealing groove structure in the utility model embodiment.
Figure 12 is the Elevator structure schematic diagram in the utility model embodiment.
Figure 13 is the mounting structure schematic diagram of suspended block and axle brick in the utility model embodiment.
Figure 14 is the structural representation throwing sandpipe in the utility model embodiment.
Figure 15 is the mounting structure schematic diagram of air blast in the utility model embodiment.
Figure 16 is the mounting structure schematic diagram of another angle air blast in the utility model embodiment.
Detailed description of the invention
Below in conjunction with accompanying drawing, also by embodiment, the utility model is described in further detail, and following examples are that the utility model is not limited to following examples to explanation of the present utility model.
See Fig. 1-Figure 16, the present embodiment gangue tunnel cave, comprise the kiln body extended transversely and the kiln car travelled in described kiln body, kiln body comprises Yao Ding, kiln wall and service aisle 1, service aisle 1 comprises inducer L1, preheating section L2, furnace zone L3, soaking zone L4 and cooling section L5 in the direction of extension successively, kiln wall comprises the body of wall plateau 21 for being fixed on ground, body of wall plateau 21 adopts rubble brick body to be built into, and described body of wall plateau 21 is provided with the padded layer 22 adopting concreting.
Preheating section L2, furnace zone L3, the padded layer 22 of soaking zone L4 and cooling section L5 is provided with the first body of wall layer 23 set gradually from the inside to the outside, second cavity layer 24, cavity insulating 25 and the 3rd body of wall layer 26, described first body of wall layer 23 adopts concreting to form, second cavity layer 24 adopts light fire brick to be built into, 3rd body of wall layer 26 adopts brick body to be built into, supporting layer 27 is provided with between described second cavity layer 24 and padded layer 22, described supporting layer 27 adopts brick body to be built into, the separation layer 28 adopting refractory brick to form is provided with between supporting layer 27 and the 3rd body of wall layer 26, the articulamentum 29 adopting concreting is provided with between first body of wall layer 23 and supporting layer 27, the medial surface 30mm-60mm of the medial surface distance first body of wall layer 23 of articulamentum 29, the medial surface 80mm-120mm of the medial surface distance supporting layer 27 of articulamentum.
Track 34 structure travelled for kiln car is provided with in the service aisle 1 of inducer L1, preheating section L2, furnace zone L3, soaking zone L4 and cooling section L5, described track 34 structure comprises track plateau 31 and track installation layer 32, described track plateau 31 adopts rubble brick body to be built into, the width of track plateau 31 is 500mm-900mm, track installation layer 32 adopts concreting to form, U bolt 33 is embedded with in track installation layer 32, be provided with track 34 between the two ends of U bolt 33, described track 34 is fixed on U bolt 33 by pressure strip 35.
Inducer L1, preheating section L2, furnace zone L3, the padded layer 22 of soaking zone L4 and cooling section L5 is provided with the sand sealing groove structure 41 for sealing kiln car bottom space by service aisle 1 side, described sand sealing groove comprises the angle steel 42 be embedded in padded layer 22, angle steel 42 is obliquely installed in 20 °-70 °, angle steel 42 is welded with dowel 43 by service aisle 1 side, the top of dowel 43 is fixed with sand sealing groove angle steel 44, the cross section of described sand sealing groove angle steel 44 is L-shaped, the side of described dowel 43 is welded with strengthens steel plate 45, described sand sealing groove angle steel 44 is fitted in be strengthened steel plate 45 and is bolted sand sealing groove angle steel 44 and strengthens steel plate 45, the appearance sand launder 46 for holding sealing sand is formed between sand sealing groove angle steel 44 and padded layer 22.
Kiln top comprises kiln lamina tecti, and the two ends of kiln lamina tecti are supported on the top of the 3rd body of wall layer 26.
The below of the kiln lamina tecti of preheating section L2, furnace zone L3, soaking zone L4 and cooling section L5 is fixed with elevator 51, the lower end of elevator 51 connects kiln top insulating 52, the two ends up and down of elevator 51 are provided with inserting groove 511, preheating section L2, furnace zone L3, soaking zone L4 are provided with kiln top insulating 52, the below of kiln top insulating 52 is provided with the support boatswain chair 53 for kiln top insulating 52, and described boatswain chair is connected on elevator 51 by steel wire rope.
Preheating section L2 is provided with and throws sandpipe 61, air intake structure, the padded layer 22 of inducer L1 is provided with adopt light fire brick be built into the 4th before body of wall layer 62, body of wall layer 62 before described throwing sandpipe 61 oblique cutting enters the 4th, the inside and outside two ends of throwing sandpipe 61 pass from both sides inside and outside body of wall layer 62 before the 4th respectively, throw sandpipe 61 to be obliquely installed in 20 °-70 °, the outer end of throwing sandpipe 61 is provided with the throwing sandpipe cover plate 63 being hinged on and throwing on sandpipe 61.
Described air intake structure comprises the air inlet duct 71 outside the kiln wall being arranged on inducer L1, described air inlet duct 71 adopts light fire brick to be built into, described inducer L1 is provided with the air inlet pipe 72 penetrating body of wall plateau 21 from air inlet duct 71, the inner of described air inlet pipe 72 is arranged on the medium position of service aisle 1, the two ends being provided with the first track cover plate 73, first track cover plate 73 in the service aisle 1 of inducer L1 are fixed on adjacent two track installation layers 32.
Preheating section L2 is provided with fume extractor, fume extractor comprises multiple first tube connectors 81 be arranged on above kiln lamina tecti, the two ends of described first tube connector 81 are communicated with the second tube connector 82 respectively, two the second tube connectors 82 penetrate kiln wall from the both sides of preheating section L2 respectively and are communicated in service aisle 1, the below of described first tube connector 81 is communicated with multiple the 3rd tube connector 83 that is set in distance, described 3rd tube connector 83 is in vertically arranging and penetrate kiln top to be communicated in service aisle 1, realize being communicated with by the 4th tube connector 84 between first tube connector 81, 4th tube connector 84 accesses smoking blower fan.
Be provided with between adjacent orbit mounting layer 32 in the service aisle 1 of preheating section L2 every hollow plate 102, describedly adopt pea gravel concreten to be built into every empty version, be arranged on above the space between adjacent orbit mounting layer 32 every empty version.
Furnace zone L3 is provided with the throwing texture of coal for throwing in gangue, throw texture of coal to comprise and penetrate kiln top from the top on kiln top and the throwing coal pipe 11 being communicated to service aisle 1, described throwing coal pipe 11 comprises throws pipe 111 and pipe 112 under throwing coal on coal, on described throwing coal, pipe 111 and throwing under coal is connected by flange arrangement 113 between pipe 112, on described throwing coal, the top of pipe 111 realizes sealing by throwing coal pipe lid 114, described throwing coal pipe lid 114 being provided with for mentioning the handle 115 throwing coal pipe lid 114, throwing on coal and pipe 111 is welded with the retainer ring 116 being against kiln top.
Furnace zone L3 is provided with and first send hot air apparatus for what control temperature in service aisle 1, first send hot air apparatus to comprise is arranged on the 5th tube connector 85 on kiln top, the below of described first tube connector 81 is communicated with multiple the 6th tube connector 86 that is set in distance, 6th tube connector 86 is in vertically arranging and penetrate kiln top to be communicated in service aisle 1, and the 5th tube connector 85 is connected to and send air-heater 101.
Soaking zone L4 is provided with and second send hot air apparatus for what control temperature in service aisle 1, second send hot air apparatus to comprise is arranged on multiple 7th tube connectors 87 above kiln lamina tecti, the two ends of described 6th tube connector 87 are communicated with the 8th tube connector 88 respectively, two the 8th tube connectors 88 penetrate kiln wall from the both sides of soaking zone L4 respectively and are communicated in service aisle 1, the below of described 7th tube connector 87 is communicated with multiple the 9th tube connector 89 that is set in distance, described 9th tube connector 89 is in vertically arranging and penetrate kiln top to be communicated in service aisle 1, realize being communicated with and being connected to sending air-heater 101 by the tenth tube connector 810 between 7th tube connector 87, in the service aisle 1 sending air-heater 101 to be connected to preheating section L2.
Preheating section L2 and furnace zone L3 is provided with for sensing the baroceptor of service aisle 1 internal gas pressure and the temperature sensor for sensing the temperature in service aisle 1, temperature sensor and baroceptor connection control system, control system connects air-heater, cooling section L5 is provided with for air-blast device pressure balanced in service aisle 1, described air-blast device comprises air blast 121, the air blast erecting bed 122 adopting refractory brick to be built into is provided with between adjacent two track plateau 31 in service aisle 1, air blast erecting bed 122 is provided with air blast 121 installing hole for installing air blast 121, service aisle 1 bottom surface residing for described air blast erecting bed 122 is 15 °-35 ° and is obliquely installed, air-blast device connection control system.
Soaking zone L4 is provided with suspended block 131 structure, described suspended block 131 structure comprises successively near multiple suspended blocks 131 of arrangement, described suspended block 131 is in inverted T-shape, the upper end of described suspended block 131 is provided with the inserted terminal 1311 for snapping in elevator 51 lower end inserting groove 511, the both sides, lower end of described suspended block 131 are provided with semicircular axle brick 132 installing hole, axle brick 132 installing hole of adjacent two suspended blocks 131 is spliced into axle brick 132 hole of inserting for axle brick 132, is filled with insulation material between adjacent two suspended blocks 131.
Above content described in this description is only to the explanation of the utility model example.The utility model person of ordinary skill in the field can make various amendment or supplements or adopt similar mode to substitute to described specific embodiment; only otherwise depart from the content of the utility model description or surmount this scope as defined in the claims, protection domain of the present utility model all should be belonged to.

Claims (2)

1. a gangue tunnel cave cooling section structure, it is characterized in that: the kiln car comprising kiln body and travel in described kiln body, kiln body comprises Yao Ding, kiln wall and service aisle, kiln body comprises Yao Ding, kiln wall and service aisle, kiln wall comprises the body of wall plateau for being fixed on ground, body of wall plateau adopts rubble brick body to be built into, and described body of wall plateau is provided with the padded layer adopting concreting, padded layer is provided with the first body of wall layer set gradually from the inside to the outside, second cavity layer, cavity insulating and the 3rd body of wall layer, described first body of wall layer adopts concreting to form, second cavity layer adopts light fire brick to be built into, 3rd body of wall layer adopts brick body to be built into, supporting layer is provided with between described second cavity layer and padded layer, described supporting layer adopts brick body to be built into, the separation layer adopting refractory brick to form is provided with between supporting layer and the 3rd body of wall layer, the articulamentum adopting concreting is provided with between first body of wall layer and supporting layer, the medial surface 30mm-60mm of the medial surface distance first body of wall layer of articulamentum, the medial surface 80mm-120mm of the medial surface distance supporting layer of articulamentum, the track structure travelled for kiln car is provided with in service aisle, described track structure comprises track plateau and track installation layer, described track plateau adopts rubble brick body to be built into, the width of track plateau is 500mm-900mm, track installation layer adopts concreting to form, be embedded with U bolt in track installation layer, be provided with track between the two ends of U bolt, described track is fixed on U bolt by pressure strip, kiln top comprises kiln lamina tecti, the below of kiln lamina tecti is fixed with elevator, the lower end of elevator connects kiln top insulating, the two ends up and down of elevator are provided with inserting groove, cooling section vibrational power flow has kiln top insulating, the below of kiln top insulating is provided with the support boatswain chair for kiln top insulating, and described boatswain chair is connected on elevator by steel wire rope.
2. gangue tunnel cave cooling section structure according to claim 1, it is characterized in that: cooling section vibrational power flow has for air-blast device pressure balanced in service aisle, described air-blast device comprises air blast, the air blast erecting bed adopting refractory brick to be built into is provided with between adjacent two track plateau in service aisle, air blast erecting bed is provided with the air blast installing hole for installing air blast, service aisle bottom surface residing for described air blast erecting bed is 15 °-35 ° and is obliquely installed, air-blast device connection control system.
CN201520269148.5U 2015-04-29 2015-04-29 Gangue tunnel cave cooling section structure Expired - Fee Related CN204730632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520269148.5U CN204730632U (en) 2015-04-29 2015-04-29 Gangue tunnel cave cooling section structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520269148.5U CN204730632U (en) 2015-04-29 2015-04-29 Gangue tunnel cave cooling section structure

Publications (1)

Publication Number Publication Date
CN204730632U true CN204730632U (en) 2015-10-28

Family

ID=54388974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520269148.5U Expired - Fee Related CN204730632U (en) 2015-04-29 2015-04-29 Gangue tunnel cave cooling section structure

Country Status (1)

Country Link
CN (1) CN204730632U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104792161A (en) * 2015-04-29 2015-07-22 长兴震铭耐火材料有限公司 Coal gangue tunnel kiln cooling section structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104792161A (en) * 2015-04-29 2015-07-22 长兴震铭耐火材料有限公司 Coal gangue tunnel kiln cooling section structure
CN104792161B (en) * 2015-04-29 2017-03-29 长兴震铭耐火材料有限公司 A kind of gangue tunnel cave cools down segment structure

Similar Documents

Publication Publication Date Title
CN103666507B (en) Internally heated coal carbonization furnace, internally heated coal carbonization system and coal carbonization technical method
CN203869493U (en) Tunnel kiln
CN104792158A (en) Tunnel kiln with automatic temperature control system
CN204730639U (en) For the production of the tunnel cave of refractory material
CN205002590U (en) Tunnel cave with automatic temperature control system
CN204730632U (en) Gangue tunnel cave cooling section structure
CN204739895U (en) Gangue tunnel cave
CN204757657U (en) Gangue tunnel cave calcination stage structure
CN204730635U (en) Gangue tunnel cave soaking zone structure
CN204757658U (en) Gangue tunnel cave preheating section structure
CN204730637U (en) Energy-saving tunnel cave
CN204730631U (en) For the production of the gangue tunnel cave of refractory material
CN104764321B (en) A kind of tunnel cave for producing refractory material
CN204987850U (en) A temperature control system for tunnel cave
CN205002594U (en) Tunnel cave with sand seal structure
CN204730640U (en) Tunnel cave insulation construction
CN101709222B (en) Dry quenching furnace shell with novel structure
CN104792160B (en) A kind of gangue tunnel cave is calcined segment structure
CN104819642B (en) A kind of gangue tunnel cave
CN204739897U (en) A throw coal structure for tunnel cave
CN201974020U (en) Tunnel kiln for drying brown coal
CN104792167A (en) Energy-saving type tunnel kiln
CN104792161A (en) Coal gangue tunnel kiln cooling section structure
CN104792159A (en) Coal gangue tunnel kiln for producing refractory materials
CN205002595U (en) Tunnel cave sand seal structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028

Termination date: 20160429