CN204729132U - Permanent point is laid in a kind of underground coal mine measurement - Google Patents

Permanent point is laid in a kind of underground coal mine measurement Download PDF

Info

Publication number
CN204729132U
CN204729132U CN201520423112.8U CN201520423112U CN204729132U CN 204729132 U CN204729132 U CN 204729132U CN 201520423112 U CN201520423112 U CN 201520423112U CN 204729132 U CN204729132 U CN 204729132U
Authority
CN
China
Prior art keywords
coal mine
underground coal
nut
laid
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520423112.8U
Other languages
Chinese (zh)
Inventor
陈光涛
任凌
罗帅
王玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520423112.8U priority Critical patent/CN204729132U/en
Application granted granted Critical
Publication of CN204729132U publication Critical patent/CN204729132U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Preventing Corrosion Or Incrustation Of Metals (AREA)

Abstract

The utility model provides a kind of underground coal mine measurement to lay permanent point, comprise copper stake, the one end side of copper stake is welded with the special nut of anchor pole, nut is connected with anchor pole head, the cylinder of the other end has a groove, bottom land is a plane, has a through hole between bottom land and another end face of copper stake.Permanent measurement point of the present utility model makes simple, and draw materials conveniently, method for embedding is reasonable, and not easily corrosion., on the tunnel of, roof cracking poor especially at geological environment or uncompacted back, link together with anchor pole meanwhile, can be more firm.

Description

Permanent point is laid in a kind of underground coal mine measurement
Technical field
The utility model relates to underground coal mine field of measuring technique, particularly relates to oneplant underground coal mine measurement and lay permanent measuring point.
Background technology
Coal mine survey is normally produced for the excavation in tunnel, the through of mine and coal and is ensured that the life security of staff all has great importance, and is called as " eyes " of coal production.The developing measurement of coal mine roadway provides construction center and stringcourse, and surveying setting-out has very important effect to guarantee and raising construction quality.So the preservation of measuring permanent control point is extremely important, the survey mark in complicated tunnel is often easily unstable or destroyed, delays construction speed.The time length that in unstable tunnel, survey mark is preserved directly has influence on construction speed and quality.Underground survey point is the basic facilities that roadway opening is measured, and survey mark is embedded in back more.Due to the moist many water in down-hole, and have acidity effect, use iron sticks up easily rotten tactile raw embroidery; Use survey nail bury underground very shallow, because of tunnel decoration and repair easily wreck, not easily preserve, do not have the effect of permanent survey mark.Once survey mark damages, will take the production time buries point observation again, can bring impact to coal production.Meanwhile, because shaft building project is in mountain area and desert mostly, make and buy permanent stake point inconvenient.
Utility model content
The technical problems to be solved in the utility model is that providing a kind of makes simple, the permanent measuring point of underground coal mine measurement easily of drawing materials laying, to solve prior art Problems existing.
For solving the problems of the technologies described above, the utility model by the following technical solutions:
Permanent point is laid in a kind of underground coal mine measurement, and comprise copper stake, the one end side of copper stake is welded with the special nut of anchor pole, nut is connected with anchor pole head, the cylinder of the other end has a groove, bottom land is a plane, has a through hole between bottom land and another end face of copper stake.
Fish pearl glue is scribbled, chromium plating on described nut external surface in described nut.
Permanent measurement point of the present utility model makes simple, and draw materials conveniently, method for embedding is reasonable, and not easily corrosion., on the tunnel of, roof cracking poor especially at geological environment or uncompacted back, link together with anchor pole meanwhile, can be more firm.
Accompanying drawing explanation
Fig. 1 is structure chart of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing 1 and detailed description of the invention, the utility model is described in further detail.
As shown in Figure 1, the utility model provides a kind of underground coal mine measurement to lay permanent point, comprise copper stake 1, the one end side of copper stake 1 is welded with the special nut of anchor pole 2, nut 2 is connected with anchor pole head, increases the steadiness of permanent point, the cylinder of the other end has a groove 3, bottom land is a plane, has a through hole 4 between bottom land and another end face of copper stake.
Nut 2 screw thread scribbles fish pearl glue, makes tightening of anchor pole and nut more firm, chromium plating on nut 2 external surface.Can anticorrosion.
The size of copper post is selected as required, and the diameter range usually selecting copper stake is 18mm ~ 20mm, and length is about 300mm.
Permanent measurement point of the present utility model makes simple, and draw materials conveniently, method for embedding is reasonable, and not easily corrosion., on the tunnel of, roof cracking poor especially at geological environment or uncompacted back, link together with anchor pole meanwhile, can be more firm.

Claims (4)

1. permanent point is laid in a underground coal mine measurement, comprise copper stake (1), it is characterized in that: the one end side of copper stake (1) is welded with the special nut of anchor pole (2), the cylinder of the other end has a groove (3), bottom land is a plane, has a through hole (4) between bottom land and another end face of copper stake.
2. permanent point is laid in underground coal mine measurement according to claim 1, and it is characterized in that: nut scribbles fish pearl glue in (2), chromium plating on nut (2) external surface, nut (2) is connected with anchor pole head.
3. permanent point is laid in underground coal mine measurement according to claim 1, it is characterized in that: the diameter range of copper stake (1) is 18mm ~ 20mm.
4. permanent point is laid in underground coal mine measurement according to claim 1, it is characterized in that: the length of copper stake (1) is 300mm.
CN201520423112.8U 2015-06-18 2015-06-18 Permanent point is laid in a kind of underground coal mine measurement Expired - Fee Related CN204729132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520423112.8U CN204729132U (en) 2015-06-18 2015-06-18 Permanent point is laid in a kind of underground coal mine measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520423112.8U CN204729132U (en) 2015-06-18 2015-06-18 Permanent point is laid in a kind of underground coal mine measurement

Publications (1)

Publication Number Publication Date
CN204729132U true CN204729132U (en) 2015-10-28

Family

ID=54387491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520423112.8U Expired - Fee Related CN204729132U (en) 2015-06-18 2015-06-18 Permanent point is laid in a kind of underground coal mine measurement

Country Status (1)

Country Link
CN (1) CN204729132U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355257A (en) * 2017-09-01 2017-11-17 中煤第建设有限公司 The permanent traverse point of underground mine use and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355257A (en) * 2017-09-01 2017-11-17 中煤第建设有限公司 The permanent traverse point of underground mine use and installation method

Similar Documents

Publication Publication Date Title
CN102493822A (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
PL418845A1 (en) Indexes of structural differentiation of upper zones of Ordovician limestone filling and method to determine it
CN106289162A (en) A kind of settlement point device resisting body frost heaving and thaw collapse and soil monitoring method
WO2019109700A1 (en) Anchor bolting method for enhancing roof stability using reinforced roof and side of coal roadway
CN204729132U (en) Permanent point is laid in a kind of underground coal mine measurement
CN204612719U (en) A kind of settlement observer
Sobolevskyi et al. Quality control of drilling operations for efficiency upgrading of creation of separation plane by lineage drilling
CN204705354U (en) Permanent point is laid in a kind of underground coal mine measurement
Konyukhov Analysis of mechanized tunneling parameters to determine the overcutting characteristics
CN204705355U (en) Permanent point is laid in a kind of underground coal mine measurement
CN103400530B (en) Mini automatic support system applied to physical simulation test
CN206205937U (en) A kind of post-grouting device of oil storage cavern
CN204286440U (en) A kind of survey station point marker peg
CN103233747B (en) Advance drilling emitter
CN204085436U (en) For the monitoring instrument of upward slope in tunnel soil body slipping cracking monitoring
CN203479306U (en) Settlement observation mark for measurement
CN206496763U (en) One kind drilling lay out board
CN204405071U (en) Geodetic Surveying is with easily finding triangulation pillar system
CN205591831U (en) Eccentric wedge of driling entangles angle mount and puts
CN204327008U (en) Faucet device in a kind of borer system
Cope Detailed stratigraphy of the uppermost Kimmeridge Clay Formation (Upper Jurassic) from the Swanworth Boreholes, Dorset, UK
CN203890994U (en) Direction limiting stopper for underwater inclinometer casings
CN103912278B (en) A kind of method that heavy peel-off device is toppled over and subside when preventing the residual coal of outdoor second mining
CN103469779A (en) Standard penetration test device for dividing rock weathering degree
CN210638690U (en) Desert landform surface settlement observation point

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028