CN204728333U - A kind of underwater support table foundation ditch leading truck - Google Patents

A kind of underwater support table foundation ditch leading truck Download PDF

Info

Publication number
CN204728333U
CN204728333U CN201520436225.1U CN201520436225U CN204728333U CN 204728333 U CN204728333 U CN 204728333U CN 201520436225 U CN201520436225 U CN 201520436225U CN 204728333 U CN204728333 U CN 204728333U
Authority
CN
China
Prior art keywords
leading truck
guide pile
bracket
interior
cushion cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520436225.1U
Other languages
Chinese (zh)
Inventor
宣云干
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Research Institute of Building Science Co Ltd
Original Assignee
Jiangsu Research Institute of Building Science Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Research Institute of Building Science Co Ltd filed Critical Jiangsu Research Institute of Building Science Co Ltd
Priority to CN201520436225.1U priority Critical patent/CN204728333U/en
Application granted granted Critical
Publication of CN204728333U publication Critical patent/CN204728333U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a kind of underwater support table foundation ditch leading truck, this leading truck comprises outer leading truck and interior leading truck, outer leading truck is by interior, outer two flange beam stands are formed, interior leading truck comprises i iron waling, direction peg and supporting steel pipe, wherein i iron waling distributes along the outer of cushion cap, after direction peg injection completes, in direction peg side, guide pile bracket is installed, guide pile bracket is weldingly fixed on direction peg sidewall, when guide pile bracket is installed, guide pile bracket end face absolute altitude is controlled with level gauge, to ensure that each bracket carries out spacing with stop in same level, this leading truck ensure that carrying out smoothly of cushion cap foundation pit construction, the construction quality of cushion cap foundation ditch is improved greatly, this cofferdam construction method for supporting effectively can improve the efficiency of construction of steel sheet-pile cofferdam simultaneously, reduces cost of labor, contributes to the utilization and extention of enterprise.

Description

A kind of underwater support table foundation ditch leading truck
[technical field]
The utility model relates to a kind of underwater support table foundation ditch leading truck, belongs to technical field of building construction.
[background technology]
The supporting of man-hour requirement cofferdam is executed at highway bridge underwater support table, phytal zone adopts general steel plate pile cofferdam, concrete sealing bottom, mechanical equivalent of light excavation, deep water bearing platform construction adopts and lengthens steel sheet-pile cofferdam, underwater concrete back cover, sand taken out by hopper ship, tell sand excavation, cushion cap and access bridge underwater support table adopt steel sheet-pile cofferdam, cofferdam is rectangle single wall steel sheet-pile cofferdam, steel pipe pile is adopted to make guide pile, connect as nose girder with shaped steel, cofferdam supporting is conventional a kind of sheet pile cofferdam, steel sheet pile is a kind of shaped steel with fore shaft, there is straight plate shape in its cross section, flute profile and Z shape etc., there are full range of sizes and interlocking form, common are and draw Ademilson formula, clarke Wan Nashi etc.The advantage of steel sheet-pile cofferdam is: intensity is high, easily squeezes into hard soil layer; Water resistance is good, can at dark subaqueous work; The cofferdam of various profile can be formed on demand, and can repeatedly use.Therefore, it of many uses, but, in steel sheet pile cofferdam construction process, due to problems such as the geology in place, engineering place, the hydrology and steel sheet pile self materials, the problem such as injection difficulty, drilling depth can be caused slower, thus had a strong impact on development of projects.
[utility model content]
The purpose of this utility model is: for defect and the deficiency of prior art, provide a kind of underwater support table foundation ditch leading truck, this leading truck ensure that carrying out smoothly of cushion cap foundation pit construction, the construction quality of cushion cap foundation ditch is improved greatly, the efficiency of construction of effective raising steel sheet-pile cofferdam, reduce cost of labor, contribute to the utilization and extention of enterprise.
For achieving the above object, the technical solution adopted in the utility model is:
A kind of underwater support table foundation ditch leading truck, comprise outer leading truck and interior leading truck, outer leading truck is made up of inside and outside two flange beam stands, is provided with lead in the gap of interior flange beam stand; Interior leading truck comprises i iron waling, direction peg and supporting steel pipe, wherein i iron waling distributes along the outer of cushion cap, after direction peg injection completes, in direction peg side, guide pile bracket is installed, to support interior leading truck, guide pile bracket is weldingly fixed on direction peg sidewall, internally leading truck is accurately located simultaneously, when guide pile bracket is installed, guide pile bracket end face absolute altitude is controlled with level gauge, to ensure that each bracket carries out spacing with stop in same level, the accurate installation site of leading truck in location on the guide pile bracket, installs interior leading truck with crane.
After adopting said method, the utility model beneficial effect is: this leading truck ensure that carrying out smoothly of cushion cap foundation pit construction, and the construction quality of cushion cap foundation ditch is improved greatly, the effective efficiency of construction improving steel sheet-pile cofferdam, reduce cost of labor, contribute to the utilization and extention of enterprise.
[accompanying drawing explanation]
Accompanying drawing described herein is used to provide to further understanding of the present utility model, forms a application's part, but does not form improper restriction of the present utility model, in the accompanying drawings:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is pile cap steel sheet pile cofferdam sectional schematic diagram of the present utility model.
In figure: 1. i iron waling; 2. guide pile bracket; 3. stop; 4. supporting steel pipe; 5. direction peg; 6. cushion cap; 7. lead; 8. outer flange beam stand; 9. outer leading truck; 10. leading truck in; Flange beam stand in 11.; 12. sandstone bed courses; 13. bottom concretes; 14. first inner supports; 15 second inner supports; 16. the 3rd road inner supports.
[detailed description of the invention]
The utility model is described in detail, illustrative examples wherein and illustrate and be only used for explaining the utility model below in conjunction with accompanying drawing and specific embodiment, but not as to restriction of the present utility model.
As shown in Figure 1-2, a kind of underwater support table foundation ditch leading truck, comprises outer leading truck 9 and interior leading truck 10, and outer leading truck 9 is made up of inside and outside two flange beam stands, is provided with lead 7 in the gap of interior flange beam stand 11, interior leading truck 10 comprises i iron waling 1, direction peg 5 and supporting steel pipe 4, wherein i iron waling 1 distributes along the outer of cushion cap 6, after direction peg 5 injection completes, in direction peg 5 side, guide pile bracket 2 is installed, to support interior leading truck 10, guide pile bracket 2 is weldingly fixed on direction peg 5 sidewall, internally leading truck 10 is accurately located simultaneously, when guide pile bracket 2 is installed, guide pile bracket 2 end face absolute altitude is controlled with level gauge, to ensure that each bracket also carries out spacing with stop 3 in same level, the installation site of leading truck 10 in guide pile bracket 2 is accurately located, leading truck 10 in installing with crane.
A cofferdam construction method for supporting for underwater support table foundation ditch leading truck, comprises the following steps:
(1), desilting: become riverbed absolute altitude in latticed measurement cofferdam with plummet, and draw absolute altitude schematic diagram in riverbed in cofferdam, then carry out desilting work immediately, after adopting slush pump to carry out first time removing mud to regulation absolute altitude, then adopt the instrument such as wire brush, giant to carry out cleaning direction peg inside edge and supporting steel pipe periphery mud, after cleaning out, depending on substrate situation, if also have mud, then carry out packing sedimentation by throwing stones, after completing, carry out secondary desilting;
(2), backfill: desilting absolute altitude is below cushion cap bottom surface absolute altitude 2m, if bottom surface, riverbed absolute altitude is lower than cushion cap bottom surface more than absolute altitude 2m, then to backfill, adopt sand material to carry out being backfilled to cushion cap bottom surface absolute altitude 2m, ensure that bottom surface absolute altitude is smooth, ensures that bottom concrete is no more than 2m simultaneously;
(3), cushion cap back cover: cushion cap back cover adopts conduit to carry out underwater concrete back cover, at lead cofferdam top layout concreting point, direction across bridge lays 3 row's conduits, often 2 conduits are established in arrangement, for pouring underwater concrete, progressively upstream recycle, pouring squence " top hydraulic pressure, against the current envelope " from downstream upstream, building thickness is 2m, cushion cap bottom concrete 550.5m3;
(4), draw water and inner support install: before drawing water, Xian Jiang tri-road inner support all puts into cushion cap cofferdam, with wire rope, Chain block hangs, and is placed on its corresponding horizontal level, first inner support is on the water surface, on direction peg, install guide pile bracket during installation, be used for supporting inner support, simultaneously, by inner support and guide pile bracket consolidation, other hold out against the gap between inner support and direction peg with timber wedge; When bottom concrete intensity reaches 90%, start to draw water, when water level being extracted into second, the 3rd inner support position, road, and fashionable dress second, the 3rd road inner support, mounting method supports identical with installation first, after installing the 3rd road support, draws water to bottom concrete end face;
(5), cleaning leveling bottom cushion cap: draw water to bottom concrete end face, cut off drilled pile steel pile casting, cleaning pile crown, and nothing breakage inspection is carried out to pile foundation, high according to actual measurement stake top mark, the above 5cm of design elevation at the bottom of the concrete to cushion cap of stake top is abolished with artificial or hammer drill, if cleaning is to stake top mark height, stake top still have concrete laitance or concrete loose, should continue to cut pile crown downwards, until expose evenly qualified concrete, and at the stake topmast mould of super cutter, supplementary irrigation is carried out with the concrete of high one-level label, complete the construction of whole stake, cleaning, rinse the foreign material on bottom concrete surface, leveling cushion cap bottom surface,
(6), construction survey setting-out: with total powerstation location cushion cap axis and the position of six angle points, with the absolute altitude of level gauge or each angle point of total powerstation measuring point, leveling cleaning whole of cushion cap, ensures cushion cap position and each spot size;
(7), colligation cushion cap reinforcing bar: in strict accordance with the requirement of drawing, colligation cushion cap reinforcing bar, the kind of strict control cushion cap reinforcing bar, quantity, rebar spacing, same section bar splice quantity, bar connecting quality, during reinforcing bar employing overlap welding, notice whether reinforcing bar connects with one heart, the turgor of fusion length, weld seam, welding slag do not clean out, reinforcing bar binding is firm, is quincunx spot welding during reinforcing bar binding;
(8), leading truck is installed: interior leading truck is installed, after direction peg injection completes, install guide pile bracket in direction peg side, to support interior leading truck, guide pile bracket is weldingly fixed on direction peg sidewall, internally leading truck is accurately located simultaneously, when guide pile bracket is installed, control guide pile bracket end face absolute altitude with level gauge, to ensure that each bracket carries out spacing with stop in same level, the installation site of leading truck in guide pile bracket is accurately located, leading truck in installing with crane; Outer leading truck is installed, and outer leading truck is made up of inside and outside two flange beam stands, and adopt I36a i iron to make, inside and outside two flange beam stand frame length 4m, outer leading truck is temporarily fixed in operation platform distribution beam, to sling installation with crane;
(9), formwork: cushion cap template adopts bulk punching block on-site consolidation, steel pipe is made rib and is fixedly made, perpendicular rib and cross rib spacing are wanted to carry out intensity and rigidity checking, Screw arbor with nut at both-ends is strained, after model sheetinstallat completes, the plan-position of measurement module, accurate to ensure cushion cap position, meanwhile, pier shaft embedded bar is located;
(10), concreting: adopt horizontal slice to build when building, building thickness must not be greater than 30cm, and for making levels become overall, avoid the formation of seam, during cast upper strata concrete, poker vibrator should stretch into lower floor 5 ~ 10cm;
(11), form removable and backfill: when concrete compressive strength reaches more than 2.5MPa, when temperature difference between inside and outside concrete is not more than 25 DEG C, start stripping, follow during dismounting first to prop up and tear open afterwards, rear order of first tearing open, does not affect concrete presentation quality in demolishing process, covers health simultaneously, between steel sheet-pile cofferdam and cushion cap, backfill silt to cushion cap end face, adopt depositing in water method to make silt closely knit with water filling;
(12), remove inner support: backfill between cushion cap and steel sheet-pile cofferdam closely knit after, remove the 3rd, second inner support, then pier construction is carried out, after pier construction goes out the water surface, water filling in cofferdam, make water surface elevation inside and outside cofferdam consistent, then remove first inner support, join with crane hammer of extricating oneself from a predicament and brace oneself up to action and remove steel sheet-pile cofferdam.
The above is only better embodiment of the present utility model, therefore all equivalences done according to structure, feature and the principle described in the utility model patent claim change or modify, and are included in the utility model patent claim.

Claims (1)

1. a underwater support table foundation ditch leading truck, is characterized in that: comprise outer leading truck and interior leading truck, and outer leading truck is made up of inside and outside two flange beam stands, is provided with lead in the gap of interior flange beam stand; Interior leading truck comprises i iron waling, direction peg and supporting steel pipe, wherein i iron waling distributes along the outer of cushion cap, after direction peg injection completes, in direction peg side, guide pile bracket is installed, to support interior leading truck, guide pile bracket is weldingly fixed on direction peg sidewall, internally leading truck is accurately located simultaneously, when guide pile bracket is installed, guide pile bracket end face absolute altitude is controlled with level gauge, to ensure that each bracket carries out spacing with stop in same level, the accurate installation site of leading truck in location on the guide pile bracket, installs interior leading truck with crane.
CN201520436225.1U 2015-06-24 2015-06-24 A kind of underwater support table foundation ditch leading truck Expired - Fee Related CN204728333U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520436225.1U CN204728333U (en) 2015-06-24 2015-06-24 A kind of underwater support table foundation ditch leading truck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520436225.1U CN204728333U (en) 2015-06-24 2015-06-24 A kind of underwater support table foundation ditch leading truck

Publications (1)

Publication Number Publication Date
CN204728333U true CN204728333U (en) 2015-10-28

Family

ID=54386695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520436225.1U Expired - Fee Related CN204728333U (en) 2015-06-24 2015-06-24 A kind of underwater support table foundation ditch leading truck

Country Status (1)

Country Link
CN (1) CN204728333U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895083A (en) * 2015-06-24 2015-09-09 江苏省建筑科学研究院有限公司 Underwater pile-cap foundation pit guide frame and cofferdam support construction method thereof
CN111411630A (en) * 2020-03-31 2020-07-14 上海二十冶建设有限公司 Supporting method for local deepened area in deep foundation pit
CN111411638A (en) * 2020-04-29 2020-07-14 石家庄铁道大学 Steel sheet pile cofferdam and construction method thereof
CN111733900A (en) * 2020-06-24 2020-10-02 四川冶金建筑工程质量检测有限公司 High strain detection method for prestressed foundation pile

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895083A (en) * 2015-06-24 2015-09-09 江苏省建筑科学研究院有限公司 Underwater pile-cap foundation pit guide frame and cofferdam support construction method thereof
CN111411630A (en) * 2020-03-31 2020-07-14 上海二十冶建设有限公司 Supporting method for local deepened area in deep foundation pit
CN111411638A (en) * 2020-04-29 2020-07-14 石家庄铁道大学 Steel sheet pile cofferdam and construction method thereof
CN111411638B (en) * 2020-04-29 2024-04-26 石家庄铁道大学 Steel sheet pile cofferdam and construction method thereof
CN111733900A (en) * 2020-06-24 2020-10-02 四川冶金建筑工程质量检测有限公司 High strain detection method for prestressed foundation pile
CN111733900B (en) * 2020-06-24 2021-11-30 四川冶金建筑工程质量检测有限公司 High strain detection method for prestressed foundation pile

Similar Documents

Publication Publication Date Title
CN104895083A (en) Underwater pile-cap foundation pit guide frame and cofferdam support construction method thereof
CN100497841C (en) Supporting leg type underground continuous wall construction method
CN103205978B (en) High-permeability zone under-water-level elevator foundation pit open caisson moulding bed construction method
CN101672041B (en) Top-down construction method of large underground structure outer wall
CN104074199B (en) Underwater bearing platform construction method
CN105951711A (en) Enclosing construction method of underground continuous wall of seashore power station
CN204728333U (en) A kind of underwater support table foundation ditch leading truck
CN105350526B (en) Method for setting up steel platform
CN110939303B (en) Semi-reverse construction method of cyclone pool
CN106088127A (en) Open caisson construction method
CN105133627A (en) Construction method for single-wall steel sheet pile cofferdam in running water state
CN106930319A (en) A kind of high slope framed revetment and its construction method
CN102430277B (en) Coarse grid sunk well for physically processing waste water and construction method thereof
CN109403340A (en) A kind of construction method using open caisson as foundation pit enclosure structure
CN108678000A (en) A kind of U-shaped retaining structure of roadbed Xia Chuan highways and its construction method
CN110258582B (en) Inclined support foundation pit supporting structure based on steel pipe pile and Lassen steel plate and construction method
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN100516378C (en) Method for supporting and protecting building foundation pit by employing transverse-diaphragm prestressing concrete pipe pile
CN112878332A (en) Basement elevator shaft sump construction structure and method thereof
CN208088288U (en) The big areas grain size shiver stone Gao Tian pile foundation fast pore-creating structure
CN110042842A (en) A kind of open cut construction method of deep foundation ditch for wearing river
CN109706952A (en) Large-scale well-sinking construction method
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN105332382B (en) Adjacent river foundation ditch builds island cofferdam clay water stop construction method
CN110331715A (en) A kind of construction method of underground continuous wall in urban construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028

Termination date: 20160624