Prior art keywords
test
transmission line
transition resistance
resistance
overhead transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520429505.XU
Other languages
Chinese (zh)
Inventor
田庆生
梁仕斌
杜景琦
王磊
李贻博
洪波
昌明
刘柱揆
董涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Electric Power Test and Research Institute Group Co Ltd
Original Assignee
Yunnan Electric Power Test and Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Electric Power Test and Research Institute Group Co Ltd filed Critical Yunnan Electric Power Test and Research Institute Group Co Ltd
Priority to CN201520429505.XU priority Critical patent/CN204719175U/en
Application granted granted Critical
Publication of CN204719175U publication Critical patent/CN204719175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

A kind of for 10kV overhead transmission line artificial earthing Test to Failure device, comprise test master switch facility, ground connection transition resistance device, data recording equipment; Test master switch facility is made up of isolating switch, isolation switch and 10kV cable; Ground connection transition resistance device is sequentially connected to form by ground stud, transition resistor, transition resistance control box; Data recording equipment comprises the oscillograph that 10kV voltage transformer (VT), current transformer and sampling rate are not less than 1MS/s.The utility model is by artificially manufacturing a singlephase earth fault in short-term in 10kV overhead transmission line testing site, the Fault characteristic parameters such as ground connection time, transition resistance are set to the correct operation situation checking the equipment such as fault detector, line selection device for low current when singlephase earth fault occurs, safe, reliable, applied widely.

Description

A kind of 10kV overhead transmission line artificial earthing Test to Failure device
Technical field
The utility model relates to 10kV overhead transmission line artificial singlephase earth fault test unit technical field of structures, particularly relates to a kind of device for detecting the equipment such as distribution network failure indicator, line selection device for low current.
Background technology
What require along with distribution network reliability improves constantly, and Distribution Network Equipment more and more causes the attention of people.Distribution Network Equipment producer is numerous, various in style, and a lot of equipment does not all have good checkout equipment and test method all the time.Many times in order to meet the work requirements of the links such as product control, network access testing or the inspection of incoming merchandise, need to carry out the test of artificial singlephase earth fault at 10kV overhead transmission line; Also need to carry out validity and the action correctness that its principle is verified in on-the-spot artificial singlephase earth fault test in the R&D process of a lot of distribution new equipment in addition.
The test of 10kV overhead transmission line artificial singlephase earth fault is the regular test carried out of power distribution network, common test method is near earth point, bury 1 ground stud underground, it connects one end of ground wire, other one end of ground wire is connected on insulating bar, ground wire is overlapped on 10kV aerial condutor by the hand-held insulating bar of operating personnel, thus produces artificial singlephase earth fault.But there is more problem in existing test method: be first bring larger potential safety hazard to test operation personnel and testing site surrounding people; Next is that test operation is inconvenient, and the external environment influence such as by wind are comparatively large, have the risk causing phase fault; Be finally to control parameter, as ground connection transition resistance resistance size, ground connection time length all can not accurately obtain, and the parameters such as line load situation, fault current size also cannot obtain, and causes the analysis after testing to lack enough data supportings.
Summary of the invention
The deficiency that the utility model exists for prior art, a kind of device for the artificial singlephase earth fault test of 10kV overhead transmission line is provided, to improve security, the test behaviour operability of test operation personnel, reduce empirical risk, effective acquisition test parameters, and for some provide a kind of test thinking without improving detection means distribution net equipment.
The technical solution of the utility model is as follows:
For the artificial singlephase earth fault test unit of 10kV overhead transmission line, its structure comprises: test master switch facility, ground connection transition resistance device, data recording equipment;
Test master switch facility is made up of isolating switch, isolation switch and 10kV cable; Isolating switch is the 10kV isolating switch of band distant control function; Isolation switch is the obvious disconnection contact point between isolating switch and 10kV overhead transmission line;
Ground connection transition resistance device is sequentially connected to form by ground stud, transition resistor, transition resistance control box, and wherein stake resistance is less than 10 Ω ground stud 2; Transition resistor is 10kV stake resistance or resistance box, and resistance value scope is that 0 Ω is to 1000 Ω; Transition resistance control box, with timer, is responsible for the ground connection time controlling transition resistance;
Data recording equipment comprises the oscillograph that 10kV voltage transformer (VT), current transformer and sampling rate are not less than 1MS/s.
Compared with prior art, the utility model improves security, the test behaviour operability of test operation personnel, reduces empirical risk, effectively can obtain test parameters, and can be some and provide a kind of test thinking without improving detection means distribution net equipment.The utility model is applied widely, is a kind of safe, reliable, practical 10kV overhead transmission line singlephase earth fault test unit.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.Wherein: 1. ground stud; 2. cabtyre cable; 3. 10kV overhead transmission line; 4. shaft tower.
Fig. 2 is the utility model operating process block diagram.
Embodiment
Below in conjunction with real accompanying drawing, the utility model is described in further detail.
See Fig. 1, for the artificial singlephase earth fault test unit of 10kV overhead transmission line, its structure comprises test master switch facility, ground connection transition resistance device, data recording equipment;
Test master switch facility is made up of isolating switch, isolation switch and 10kV cable; Isolating switch is the 10kV isolating switch of band distant control function; Isolation switch is the obvious disconnection contact point between isolating switch and 10kV overhead transmission line;
Ground connection transition resistance device is sequentially connected to form by ground stud, transition resistor, transition resistance control box, and wherein ground stud stake resistance is less than 10 Ω; Transition resistor is 10kV stake resistance or resistance box, and resistance value scope is that 0 Ω is to 1000 Ω; Transition resistance control box, with timer, is responsible for the ground connection time controlling transition resistance;
Data recording equipment comprises the oscillograph that 10kV voltage transformer (VT), current transformer and sampling rate are not less than 1MS/s.
Test specimen is arranged on the correct position of 10kV overhead transmission line as required, and test specimen is the equipment as a class such as distribution network failure indicator, line selection device for low current to be detected.
Using method of the present utility model is as follows:
The pilot system mode of connection is: the earth test point of 10kV overhead transmission line connects with isolation switch upper end cabtyre cable, isolation switch to be fixed near testing site on shaft tower, isolation switch lower end connects isolating switch inlet wire, isolating switch is fixed on the test bracket near testing site, controlled to cut-off by operating mechanism, breaker outgoing line connects one end of test transition resistance control box, the other end of transition resistance control box connects with transition resistance inlet wire, transition resistance outlet and ground stud positive connection, ground stud distance and isolating switch lay distance location more than 8 meters, a ground stud is separately buried for site test equipment ground apart from this ground stud 8 meters.On-the-spot 10kV voltage transformer (VT) is connected in parallel on breaker outgoing line end, current transformer is connected between transition resistance and ground stud, voltage transformer (VT) summation current transformer secondary side is connected to oscillograph input channel, record ripple in transformer station and access voltage terminal, current terminal, residual voltage terminal and zero-sequence current terminal in tested line-breaker switch cubicle, test specimen is arranged on the correct position of 10kV overhead transmission line as required.
Be illustrated in figure 1 the structure for 10kV overhead transmission line artificial earthing Test to Failure method detection failure indicator motion situation instantiation, comprise: isolated neutral system, arc suppression coil over-compensation two kinds can be divided in the selected described test circuit method of operation.
Described earth fault transition resistance is combined by the resistance box of 4 200 Ω and realizes, and can be set to 0 Ω, 50 Ω, 100 Ω, 200 Ω, 400 Ω and 800 Ω according to mode of connection different resistance values.
Under above-mentioned Fig. 1 is used for 10kV overhead transmission line artificial earthing Test to Failure device specific embodiment, be illustrated in figure 2 the FB(flow block) for 10kV overhead transmission line artificial earthing Test to Failure device specific embodiment.The step of specific embodiment is as follows:
The first step: test prepares, and carries out test condition preparation and carry out wiring according to claims 1, carries out protection fixed value adjusting, relevant device switching, handles the preliminary works such as work ticket in Substation Station;
Second step: the measurement instrument accesses such as oscillograph, transformer station and on-the-spot two positions of ground connection are divided in access place.In transformer station, record ripple access voltage terminal, current terminal, residual voltage terminal and zero-sequence current terminal in tested line-breaker switch cubicle; On-the-spot record ripple access trial voltage mutual inductor Secondary Winding side, test 10kV breaker control tank current protective loop;
3rd step: carry out the operation of relevant device switching by testing requirements in transformer station, as by testing requirements equipment arc suppression coil compensation mode, drop into or exit arc suppression coil, drop into or exit line selection device for low current etc.;
4th step: according to test required resistance value access earth test transition resistance before each test, isolation switch is in released state;
5th step: first closed after on-test isolation switch, the controller or transition resistance control box of isolating switch arrange the ground connection time, in standing and two, scene oscillographs start to start, and guarantee to close after testing crew is in home isolating switch, earth point is in singlephase earth fault state;
6th step: after the ground connection time set by arrival, transition resistance disconnects with ground stud by ground connection transition resistance control box or breaker controller automatically;
7th step: check whether the data of oscillograph record in on-the-spot and station meet the demands, and meet the demands, cut-off breaker also pulls open isolation switch, waits for lower battery of tests; Oscillograph data do not meet the demands and then repeat step 5 to step 7;
8th step: reset test parameters, repeats step 3 to step 7;
9th step: restoring scene, removes testing equipment and safety practice of doing after test, transformer station and circuit recover the front state of test.
The cooperation preparation of transformer station and operation element comprise:
In test next stop, personnel carefully check circuit definite value; and carry out the safety precautions preventing the accidents such as line tripping; every safety practice all should be carried out by regulation each operation is forward and backward, and when circuit testing crew confirms, can operate after scheduling grant.In process of the test, in station, operation comprises and carries out throwing, cutting the equipment such as fault detector signal source, arc suppression coil, line selection device for low current according to testing requirements.
Process of the test comprise carry out wiring according to accompanying drawing mode, check confirm that experiment condition meets the demands, selects suitable test transition resistance, arranges the earth fault time, the isolation switch that closes, start the recorder such as oscillograph, isolating switch is closed in remote control, the earth fault time disconnects automatically to isolating switch, examine test effect and record case, errorless rear disconnection isolation switch enters and tests preparation next time, tests then off-test without other.
The foregoing is only a kind of embodiment of the present utility model, but be not limitation of the utility model.For the ordinary person of the art in the scope that the utility model discloses, the distortion carried out and improvement, all should belong to protection domain of the present utility model.

Claims (1)

1. for a 10kV overhead transmission line artificial earthing Test to Failure device, it is characterized in that, described test unit comprises test master switch facility, ground connection transition resistance device, data recording equipment;
Test master switch facility is made up of isolating switch, isolation switch and 10kV cable; Isolating switch is the 10kV isolating switch of band distant control function; Isolation switch is the obvious disconnection contact point between isolating switch and 10kV overhead transmission line;
Ground connection transition resistance device is sequentially connected to form by ground stud, transition resistor, transition resistance control box, and wherein ground stud stake resistance is less than 10 Ω; Transition resistor is 10kV stake resistance or resistance box, and resistance value scope is that 0 Ω is to 1000 Ω; Transition resistance control box, with timer, is responsible for the ground connection time controlling transition resistance;
Data recording equipment comprises the oscillograph that 10kV voltage transformer (VT), current transformer and sampling rate are not less than 1MS/s.
CN201520429505.XU 2015-06-21 2015-06-21 A kind of 10kV overhead transmission line artificial earthing Test to Failure device Active CN204719175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520429505.XU CN204719175U (en) 2015-06-21 2015-06-21 A kind of 10kV overhead transmission line artificial earthing Test to Failure device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520429505.XU CN204719175U (en) 2015-06-21 2015-06-21 A kind of 10kV overhead transmission line artificial earthing Test to Failure device

Publications (1)

Publication Number Publication Date
CN204719175U true CN204719175U (en) 2015-10-21

Family

ID=54318163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520429505.XU Active CN204719175U (en) 2015-06-21 2015-06-21 A kind of 10kV overhead transmission line artificial earthing Test to Failure device

Country Status (1)

Country Link
CN (1) CN204719175U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104931845A (en) * 2015-06-21 2015-09-23 云南电力试验研究院(集团)有限公司 10kV overhead line artificial grounding fault testing device and application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104931845A (en) * 2015-06-21 2015-09-23 云南电力试验研究院(集团)有限公司 10kV overhead line artificial grounding fault testing device and application method

Similar Documents

Publication Publication Date Title
CN104198832B (en) A kind of high pressure transformer and distribution power station Integrated Checkout test method
CN104076243A (en) Method for detection and indication of single-phase ground faults of small current grounding power distribution network and device
CN103852697B (en) Cable partial discharge detection device
CN104283307B (en) Integrated high-pressure switch is joined by intelligence battalion
CN105743072A (en) High-voltage electric circuit protection system for electric motor train unit
CN105573283A (en) Transformer station equipment function association database establishing method and event association information group filtering method
CN104931845A (en) 10kV overhead line artificial grounding fault testing device and application method
CN107086537B (en) Prevent the disconnecting device and cutting-off method of the debugging primary equipment electrification of substation's relay protection
CN202196132U (en) Dynamic simulation test system of power grid region stable control system
CN103941160B (en) Power distribution network loop closing detection device and method
CN204256059U (en) A kind of 10kV shunt reactor switching service test system
CN204719175U (en) A kind of 10kV overhead transmission line artificial earthing Test to Failure device
CN206379635U (en) A kind of 10kV overhead transmission lines short circuit and earth fault experiment high-tension switch cabinet
CN103439550B (en) Can the device against charge evasion of charged installation and installation method
CN102565614B (en) Alternating voltage loop test method
Rosa et al. A systemic approach for assessment of advanced distribution automation functionalities
CN203054143U (en) Indoor transformer station busbar voltage abnormity alarm indicating device
CN216211624U (en) Real standard system of power transformation and distribution operation and maintenance integration
CN206162101U (en) Digifax hybrid simulation of HVDC system platform based on ADPSS
CN113640621A (en) Full-automatic detection method and detection system for low-current ground fault line
CN204925277U (en) Relay protection working car
CN204495930U (en) A kind of intelligent type automatic electrical test system
CN104101765B (en) Multi-way intelligence leaks guarantor's uninterrupted power test device online
CN102122140A (en) Demarcation switch system
CN203950010U (en) Cable local discharge detection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant