CN204715638U - A kind of roof covering water-proof structure - Google Patents

A kind of roof covering water-proof structure Download PDF

Info

Publication number
CN204715638U
CN204715638U CN201520205821.9U CN201520205821U CN204715638U CN 204715638 U CN204715638 U CN 204715638U CN 201520205821 U CN201520205821 U CN 201520205821U CN 204715638 U CN204715638 U CN 204715638U
Authority
CN
China
Prior art keywords
waterproofing course
layer
aqueduct
proof structure
roof covering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520205821.9U
Other languages
Chinese (zh)
Inventor
晋建江
唐杰林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Tbea Real Estate Development Co Ltd
Original Assignee
Xinjiang Tbea Real Estate Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Tbea Real Estate Development Co Ltd filed Critical Xinjiang Tbea Real Estate Development Co Ltd
Priority to CN201520205821.9U priority Critical patent/CN204715638U/en
Application granted granted Critical
Publication of CN204715638U publication Critical patent/CN204715638U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a kind of roof covering water-proof structure, comprise successively from inside to outside: insulation layer, insulation sloping layer, leveling layer and the second waterproofing course, also comprise the first waterproofing course, the first waterproofing course is positioned at the inner side of insulation layer, and is adhered on the external surface of roof structure body; By arranging the first waterproofing course between the external surface and insulation layer of roof structure body, and retain outermost second waterproofing course, even if outermost second waterproofing course is aging, because insulation layer, insulation sloping layer, leveling layer are positioned at the outside of the first waterproofing course, first waterproofing course can not be subject to sunlight, the erosion of sleet and aging, thus waterproof effect is guaranteed, increase the application life of waterproof construction.

Description

A kind of roof covering water-proof structure
Technical field
The utility model relates to building waterproofing technique field, particularly relates to a kind of roof covering water-proof structure.
Background technology
Due to building roofing be directly subject to solar radiation, sleet corrodes, easily there is crackle, leak and the problem such as channeling water, if do not carry out periodic maintenance, often make roof leakage problem intensification, bring very large difficulty of construction to maintenance.
Existing roof waterproof scheme lays waterproof construction at the external surface of roof structure body, and this waterproof construction is followed successively by from bottom to top: the waterproofing course of insulation layer, insulation sloping layer, leveling layer and bilayer, wherein waterproofing course adopts double-deck hot melt fissure of displacement paving to be formed.
Waterproofing course plays a very important role in waterproof construction, and waterproofing course is arranged on the outermost layer of waterproof construction, summer is exposed to the sun for a long time in the sun, and winter corrodes by freezing and sleet, waterproofing course very easily occurs aging, and waterproof effect is poor, reduction in the application life of waterproof construction.Once roofing infiltration, the vapour barrier of moisture in inside, house forms condensed water, on the one hand, infiltration and condensed water are not easily discharged, on the other hand, owing to having gap between waterproofing course and leveling layer in house, infiltration and condensed water can in this gap play, occur to judge leaking area in time when leaking, bring very large difficulty to maintenance, increase maintenance cost.
Therefore, a kind of roof covering water-proof structure is needed badly to solve the problems of the technologies described above.
Utility model content
The utility model, for above shortcomings in prior art, provides a kind of roof covering water-proof structure, in order to solve waterproof effect difference, to determine the problem that leaking area difficulty, infiltration and condensed water cannot be discharged in time.
The utility model, for solving the problems of the technologies described above, adopts following technical scheme:
The utility model provides a kind of roof covering water-proof structure, comprise successively from inside to outside: insulation layer, insulation sloping layer, leveling layer and the second waterproofing course, also comprise the first waterproofing course, the first waterproofing course is positioned at the inner side of insulation layer, and is adhered on the external surface of roof structure body.
Preferably, described first waterproofing course adopts cold bonding agent bonding with the external surface of roof structure body.
Preferably, described cold bonding agent is uncured rubber asphalt.
Preferably, described first waterproofing course is provided with the opening run through;
Described roof covering water-proof structure also comprises the aqueduct for water conservancy diversion infiltration and condensed water, and aqueduct runs through described roof structure body, and is connected with the stack in house with the opening of the first waterproofing course respectively.
Preferably, described aqueduct comprises interconnective first aqueduct and the second aqueduct, and the first aqueduct is vertically arranged, and connects with the opening of the first waterproofing course, the downward-sloping setting of the second aqueduct, and is connected with the stack in house.
Further, described roof covering water-proof structure also comprises the captation that current can be allowed to pass through, and captation level covers the opening part of the first waterproofing course.
Further, described roof covering water-proof structure also comprises mortar sloping layer, and mortar sloping layer is between the external surface and the first waterproofing course of described roof structure body, and the first waterproofing course is adhered on mortar sloping layer;
At the opening part of the first waterproofing course, mortar sloping layer is formed with slope, and slope is towards the mouth of pipe of aqueduct.
Preferably, described ramp slope is 3 ‰-5 ‰.
Preferably, described insulation layer comprises two-layer warming plate, the upper and lower fissure of displacement paving of two-layer warming plate.
The utility model has following beneficial effect:
1, by arranging the first waterproofing course between the external surface and insulation layer of roof structure body, and retain outermost second waterproofing course, even if outermost second waterproofing course is aging, because insulation layer, insulation sloping layer, leveling layer are positioned at the outside of the first waterproofing course, first waterproofing course can not be subject to sunlight, the erosion of sleet and aging, thus waterproof effect is guaranteed, increase the application life of waterproof construction;
2, by adopting bonding first waterproofing course of cold bonding agent, gap and hollowing can not be produced between the first waterproofing course and roof structure body, like this, even if roofing seeps water, or moisture forms condensed water in inside, house, infiltration and condensed water also can not plaies back and forth, leaking area can be judged in time, reduce maintenance difficulty and cost;
3, by arranging aqueduct, utilizing aqueduct will seep water with condensate water guide to stack, can in time infiltration and condensed water be discharged from stack.
Accompanying drawing explanation
The roof covering water-proof structure schematic diagram that Fig. 1 provides for the utility model embodiment.
Marginal data:
1, insulation layer 2, insulation sloping layer 3, leveling layer
4, the second waterproofing course 5, first waterproofing course 6, roof structure body
7, aqueduct 8, stack 9, captation
10, mortar sloping layer 11, cold bonding agent 51, opening
71, the first aqueduct 72, second aqueduct
Detailed description of the invention
For making those skilled in the art understand the technical solution of the utility model better, below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Below in conjunction with Fig. 1, roof covering water-proof structure of the present utility model is described in detail.As shown in Figure 1, a kind of roof covering water-proof structure comprises from inside to outside successively: insulation layer 1, insulation sloping layer 2, leveling layer 3 and the second waterproofing course 4, also comprise the inner side that the first waterproofing course 5, first waterproofing course 5 is positioned at insulation layer 1, and be adhered on the external surface of roof structure body 6.
Between the external surface and insulation layer 1 of roof structure body 6, the first waterproofing course 5 is set, and retain outermost second waterproofing course 4, even if outermost second waterproofing course 4 is aging, due to the outside being subject to insulation layer 1, insulation sloping layer 2, leveling layer 3 are positioned at the first waterproofing course 5, first waterproofing course 5 can not be subject to sunlight, the erosion of sleet and aging, thus waterproof effect is guaranteed, increase the application life of waterproof construction.
First waterproofing course 5 can select polyester blank SBS (Styrene-Butadiene-Styrene, s-B-S) waterproof roll, and the thickness of the first waterproofing course 5 can be 3mm.
First waterproofing course 5 adopts cold bonding agent 11 bonding with the external surface of roof structure body 6, and preferably, cold bonding agent 11 can select uncured rubber asphalt.Adopt uncured rubber asphalt bonding, adhesive effect is good, can realize seamless bonding, and due to uncured rubber asphalt be non-solid shape, have self-healing property, less cut can self-heal.
The first waterproofing course 5 is covered owing to adopting the mode of cold bonding to spread, without the need to heating polyester blank SBS waterproof roll, gap and hollowing can not be produced between the first waterproofing course 5 and roof structure body 6, like this, even if roofing seeps water, or, the vapour barrier (in figure do not illustrate) of moisture in inside, house forms condensed water, infiltration and condensed water also can not plaies back and forth, therefore, it is possible to judge leaking area in time, thus reduction maintenance difficulty and cost.
Further, as shown in Figure 1, the first waterproofing course 5 is provided with the opening 51 run through.Described roof covering water-proof structure can also comprise aqueduct 7, and aqueduct 7 runs through roof structure body 6, and is connected with the stack 8 in house with the opening 51 of the first waterproofing course 5 respectively.Aqueduct 7 can by infiltration and condensate water guide to stack 8, thus will seep water in time and to discharge from stack 8 with condensed water.
Concrete, aqueduct 7 can comprise interconnective first aqueduct 71 and the second aqueduct 72, first aqueduct 71 is vertically arranged, and connects with the opening 51 of the first waterproofing course 5, the downward-sloping setting of the second aqueduct 72, and is connected with the stack 8 in house.The downward-sloping setting of second aqueduct 72 is connected with stack 8, can by infiltration and condensed water fast guiding to stack 8.
Further, described roof covering water-proof structure can also comprise the captation 9 that current can be allowed to pass through, and captation 9 level covers the opening part 51 of the first waterproofing course 5.Captation 9 can be double-edged fine-toothed comb, and level frame is located at opening 51 place of the first waterproofing course 5, infiltration and condensed water not only can be made to pass through and flow into aqueduct 7 from opening 51, can also provide support for insulation layer 1.
Further, described roof covering water-proof structure can also comprise mortar sloping layer 10, and mortar sloping layer 10 is between the external surface and the first waterproofing course 5 of roof structure body 6, and the first waterproofing course 5 is adhered on mortar sloping layer 10.At opening 51 place of the first waterproofing course 5, mortar sloping layer 10 is formed with slope, and slope is towards the mouth of pipe of aqueduct 7.
As shown in Figure 1, mortar sloping layer 10 is on the formation slope, mouth of pipe place of aqueduct 7, and captation 9 is erected on the slope of mortar sloping layer 10, and is formed with space with the mouth of pipe of aqueduct 7.
Preferably, the ramp slope of mortar sloping layer 10 can be 3 ‰-5 ‰.
Preferably, insulation layer 1 can comprise two-layer warming plate (not illustrating in figure), the upper and lower fissure of displacement paving of two-layer warming plate.Warming plate is made up of heat insulating material, preferably, can select EPS sheet material (expandable polystyrene plate).Two-layer warming plate overlaps up and down at seam crossing, makes between warming plate seamless, better heat preservation, more energy-conservation.
Insulation sloping layer 2 can adopt light-duty granule insulating material paving to cover formation, such as, and haydite or perlite grain.Insulation sloping layer 2 forms the gradient to drain gully in roofing (not illustrating in figure) direction, and this gradient is more than or equal to 2%, and in roofing, drain gully refers to the mouth of pipe of rain pipe, does not illustrate in FIG.
Leveling layer 3 is spread to cover by cement mortar or pea gravel concreten and is formed, and thickness can be 30mm, and all right square lattice on leveling layer 3, to strengthen crack resistance.
Second waterproofing course 4 can select the polyester blank SBS waterproof roll of surface band sand, to improve skidproof effect.
In order to clearly demonstrate the technical solution of the utility model, below in conjunction with Fig. 1, the manufacturing process of roof covering water-proof structure of the present utility model is elaborated.
First, press polish of being wiped one's face on inside parapet and roof forms roof structure body 6, and hollowing, skin effect phenomenon, must not appear in water seasoning more than 3 days.In the process, need to build aqueduct 7, be connected by aqueduct 7 and run through roof structure body 6 with stack 8, the diameter of aqueduct 7 is 30mm.
Then, the construction of roof covering water-proof structure is completed according to following steps:
Step 1, first the rubbish on the external surface of roof structure body 6 and floating dust are cleaned out, and use 1:2.5 cement mortar, with the gradient slope aspect aqueduct 7 of 5 ‰, form mortar sloping layer 10 at the upper surface of roof structure body 6, the thickness of mortar sloping layer 10 thinnest part is 10mm.
Step 2, adopts uncured rubber asphalt as cold bonding agent, completely sticks on mortar sloping layer 10 by polyester blank SBS waterproof roll thick for 3mm, to form the first waterproofing course 5.First waterproofing course 5 is confirmed whether to meet designing requirement after completing, through 48 hours closed-water tests, if it is water-tight not seep water, qualified, otherwise should do over again to qualified.
Step 3, is divided into two-layer by the warming plate of former design thickness (150mm), and the thickness of every layer of warming plate is 75mm, the upper and lower fissure of displacement paving of two-layer warming plate on the first waterproofing course 5, to form insulation layer 1.
Step 4, adopt haydite or perlite grain, in roofing, drain gully looks for slope 2.5%, forms insulation sloping layer 2.
Step 5, adopt 1:3 cement mortar or C20 pea gravel concreten to form leveling layer 3, thickness is 30mm, and according to the square lattice of 6mX6m.In order to crackle preventing, water seasoning more than 3 days, to make leveling layer 3 stiff.
Step 6, completely sticks on leveling layer 3 with uncured rubber asphalt by the polyester blank SBS waterproof roll of surface band sand, to form the second waterproofing course 4.Second waterproofing course 4 also can be obtained by the mode of the polyester blank SBS waterproof roll of hot melt surfaces band sand.Through closed-water test or water pouring test after 48 hours, no seepage and no leakage is qualified.
Be understandable that, the illustrative embodiments that above embodiment is only used to principle of the present utility model is described and adopts, but the utility model is not limited thereto.For those skilled in the art, when not departing from spirit of the present utility model and essence, can make various modification and improvement, these modification and improvement are also considered as protection domain of the present utility model.

Claims (9)

1. a roof covering water-proof structure, comprise successively from inside to outside: insulation layer, insulation sloping layer, leveling layer and the second waterproofing course, is characterized in that, also comprise the first waterproofing course, first waterproofing course is positioned at the inner side of insulation layer, and is adhered on the external surface of roof structure body.
2. roof covering water-proof structure as claimed in claim 1, it is characterized in that, described first waterproofing course adopts cold bonding agent bonding with the external surface of roof structure body.
3. roof covering water-proof structure as claimed in claim 2, it is characterized in that, described cold bonding agent is uncured rubber asphalt.
4. roof covering water-proof structure as claimed in claim 1, it is characterized in that, described first waterproofing course is provided with the opening run through;
Described roof covering water-proof structure also comprises the aqueduct for water conservancy diversion infiltration and condensed water, and aqueduct runs through described roof structure body, and is connected with the stack in house with the opening of the first waterproofing course respectively.
5. roof covering water-proof structure as claimed in claim 4, it is characterized in that, described aqueduct comprises interconnective first aqueduct and the second aqueduct, first aqueduct is vertically arranged, and connect with the opening of the first waterproofing course, the downward-sloping setting of the second aqueduct, and be connected with the stack in house.
6. roof covering water-proof structure as claimed in claim 4, it is characterized in that, also comprise the captation that current can be allowed to pass through, captation level covers the opening part of the first waterproofing course.
7. roof covering water-proof structure as claimed in claim 4, it is characterized in that, also comprise mortar sloping layer, mortar sloping layer is between the external surface and the first waterproofing course of described roof structure body, and the first waterproofing course is adhered on mortar sloping layer;
At the opening part of the first waterproofing course, mortar sloping layer is formed with slope, and slope is towards the mouth of pipe of aqueduct.
8. roof covering water-proof structure as claimed in claim 7, it is characterized in that, described ramp slope is 3 ‰-5 ‰.
9. the roof covering water-proof structure as described in any one of claim 1-8, is characterized in that, described insulation layer comprises two-layer warming plate, the upper and lower fissure of displacement paving of two-layer warming plate.
CN201520205821.9U 2015-04-07 2015-04-07 A kind of roof covering water-proof structure Expired - Fee Related CN204715638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520205821.9U CN204715638U (en) 2015-04-07 2015-04-07 A kind of roof covering water-proof structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520205821.9U CN204715638U (en) 2015-04-07 2015-04-07 A kind of roof covering water-proof structure

Publications (1)

Publication Number Publication Date
CN204715638U true CN204715638U (en) 2015-10-21

Family

ID=54314640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520205821.9U Expired - Fee Related CN204715638U (en) 2015-04-07 2015-04-07 A kind of roof covering water-proof structure

Country Status (1)

Country Link
CN (1) CN204715638U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544828A (en) * 2015-12-07 2016-05-04 宝业集团浙江建设产业研究院有限公司 Composite floor with multichannel waterproof performance
CN110924600A (en) * 2019-12-02 2020-03-27 韶关市第一建筑工程有限公司 Polyurethane hard foam roof waterproof and heat-insulating process
CN111395660A (en) * 2020-03-23 2020-07-10 上海焕墙建筑装饰工程有限公司 Roof waterproof heat-preservation renovating method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544828A (en) * 2015-12-07 2016-05-04 宝业集团浙江建设产业研究院有限公司 Composite floor with multichannel waterproof performance
CN110924600A (en) * 2019-12-02 2020-03-27 韶关市第一建筑工程有限公司 Polyurethane hard foam roof waterproof and heat-insulating process
CN110924600B (en) * 2019-12-02 2021-07-02 韶关市第一建筑工程有限公司 Polyurethane hard foam roof waterproof and heat-insulating process
CN111395660A (en) * 2020-03-23 2020-07-10 上海焕墙建筑装饰工程有限公司 Roof waterproof heat-preservation renovating method

Similar Documents

Publication Publication Date Title
CN104153522B (en) A kind of construction method of Sloping roof skyscraper asphalt shingle roofing water-proof system
CN201695580U (en) Inverted roof structure
CN204715638U (en) A kind of roof covering water-proof structure
CN104153521A (en) Roof waterproof structure and roof maintenance method
CN209760629U (en) Just put local seepage maintenance structure in formula roofing pipe root position
CN204252414U (en) Roof covering water-proof structure
CN208396162U (en) A kind of thermal isolation by water storage roofing
CN209837491U (en) Parapet antiseep node
CN104120837A (en) Construction method of waterproof roof
CN204475696U (en) A kind of severe cold area thermal-insulating water-proof roof
CN203603386U (en) Inversion type roof heat insulation system
CN106703302A (en) Foam-concrete roof structure
CN207739483U (en) A kind of cold area's roofing plate structure
CN207714638U (en) A kind of Novel building roof face layer
CN202483092U (en) Vapor-proof thermal insulation walkable roof
CN205224451U (en) Roofing parapet flashing protective layer structure
CN204547227U (en) Carry the waterproof thermal-insulated composite sheet material of self-adhesion of welding edge
CN104005503A (en) Plane roof modularized structure
CN212671027U (en) Leakage-proof structure for terrace roof
CN107859274A (en) A kind of waterproof skirting
CN206128463U (en) Flat roof deck heat insulative and water -proof structure
CN210828085U (en) Profiled steel sheet composite heat-insulation planting roof structure
CN207160433U (en) Roof structure applied to sponge urban construction
CN210459793U (en) Waterproof roof structure
CN203320829U (en) Waterproof heat-preservation structure for roof of long-life house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20160407

CF01 Termination of patent right due to non-payment of annual fee