CN204715561U - The replaceable steel coupling beam of span centre clean cut system - Google Patents
The replaceable steel coupling beam of span centre clean cut system Download PDFInfo
- Publication number
- CN204715561U CN204715561U CN201520345696.1U CN201520345696U CN204715561U CN 204715561 U CN204715561 U CN 204715561U CN 201520345696 U CN201520345696 U CN 201520345696U CN 204715561 U CN204715561 U CN 204715561U
- Authority
- CN
- China
- Prior art keywords
- steel
- power consumption
- span centre
- plate
- coupling beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model relates to the replaceable steel coupling beam of a kind of span centre clean cut system, belongs to building energy-dissipating and shock-absorbing technical field.Include edge of a wing force transmitting board (1), power consumption plate (2), frictional high-strength bolts (3), high strength bolt (4), steel I-beam (5), plain bolt (6), connecting angle (7), pre-buried junction plate (8).Wherein edge of a wing force transmitting board (1) is connected by high strength bolt (4) with steel I-beam (5) edge of a wing, power consumption plate (2) is connected by frictional high-strength bolts (3) with steel I-beam (5) web, and power consumption plate (2) and the processing method of steel I-beam (5) web contact surface are sandblasting (ball) raw red rust afterwards.Under external force by the force transmitting board of choosing appropriate size and power consumption sheet material, make its comparatively overall structure enter plastic state in advance, and then dissipation energy, the effect changed flexibly after there is shake.
Description
Technical field
The utility model relates to a kind of steel coupling beam, particularly has the replaceable steel coupling beam of span centre clean cut system of flexible replaceability after a kind of shake, belongs to building energy-dissipating and shock-absorbing technical field.
Background technology
As everyone knows; the energy-dissipating and shock-absorbing technology of coupling beam is mainly through setting up energy consumer or energy-consuming parts in coupling beam end or span centre; for total provides certain additional stiffness or additional damping; dissipate mainly through energy-consuming parts under external force, geological process or wind action and input the energy of building structure; to alleviate the dynamic response of building structure; thus protect the safety of agent structure better, be a kind of effectively, safety, economy and the engineering cushion technique of day by day maturation.Energy-consumption shock-absorption device mainly contains Metallic damper, friction energy dissipation device, viscoelastic damper, viscous damper, the energy dissipation behavior of first two energy consumer is main relevant with the relative displacement at energy consumer two ends, be called displacement relationship type energy consumer (or hysteresis type energy consumer), the energy dissipation behavior of latter two energy consumer is main relevant with the relative velocity at energy consumer two ends, is called velocity correlation type energy consumer.
Coupling beam is in Coupled Shear Wall except needing enough strength and stiffness and providing enough constraints to wall limb, and its another major function is exactly that the seismic energy protection wall limb dissipating a large amount of exempts from heavy damage.And existing coupling beam probably has following two kinds: the first adopts different reinforcement manner or construction measure to strengthen the energy dissipation capacity of coupling beam for traditional reinforced concrete coupling beams, such as configuration intersects secretly supports, rhombus arrangement of reinforcement, in coupling beam, establish the multiple methods such as seam, but the construction of the dark support of intersection acquires a certain degree of difficulty; The second replaces reinforced concrete coupling beams by steel coupling beam or composite coupling beams, composition mixing Coupled Shear Wall structure, namely body of wall remains traditional reinforced concrete wall, coupling beam adopts steel coupling beam or composite coupling beams, its objective is and carry out dissipation energy by the ductile deformation of steel coupling beam or composite coupling beams, but its shortcoming to be repaired after shake or more cost is higher.Above two kinds of deficiencies make this type of coupling beam receive different restrictions in actual applications.
Utility model content
Based on above-mentioned defect, the utility model proposes the replaceable steel coupling beam of a kind of span centre clean cut system, for solve seismic energy dissipate and energy-dissipating device to cause there is larger plastic displacement destroying after the technical problem that can not change rapidly.
The technical solution of the utility model is as follows:
The replaceable steel coupling beam of a kind of span centre clean cut system, described steel coupling beam comprises edge of a wing force transmitting board, power consumption plate, frictional high-strength bolts, high strength bolt, steel I-beam, plain bolt, connecting angle and pre-buried junction plate; Wherein, two pieces of pre-buried junction plates are embedded in the concrete shear force wall wall limb surface of both sides respectively in advance; Two steel I-beams respectively with the pre-buried junction plate at two ends by connecting angle and plain bolt is vertical is connected; Between left and right two steel I-beam top flanges and be all connected with edge of a wing force transmitting board by high strength bolt between bottom flange; Power consumption plate is also provided with between left and right two steel I-beam webs, two blocks of power consumption plates are symmetricly set in both sides before and after steel I-beam web, what described power consumption plate comprised span centre position and two ends does not weaken position, and described weakening between position and steel I-beam web passes through high-strength friction bolt connection; The span centre position of described power consumption plate and position shape distortion place that do not weaken at two ends adopt indent arc transition mode, produce stress concentrate to avoid power consumption plate at changes of section place.
Further, the section area at described power consumption plate span centre position and two ends do not weaken the ratio of the section area sum at position is 0.75 ~ 1.0.Wherein, the less power consumption of this value is more, but tension or ultimate shear-carrying capacity reduce relatively, above-mentioned ratio to require according to the concrete power consumption of building and the character of Energy dissipating material is preferably determined, takes into account overall structure power consumption and tension or ultimate shear-carrying capacity.
Further, the thickness of described edge of a wing force transmitting board is 35 ~ 50mm.
Further, the thickness of described power consumption plate is 16 ~ 40mm.
Further, described pre-buried junction plate adopts steel strand to be fixedly connected with between Shear Walls limb.
Further, what described edge of a wing force transmitting board also comprised span centre position and two ends does not weaken position, and not weakening between position with the upper and lower edge of a wing of steel I-beam of described power consumption plate is all fixedly connected with by high strength bolt.
Further, the position that do not weaken of the every one end of described edge of a wing force transmitting board has all been arranged symmetrically with 4 high strength bolts; The position that do not weaken of described every one end of power consumption plate has all been arranged symmetrically with 4 frictional high-strength bolts.
The operating principle of span centre clean cut system steel coupling beam of the present utility model is: Shear Walls limb produces horizontal movement or corner under external force, geological process or wind action, the steel I-beam of adjacent both walls limb is driven to move, the movement of steel I-beam makes web power consumption plate and edge of a wing force transmitting board produce displacement or corner, power consumption plate surrender before, by produce between two block plates by high-strength friction bolt connection frictional force consume portion of energy; Along with the continuation of structure relative displacement or corner increases, power consumption plate enters the plastic stage gradually by elastic stage, when it is about to reach yield strength, by choosing the force transmitting board of appropriate size and power consumption plate, it is made to have precedence over steel I-beam surrender, enter plastic state in advance and produce plastic displacement, external force is done work in this displacement, thus dissipation energy.When power consumption plate larger plastic strain occurs so that impact normally uses after shake, can be dismantled rapidly and be changed the sheet material that completely newly consumes energy, be reached the effect changed flexibly.
Beneficial effect:
Adopt steel coupling beam of the present utility model, under external force by the force transmitting board of choosing appropriate size and power consumption plate, can make its comparatively overall structure enter plastic state in advance, and then dissipation energy, change flexibly after there is shake, convenient the effect with construction be installed.Which solve the deficiency of existing power consumption coupling beam, energy is transmitted to span centre power consumption plate by steel I-beam, and span centre power consumption plate can provide dual defence line, and there is the advantage changed flexibly, thus improve energy-dissipating and shock-absorbing effect and rehabilitation expense after reducing shake.
Accompanying drawing explanation
Fig. 1 is the front view of the replaceable steel coupling beam of the utility model span centre clean cut system;
Fig. 2 is the top view of the replaceable steel coupling beam of the utility model span centre clean cut system;
Fig. 3 is the longitudinally cutting constructional drawing of the replaceable steel coupling beam of the utility model span centre clean cut system;
Fig. 4 is the transverse cross sectional constructional drawing of the replaceable steel coupling beam of the utility model span centre clean cut system.
In figure: 1, edge of a wing force transmitting board, 2, power consumption plate, 3, frictional high-strength bolts, 4, high strength bolt, 5, steel I-beam, 6, plain bolt, 7, connecting angle, 8, pre-buried junction plate, 9, Shear Walls limb.
Detailed description of the invention
As shown in figures 1-4, the replaceable steel coupling beam of a kind of span centre clean cut system of the present utility model, comprises edge of a wing force transmitting board 1, power consumption plate 2, frictional high-strength bolts 3, high strength bolt 4, steel I-beam 5, plain bolt 6, connecting angle 7 and pre-buried junction plate 8.Wherein, the Q390 steel plate that edge of a wing force transmitting board 1 adopts yield strength higher, thickness is 40mm, and power consumption plate 2 adopts mild steel Q235, and thickness is 30mm.Two pieces of pre-buried junction plates 8 are embedded in concrete shear force wall wall limb 9 surface of both sides respectively in advance, and adopt steel strand to be fixedly connected with (not shown) between pre-buried junction plate 8 with Shear Walls limb 9.Two steel I-beams 5 respectively with the pre-buried junction plate 8 at two ends by connecting angle 7 and plain bolt 6 is vertical is connected.Between left and right two steel I-beam 5 top flanges and be all connected with edge of a wing force transmitting board 1 by high strength bolt 4 between bottom flange.Power consumption plate 2 is also provided with between left and right two steel I-beam 5 webs, two blocks of power consumption plates 2 are symmetricly set in both sides before and after steel I-beam 5 web, as shown in Figure 3, what power consumption plate 2 comprised span centre position and two ends does not weaken position, does not weaken between position with steel I-beam 5 web and is connected by frictional high-strength bolts 3.The span centre position of power consumption plate 2 and position shape distortion place that do not weaken at two ends adopt indent arc transition mode, produce stress and concentrate, constriction pattern in the middle of namely adopting to avoid power consumption plate 2 at changes of section place.The section area at described power consumption plate 2 span centre position and two ends do not weaken the ratio of the section area sum at position, namely section area/(two ends do not weaken the section area sum at position) at span centre position is 0.75 ~ 1.0, be specifically related to value 0.85 in the present embodiment, the determination of above-mentioned ratio makes overall structure of the present utility model have optimum power consumption and tension or ultimate shear-carrying capacity.As shown in Figure 4, after the plate 2 that consumes energy adopts sandblasting or shot-peening with steel I-beam 5 web contact surface, raw red rust processes.As shown in Figure 2, what edge of a wing force transmitting board 1 also comprised span centre position and two ends does not weaken position, and not weakening between position with the upper and lower edge of a wing of steel I-beam 5 of described power consumption plate 2 is all fixedly connected with by high strength bolt 4.Wherein, the position that do not weaken of the every one end of edge of a wing force transmitting board 1 has all been arranged symmetrically with 4 high strength bolts 4, and the position that do not weaken of the every one end of power consumption plate 2 has all been arranged symmetrically with 4 frictional high-strength bolts 3, is arranged with 4 bolts hole in each connecting angle 7.
The construction method of the replaceable steel coupling beam of above-mentioned span centre clean cut system, Specific construction step is as follows:
Step one: construction concrete shear force wall, and the concrete shear force wall wall limb 9 surface pre-buried junction plate 8 respectively in both sides;
Step 2: make edge of a wing force transmitting board 1, power consumption plate 2, steel I-beam 5, connecting angle 7, and corresponding site punching thereon, after will consume energy plate 2 and the contact surface sandblasting of steel I-beam 5 web or shot-peening, red rust of life processes;
Step 3: pre-buried junction plate 8 pre-buried with arranged on left and right sides respectively for two steel I-beams 5 is connected by connecting angle 7 and plain bolt 6, keeps the upper and lower edge of a wing of left and right two steel I-beams 5 all in the same horizontal line simultaneously;
Step 4: two blocks of power consumption plates 2 are connected between left and right two steel I-beam 5 webs, and the clamping of two pieces of power consumption plate 2 symmetries is arranged at both sides before and after steel I-beam 5 web, not weakening between position with steel I-beam 5 web of described power consumption plate 2 two ends is fixedly connected with by frictional high-strength bolts 3;
Step 5: between the top flange two pieces of edge of a wing force transmitting boards 1 being arranged at left and right two blocks of steel I-beams 5 and between bottom flange, and not weakening between position with the edge of a wing of steel I-beam 5 of edge of a wing force transmitting board 1 two ends is connected by high strength bolt 4;
Step 6: the construction completing the replaceable steel coupling beam of span centre clean cut system, carries out antirust, anti-corrosive process to described steel coupling beam simultaneously.
Be more than an exemplary embodiments of the present utility model, enforcement of the present utility model is not limited thereto.
Claims (7)
1. the replaceable steel coupling beam of span centre clean cut system, is characterized in that: described steel coupling beam comprises edge of a wing force transmitting board (1), power consumption plate (2), frictional high-strength bolts (3), high strength bolt (4), steel I-beam (5), plain bolt (6), connecting angle (7) and pre-buried junction plate (8); Wherein, two pieces of pre-buried junction plates (8) are embedded in concrete shear force wall wall limb (9) surface of both sides respectively in advance; Two steel I-beams (5) respectively with the pre-buried junction plate (8) at two ends by connecting angle (7) and plain bolt (6) is vertical is connected; Between left and right two steel I-beam (5) top flanges and be all connected with edge of a wing force transmitting board (1) by high strength bolt (4) between bottom flange; Power consumption plate (2) is also provided with between left and right two steel I-beam (5) webs, two pieces of power consumptions plate (2) are symmetricly set in both sides before and after steel I-beam (5) web, what described power consumption plate (2) comprised span centre position and two ends does not weaken position, and described weakening between position with steel I-beam (5) web is connected by frictional high-strength bolts (3).
2. the replaceable steel coupling beam of span centre clean cut system according to claim 1, is characterized in that: the thickness on described edge of a wing force transmitting board (1) is 35 ~ 50mm.
3. the replaceable steel coupling beam of span centre clean cut system according to claim 1, is characterized in that: the thickness of described power consumption plate (2) is 16 ~ 40mm.
4. the replaceable steel coupling beam of span centre clean cut system according to claim 1, is characterized in that: described pre-buried junction plate (8) adopts steel strand to be fixedly connected with between Shear Walls limb (9).
5. the replaceable steel coupling beam of span centre clean cut system according to claim 1, it is characterized in that: what described edge of a wing force transmitting board (1) also comprised span centre position and two ends does not weaken position, and not weakening between position with the upper and lower edge of a wing of steel I-beam (5) of described power consumption plate (2) is all fixedly connected with by high strength bolt (4).
6. the replaceable steel coupling beam of span centre clean cut system according to claim 1, is characterized in that: the position that do not weaken of every one end, described edge of a wing force transmitting board (1) has all been arranged symmetrically with 4 high strength bolts (4); The position that do not weaken of the every one end of described power consumption plate (2) has all been arranged symmetrically with 4 frictional high-strength bolts (3).
7. the replaceable steel coupling beam of span centre clean cut system according to claim 1, is characterized in that: the ratio that the section area at described power consumption plate (2) span centre position and two ends do not weaken the section area sum at position is 0.75 ~ 1.0.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520345696.1U CN204715561U (en) | 2015-05-26 | 2015-05-26 | The replaceable steel coupling beam of span centre clean cut system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520345696.1U CN204715561U (en) | 2015-05-26 | 2015-05-26 | The replaceable steel coupling beam of span centre clean cut system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204715561U true CN204715561U (en) | 2015-10-21 |
Family
ID=54314563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520345696.1U Expired - Fee Related CN204715561U (en) | 2015-05-26 | 2015-05-26 | The replaceable steel coupling beam of span centre clean cut system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204715561U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104878850A (en) * | 2015-05-26 | 2015-09-02 | 辽宁工业大学 | Midspan cut-off type replaceable steel coupling beam |
CN106499247A (en) * | 2016-10-21 | 2017-03-15 | 东南大学 | The replaceable power consumption coupling assembly of assembling frame beam-to-column joint |
CN107663898A (en) * | 2016-07-28 | 2018-02-06 | 湖南鼎盛钢结构建筑有限公司 | A kind of connection load-carrying members of I-beam |
-
2015
- 2015-05-26 CN CN201520345696.1U patent/CN204715561U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104878850A (en) * | 2015-05-26 | 2015-09-02 | 辽宁工业大学 | Midspan cut-off type replaceable steel coupling beam |
CN107663898A (en) * | 2016-07-28 | 2018-02-06 | 湖南鼎盛钢结构建筑有限公司 | A kind of connection load-carrying members of I-beam |
CN106499247A (en) * | 2016-10-21 | 2017-03-15 | 东南大学 | The replaceable power consumption coupling assembly of assembling frame beam-to-column joint |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104878850A (en) | Midspan cut-off type replaceable steel coupling beam | |
CN104047367A (en) | Novel connecting structure capable of achieving replacement of steel coupling beams | |
CN204715561U (en) | The replaceable steel coupling beam of span centre clean cut system | |
CN103306214B (en) | The bracing means of a kind of reinforced concrete beam and floor | |
CN202108134U (en) | Novel section steel plate shear wall | |
CN102839769A (en) | Corrugated steel plate composite shear wall | |
CN102912896B (en) | Separate type steel plate shear force wall | |
CN104746774A (en) | Beam through type corrugated steel plate energy consumption shear wall structure | |
CN103147529A (en) | Assembly type energy dissipation and seismic mitigation shear wall structure system | |
WO2018109678A1 (en) | Beam-column joint | |
CN204040209U (en) | A kind of syndeton of replaceable steel coupling beam | |
CN204282544U (en) | A kind of joint reinforcing and energy consuming mechanism | |
CN205296580U (en) | Removable even roof beam of coincide profile of tooth steel sheet composite damping power consumption type | |
CN201810323U (en) | Bolt connection plate for connecting tunnel inverted arch steel frame with arch angle steel frame | |
CN110656699A (en) | Assembled bamboo beam column energy dissipation shock attenuation node | |
CN206448394U (en) | A kind of attachment structure of replaceable coupling beam and the building containing it | |
CN103821234A (en) | Joint construction for steel-reinforced concrete column and reinforced concrete beam | |
CN204298976U (en) | Without putting more energy into many shear plates damper | |
CN207620154U (en) | A kind of replaceable folded plate mild steel damper and shear wall structure | |
CN104233944B (en) | A kind of two L shape combination type T type power consumption connector and manufacture craft thereof | |
CN203924001U (en) | The anti-ship collision device of steel-concrete combined bridge and anti-ship hit bridge | |
CN211200025U (en) | Shaped steel and concrete combined bridge | |
CN201972270U (en) | Energy-consuming shear wall | |
CN209741646U (en) | Thin connecting component between main beam and abutment of corrugated steel web composite bridge | |
CN204151667U (en) | A kind of two L shape combination type T type power consumption connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 Termination date: 20160526 |