CN204715391U - Mountain region photovoltaic bracket foundation location fastening devices - Google Patents

Mountain region photovoltaic bracket foundation location fastening devices Download PDF

Info

Publication number
CN204715391U
CN204715391U CN201520275002.1U CN201520275002U CN204715391U CN 204715391 U CN204715391 U CN 204715391U CN 201520275002 U CN201520275002 U CN 201520275002U CN 204715391 U CN204715391 U CN 204715391U
Authority
CN
China
Prior art keywords
framework
mountain region
photovoltaic bracket
fastening devices
pallet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520275002.1U
Other languages
Chinese (zh)
Inventor
饶维
李伟
佘超
何凯
郑少平
李定华
王乾盛
肖海成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Electric Power Planning, Design and Research Institute Co.,Ltd.
Original Assignee
HUBEI ELECTRIC POWER SURVEY AND DESIGN INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI ELECTRIC POWER SURVEY AND DESIGN INST filed Critical HUBEI ELECTRIC POWER SURVEY AND DESIGN INST
Priority to CN201520275002.1U priority Critical patent/CN204715391U/en
Application granted granted Critical
Publication of CN204715391U publication Critical patent/CN204715391U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model discloses a kind of mountain region photovoltaic bracket foundation location fastening devices, it is characterized in that: comprise the framework that multiple rigid member connects to form successively from beginning to end, described framework is interval with at least two levelling rods, described frame side wall is interval with multiple abutment sleeve of vertical described framework place plane and multiple regulating sleeve; Also comprise level(l)ing device, described level(l)ing device comprises the pallet being connected to described base of frame, and one end is supported on the adjusting rod of the vertical layout that one end, ground is passed from described pallet and described regulating sleeve; Threaded engagement is passed through between described adjusting rod and described pallet.Adopt the utility model can adapt to mountain region rolling topography very well, locate rapidly, improve construction precision, alleviate manpower burden, reduce material loss, and the overall assembling of device is strong, makes assembling simple efficient, greatly can improve efficiency of construction, reduce construction period, greatly save human and material resources.

Description

Mountain region photovoltaic bracket foundation location fastening devices
Technical field
The utility model relates to mountain region photovoltaic bracket foundation construction technical field, the fixing construction especially in the mountain region photovoltaic bracket location of built-in fitting, basis and concreting process thereof.
Background technology
Residing for the photovoltaic of mountain region, landform is different from level land, and relief is comparatively large, and execution conditions are subject to the serious restriction of environment; In the photovoltaic bracket installation process of mountain region, require that pile foundation must perpendicular to horizontal plane; In order to reach construction requirement, the relative position precision prescribed of 8 photovoltaic brackets is higher, and the micropore castinplace pile of mountain region photovoltaic, be limited by the factors such as terrain environment, borehole accuracy is not high exists relatively large deviation; In concrete casting process, pile foundation is easily shifted, and causes relative position deviation excessive.Although line setting method traditionally can control the verticality of mounting bracket, the relative position of support is difficult to effective control, causes support installing to be easily out of shape and is even difficult to normal mounting.Field practice shows, adopts traditional mounting means easily to cause a large amount of work of doing over again, considerably increases construction cost.Also do not adopt the technical scheme of relevant accessory device at present, make the relative position of work progress medium-height trestle controlled, reduce the error produced in concreting process simultaneously.
Utility model content
The purpose of this utility model is exactly for background technology Problems existing, provide a kind of be applied to mountain region photovoltaic bracket basis built-in fitting location and its concreting process in mountain region photovoltaic bracket foundation location fastening devices.
For achieving the above object, the mountain region photovoltaic bracket foundation location fastening devices of design of the present utility model, it is characterized in that: comprise the framework that multiple rigid member connects to form successively from beginning to end, described framework is interval with at least two levelling rods, described frame side wall is interval with multiple abutment sleeve of vertical described framework place plane and multiple regulating sleeve; Also comprise level(l)ing device, described level(l)ing device comprises the pallet being connected to described base of frame, and one end is supported on the adjusting rod of the vertical layout that one end, ground is passed from described pallet and described regulating sleeve; Threaded engagement is passed through between described adjusting rod and described pallet.
Like this, by abutment sleeve being set on the built-in fitting of photovoltaic bracket basis, auxiliary positioning is carried out to it, thus ensure that the relative position of multiple photovoltaic bracket basis built-in fitting, can ensure in concreting process simultaneously, there is not larger displacement in pile foundation, ensures that the relative position of photovoltaic bracket too great deviations does not occur; Then observe levelling rod, level(l)ing device is regulated, after being levelling rod reveal competence, fix this device, thus guarantee pile foundation all the time perpendicular to horizontal plane.
Preferably, two described levelling rods are had at least to be arranged vertically.Like this, the levelness detecting framework is beneficial to.
Preferably, described frame inner wall is provided with bracing piece.Like this, the integral rigidity of framework is beneficial to.
In order to realize the good fixing of this device, preferably, described framework lateral wall being interval with multiple fixed pull ring, and at least three fixed pull rings are connected with the ground pin inserting ground by rope.
The beneficial effects of the utility model are: the utility model is applicable to mountain region photovoltaic generation project, effectively can improve the efficiency of construction of bracket basis concreting, reduce construction cost, improve construction reliability, its beneficial effect is specially: once fixing by frame construction, build multiple photovoltaic bracket basis simultaneously, substantially increase the efficiency of casting process, effectively saved human cost; Utilize the levelling rod on level(l)ing device and framework, make framework be in level, effectively ensure the sag of basic built-in fitting, reduce loss unnecessary in construction simultaneously, reduce operating expenses; By level(l)ing device, frame plane is fixed on all the time the height being easy to construct, effectively solves physical features environmental limit in the built-in fitting casting process of photovoltaic bracket basis, mountain region, overcome the practical difficulty in work progress, there is mountain region universality; Adopt the utility model can adapt to mountain region rolling topography very well, locate rapidly, improve construction precision, alleviate manpower burden, reduce material loss, and the overall assembling of device is strong, makes assembling simple efficient, greatly can improve efficiency of construction, reduce construction period, greatly save human and material resources.
Accompanying drawing explanation
Fig. 1 is the utility model H floor map, wherein sells not shown with level(l)ing device;
Fig. 2 is the elevation in the utility model work progress;
In figure: framework 1 (rigid member 1.1, bracing piece 1.2), levelling rod 2, abutment sleeve 3, regulating sleeve 4, level(l)ing device 5, pallet 6, adjusting rod 7, fixed pull ring 8, rope 9, pin 10, photovoltaic bracket basis built-in fitting 11.
Detailed description of the invention
Below by Fig. 1 ~ Fig. 2 and the mode enumerating embodiment more of the present utility model; be described in further detail technical scheme of the present invention (comprising optimal technical scheme), any technical characteristic in the present embodiment and any technical scheme all do not limit protection domain of the present utility model.
As depicted in figs. 1 and 2, the mountain region photovoltaic bracket foundation location fastening devices of design of the present utility model, comprise the framework 1 that 4 rigid members 1.1 connect to form successively from beginning to end, this routine middle frame 1 is rectangle, certainly can need to utilize rigid member 1.1 that framework 1 is designed to different shapes according to the construction at scene;
Described framework 1 is interval with at least two levelling rods 2, in this example only two levelling rods 2, and these only two levelling rods 2 are mutually vertical, the levelness like this by detecting different directions is beneficial to the levelness detecting framework 1;
Described framework 1 sidewall is interval with multiple abutment sleeves 3 and multiple regulating sleeve 4 of vertical described framework 1 place plane; On the lateral wall of framework 1, be provided with 8 abutment sleeves 3 in this example, and be all be symmetricly set on the lateral wall of longer rigid member 1.1; On the inwall of framework 1, be provided with 4 regulating sleeves 4 in this example, and be all be symmetricly set on the inwall of longer rigid member 1.1; In this paragraph, said symmetry refers to that the center line of framework 1 is symmetrical centre;
The utility model also comprises level(l)ing device 5, and described level(l)ing device 5 comprises the pallet 6 be connected to bottom described framework 1, and one end is supported on the adjusting rod 7 of the vertical layout that one end, ground is passed from described pallet 6 and described regulating sleeve 4; Threaded engagement is passed through between described adjusting rod 7 and described pallet 6.
Preferably, described framework 1 inwall is provided with bracing piece 1.2, like this, is beneficial to the integral rigidity of framework 1.
As shown in Figure 2, in order to realize the good fixing of this device, preferably, described framework 1 lateral wall being interval with multiple fixed pull ring 8, and at least three fixed pull rings 8 are connected with the ground pin 10 inserting ground by rope 9.In this example, fixed pull ring 8 is arranged on four diagonal angles of framework 1.
In work progress:
First, by abutment sleeve 3 being set on the built-in fitting 11 of photovoltaic bracket basis.Auxiliary positioning is carried out to photovoltaic bracket basis built-in fitting 11, thus ensure that the relative position of multiple photovoltaic bracket basis built-in fitting 11, can ensure in concreting process, there is not larger displacement in pile foundation simultaneously, ensures that the relative position of photovoltaic bracket too great deviations does not occur; The relative position of abutment sleeve 3 is determined according to the design of on-the-spot photovoltaic bracket, is fixed on by abutment sleeve 3 in framework 1 structure, is assisted fixing, effectively prevent from occurring larger displacement in work progress by abutment sleeve 3.The making of framework 1 structure adopts Site Welding, and in use, one-time leveling gets final product the multiple basic built-in fitting of fast pouring, greatly improves the construction precision in concreting process and speed.
Then, the ground of cleaning position, adjusting rod 7 chassis, makes adjusting rod 7 vertically be arranged as suitable; By the height of range estimation adjustment four pallets 6, height and position so that the construction of concreting is advisable, and keeps the general level of framework 1; According to the display of the levelling rod 2 in both direction on framework 1, make levelling rod 2 reveal competence by the height of finely tuning four pallets 6, fix four pallets 6 height and pass through pin 10 fix whole framework 1 structure.In the utility model manufacturing process, strict guarantee abutment sleeve 3 and framework 1 plane is vertical, so by ensureing that the level of framework 1 plane just can ensure the verticality of the pile foundation by abutment sleeve 3.
Finally, next step pouring construction is carried out.

Claims (4)

1. a mountain region photovoltaic bracket foundation location fastening devices, it is characterized in that: comprise the framework that multiple rigid member connects to form successively from beginning to end, described framework is interval with at least two levelling rods, described frame side wall is interval with multiple abutment sleeve of vertical described framework place plane and multiple regulating sleeve; Also comprise level(l)ing device, described level(l)ing device comprises the pallet being connected to described base of frame, and one end is supported on the adjusting rod of the vertical layout that one end, ground is passed from described pallet and described regulating sleeve; Threaded engagement is passed through between described adjusting rod and described pallet.
2. mountain region according to claim 1 photovoltaic bracket foundation location fastening devices, is characterized in that: have at least two described levelling rods to be arranged vertically.
3. mountain region according to claim 1 photovoltaic bracket foundation location fastening devices, is characterized in that: described frame inner wall is provided with bracing piece.
4. mountain region according to claim 1 photovoltaic bracket foundation location fastening devices, is characterized in that: described framework lateral wall is interval with multiple fixed pull ring, and at least three fixed pull rings are connected with the ground pin inserting ground by rope.
CN201520275002.1U 2015-04-29 2015-04-29 Mountain region photovoltaic bracket foundation location fastening devices Active CN204715391U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520275002.1U CN204715391U (en) 2015-04-29 2015-04-29 Mountain region photovoltaic bracket foundation location fastening devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520275002.1U CN204715391U (en) 2015-04-29 2015-04-29 Mountain region photovoltaic bracket foundation location fastening devices

Publications (1)

Publication Number Publication Date
CN204715391U true CN204715391U (en) 2015-10-21

Family

ID=54314395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520275002.1U Active CN204715391U (en) 2015-04-29 2015-04-29 Mountain region photovoltaic bracket foundation location fastening devices

Country Status (1)

Country Link
CN (1) CN204715391U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672882A (en) * 2016-02-26 2016-06-15 中国一冶集团有限公司 Photovoltaic support pile foundation group locating and drilling device and drilling method
CN106026867A (en) * 2016-06-30 2016-10-12 珠海德光源集团有限公司 Prefabricated erect column pile anti-settlement chuck and solar photovoltaic flexible support system
CN108540072A (en) * 2018-04-28 2018-09-14 绵阳鑫阳知识产权运营有限公司 Can good conformity variation of ambient temperature photovoltaic module installation rack
CN112343079A (en) * 2020-11-27 2021-02-09 中国电建集团江西省电力建设有限公司 Construction method for microporous cast-in-place pile foundation of mountain photovoltaic power station

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672882A (en) * 2016-02-26 2016-06-15 中国一冶集团有限公司 Photovoltaic support pile foundation group locating and drilling device and drilling method
CN106026867A (en) * 2016-06-30 2016-10-12 珠海德光源集团有限公司 Prefabricated erect column pile anti-settlement chuck and solar photovoltaic flexible support system
CN108540072A (en) * 2018-04-28 2018-09-14 绵阳鑫阳知识产权运营有限公司 Can good conformity variation of ambient temperature photovoltaic module installation rack
CN108540072B (en) * 2018-04-28 2019-03-22 绵阳鑫阳知识产权运营有限公司 Can good conformity variation of ambient temperature photovoltaic module installation rack
CN112343079A (en) * 2020-11-27 2021-02-09 中国电建集团江西省电力建设有限公司 Construction method for microporous cast-in-place pile foundation of mountain photovoltaic power station

Similar Documents

Publication Publication Date Title
CN204715391U (en) Mountain region photovoltaic bracket foundation location fastening devices
CN102828469B (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN106760571B (en) Tool and method for quickly positioning and adjusting precast beam component
CN204326093U (en) A kind of rigid steel pile locating support
CN110016938B (en) Positioning and verticality adjusting device for rectangular lattice column of reverse construction method foundation pit
CN203626055U (en) Super-high-rise large-section half-embedded type intensive anchor bar steel column base locating support
CN103031892B (en) Steel truss brace and manufacturing method for steel truss platform
CN202866304U (en) Reverse-building-method steel pipe column bottom locating device
CN207959982U (en) A kind of assembling frame structural beams top mark height regulating device
CN207392053U (en) A kind of alignment control device suitable for steel construction abnormity tower
CN103174155B (en) Reverse construction method for erecting steel column and pouring concrete foundation
CN204435409U (en) A kind of embedding anchor bolts construction jig
CN203879041U (en) Embedded plate positioning support frame
CN214116620U (en) Adjustable support for accurate positioning of permanent double-steel-pipe column
CN204019070U (en) Derrick assembling combination steelframe
CN204199691U (en) A kind of handrail formwork for placing structure of spiral stairs
CN203008232U (en) Steel truss strut
CN103572870B (en) A kind of overlength high obliquity curtain wall batter post and mounting method thereof
CN203878563U (en) Suspended single-row scaffold
CN206873957U (en) A kind of ground photovoltaic column pre-embedded anchoring bolts constructing device
CN106930406A (en) A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure
CN203891056U (en) Foundation embedded bolt positioning device of tower crane
CN205954674U (en) High accuracy built -in foundation bolt installation device
KR20100004374U (en) Walls supporter of a truss type
CN206346201U (en) A kind of sand control alignment system for being used to lay lattice column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 430040 1 new bridge four, Jin Yin Hu Street, Dongxihu District, Wuhan, Hubei

Patentee after: POWERCHINA HUBEI ELECTRIC ENGINEERING Corp.,Ltd.

Address before: 430040 1 new bridge four, Jin Yin Hu Street, Dongxihu District, Wuhan, Hubei

Patentee before: HUBEI ELECTRIC POWER SURVEY & DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 430040 1 new bridge four, Jin Yin Hu Street, Dongxihu District, Wuhan, Hubei

Patentee after: Hubei Electric Power Planning, Design and Research Institute Co.,Ltd.

Address before: 430040 1 new bridge four, Jin Yin Hu Street, Dongxihu District, Wuhan, Hubei

Patentee before: POWERCHINA HUBEI ELECTRIC ENGINEERING Corp.,Ltd.