CN204689430U - To Construction of Silo movable hoisting device - Google Patents

To Construction of Silo movable hoisting device Download PDF

Info

Publication number
CN204689430U
CN204689430U CN201520402823.7U CN201520402823U CN204689430U CN 204689430 U CN204689430 U CN 204689430U CN 201520402823 U CN201520402823 U CN 201520402823U CN 204689430 U CN204689430 U CN 204689430U
Authority
CN
China
Prior art keywords
door frame
track
main beam
construction
road wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520402823.7U
Other languages
Chinese (zh)
Inventor
万勇
张红兵
方延洪
曾磊
李英
邓富扬
张志利
杨彩霞
罗竹
张欣
胡亚林
王立青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201520402823.7U priority Critical patent/CN204689430U/en
Application granted granted Critical
Publication of CN204689430U publication Critical patent/CN204689430U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

A kind of To Construction of Silo movable hoisting device, comprise door frame, door frame comprises door frame main beam, support leg beam is provided with at door frame main beam two ends, longitudinally walking bottom girder is furnished with bottom support leg beam, be laid with raker beam between support leg beam and door frame main beam, be provided with road wheel below walking bottom girder, road wheel matches with track; Walking bottom girder in both sides is respectively arranged with the first and second overhanging platforms, two platforms is respectively equipped with and raises unit; Track is buried underground and is obstructed in-orbit, has rail clamping device between track and road wheel.The well lid protection of slag well is slipped in the transport that elevator unit traction hanging scaffold on first overhanging platform of the present utility model can the carry out material again double vertical shaft that does, and the elevator unit traction hanging basket on the second overhanging platform is as the upper and lower passage of workmen.The electric block arranged and clump weight can prevent wirerope-winding in hanging scaffold and lifting of hanging basket process from disturbing, and ensure safe in operation.There is road wheel bottom door frame, can be movably walking in orbit.

Description

To Construction of Silo movable hoisting device
Technical field
The utility model relates to a kind of hanging apparatus, is specifically related to a kind of big cross section vertical shaft movable hoisting device.
Background technology
In Construction of Hydropower Engineering, shaft excavation hanging apparatus generally adopts gauntry crane, construction material transport and personnel utilize gauntry crane and winch coordinating operation up and down, door frame is generally fixed sturcture form, when many vertical shafts are arranged in parallel, multiple fixed type door frame and supporting winch need be set, not only construction has high input, and disturbs each other, there is potential safety hazard.In big cross section To Construction of Silo, problem is particularly outstanding.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of To Construction of Silo movable hoisting device, can overcome and multiple fixed type door frame and supporting winch need be set when many vertical shafts are arranged in parallel and the problem disturbed each other, and device safety of operation is reliable, flexible.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of To Construction of Silo movable hoisting device, comprise door frame, door frame comprises door frame main beam, be provided with support leg beam at door frame main beam two ends, be longitudinally furnished with walking bottom girder bottom support leg beam, between support leg beam and door frame main beam, be laid with raker beam, be provided with road wheel below walking bottom girder, road wheel matches with track;
Described both sides walking bottom girder is respectively arranged with the first overhanging platform and the second overhanging platform, the first overhanging platform and the second overhanging platform arrange first hoist group and second hoist group respectively;
First hoist group is connected with hanging scaffold with steel rope by track adjusting wheel, and track adjusting wheel is arranged on door frame main beam;
Second hoist group is connected with hanging basket with steel rope by track adjusting wheel, and track adjusting wheel is arranged on door frame main beam.
Described main beam is provided with the first electric block and the second electric block, and the first electric block is connected by steel rope with the first clump weight, and the second electric block is connected by steel rope with the second clump weight.
Track is buried underground and is obstructed in-orbit, has rail clamping device between track and road wheel.
Trestle is provided with between second overhanging platform and hanging basket.
Described first hoist group and second hoist group arrange two winchs respectively, and two winchs are for subsequent use each other.
To Construction of Silo movable hoisting device provided by the utility model, the well lid protection of slag well is slipped in the transport that first hoist group traction hanging scaffold on first overhanging platform can the carry out material again double vertical shaft that does, and the second hoist group traction hanging basket on the second overhanging platform is as the upper and lower passage of workmen.The electric block arranged and clump weight can prevent wirerope-winding in hanging scaffold and lifting of hanging basket process from disturbing, and ensure safe in operation.There is road wheel bottom door frame, can be movably walking in orbit, achieve the parallel construction operation of many vertical shafts, improve construction effect, saved construction cost, reduced security risk.Elevator unit arranges two winchs respectively, and two winchs are for subsequent use each other, improve safety control coefficient, guarantees hoisting system construction safe in operation.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is structural front view of the present utility model.
Fig. 2 is structure side view of the present utility model.
Fig. 3 is the A-A cutaway view of Fig. 2.
Fig. 4 is rail clamping device drawing of the present utility model.
In figure: main beam 1, support leg beam 2, raker beam 3, walking bottom girder 4, the overhanging platform 6 ' of rail stalk the 5, first overhanging platform 6, second, first hoist group 7, second hoist group 7 ', track adjusting wheel 8,8 ', steel rope 9,9 ', the first electric block 10, second electric block 10 ', hanging basket 11, hanging scaffold 12, the first clump weight 13, second clump weight 13 ', trestle 14, road wheel 15, track 16, rail clamping device 17, vertical shaft 18, slips slag well 19, the scope of operation 20.
Detailed description of the invention
Structure of the present utility model as Figure 1-4, comprise door frame, door frame comprises door frame main beam 1, support leg beam 2 is provided with at door frame main beam 1 two ends, walking bottom girder 4 is longitudinally furnished with bottom support leg beam 2, be laid with raker beam 3 between support leg beam 2 and door frame main beam 1, be provided with road wheel 15 below walking bottom girder 4, road wheel 15 matches with track 16; Road wheel 15 is removable walking on track 16.Have rail clamping device 17 between described road wheel 15 and track 16, door frame can be fixed on above vertical shaft 18, rail stalk 5 is parallel to many vertical shafts 18 both sides and arranges, top buried underground by track 18.
Walking bottom girder 4 in described both sides is respectively arranged with on the first overhanging platform 6 and the overhanging platform of the second overhanging platform 6 ', the first 6 and the second overhanging platform 6 ' and first hoist group 7 and second hoist group 7 ' are set respectively.
First hoist group 7 is connected with hanging scaffold 12 with steel rope 9 by track adjusting wheel 8, and track adjusting wheel 8 is arranged on door frame main beam 1; Hanging scaffold one is the transport for construction material, and two is double as in vertical shaft to slip the well lid of slag well 19, prevents from personnel from crashing into slipping slag well, protection workmen safety.
Second hoist group 7 ' is connected with hanging basket 11 with steel rope 9 ' by track adjusting wheel 8 ', and track adjusting wheel 8 ' is arranged on door frame main beam 1.Hanging basket 11 is as the upper and lower passage of workmen.
Be provided with trestle 14 between second overhanging platform 6 ' and hanging basket 11, convenient construction personnel arrive hanging basket 11 by well head.
Described main beam 1 is provided with the first electric block 10 and passes the first clump weight 13 of hanging scaffold 12 with steel wire hang near hanging scaffold 12 side, electric block 10 draws the first clump weight 13 and hanging scaffold 12 synchronized operation, avoids being wound around in hanging scaffold 12 working process disturbing.
The second clump weight 13 ' that described main beam 1 is provided with the second electric block 10 ' near hanging basket 11 side and is connected with hanging basket 11 side with steel wire hang, electric block 10 ' draws the second clump weight 13 ' and hanging basket 11 synchronized operation, avoid being wound around in hanging basket 11 working process disturbing, ensure personal security in hanging basket.
Described first hoist group 7 and second hoist group 7 ' arrange two winchs respectively, and two winchs are for subsequent use each other, avoid a winch fault in distraction procedure, and another winch supplements, and tries to avert accidents.
In using, the utility model runs to above the vertical shaft 18 of work, with rail clamping device 17 by road wheel 15 stationary positioned.Construction material is placed on hanging scaffold 12, opens first hoist group 7 and draws hanging scaffold 12 and drop in well, and the scope of operation 20 is slipped slag well well head and closed by hanging scaffold 12; Workmen arrives in hanging basket 11 by trestle 14, and open second hoist group 7 ' and draw the scope of operation in hanging basket 11 decline arrival well, workmen carries out construction operation in well after being taken out by construction material on hanging scaffold 12.Rail clamping device 17 is removed by shaft mouth operation personnel, and this device runs to next To Construction of Silo.

Claims (5)

1. a To Construction of Silo movable hoisting device, comprise door frame, it is characterized in that, door frame comprises door frame main beam (1), be provided with support leg beam (2) at door frame main beam (1) two ends, support leg beam (2) bottom is longitudinally furnished with walking bottom girder (4), is laid with raker beam (3) between support leg beam (2) and door frame main beam (1), walking bottom girder (4) below is provided with road wheel (15), and road wheel (15) matches with track (16);
Described both sides walking bottom girder (4) are respectively arranged with the first overhanging platform (6) and the second overhanging platform (6 '), the first overhanging platform (6) and the second overhanging platform (6 ') arrange first hoist group (7) and second hoist group (7 ') respectively;
First hoist group (7) is connected with hanging scaffold (12) with steel rope (9) by track adjusting wheel (8), and track adjusting wheel (8) is arranged on door frame main beam (1);
Second hoist group (7 ') is connected with hanging basket (11) with steel rope (9 ') by track adjusting wheel (8 '), and track adjusting wheel (8 ') is arranged on door frame main beam (1).
2. a kind of To Construction of Silo movable hoisting device according to claim 1, it is characterized in that: described main beam (1) is provided with the first electric block (10) and the second electric block (10 '), first electric block (10) is connected by steel rope with the first clump weight (13), and the second electric block (10 ') is connected by steel rope with the second clump weight (13 ').
3. a kind of To Construction of Silo movable hoisting device according to claim 1, is characterized in that: track (16) is buried underground and obstructed on (5) in-orbit, has rail clamping device (17) between track (16) and road wheel (15).
4. a kind of To Construction of Silo movable hoisting device according to claim 1, is characterized in that: be provided with trestle (14) between the second overhanging platform (6 ') and hanging basket (11).
5. a kind of To Construction of Silo movable hoisting device according to claim 1, is characterized in that: described first hoist group (7) and second hoist group (7 ') arrange two winchs respectively, and two winchs are for subsequent use each other.
CN201520402823.7U 2015-06-12 2015-06-12 To Construction of Silo movable hoisting device Active CN204689430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520402823.7U CN204689430U (en) 2015-06-12 2015-06-12 To Construction of Silo movable hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520402823.7U CN204689430U (en) 2015-06-12 2015-06-12 To Construction of Silo movable hoisting device

Publications (1)

Publication Number Publication Date
CN204689430U true CN204689430U (en) 2015-10-07

Family

ID=54229745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520402823.7U Active CN204689430U (en) 2015-06-12 2015-06-12 To Construction of Silo movable hoisting device

Country Status (1)

Country Link
CN (1) CN204689430U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836109A (en) * 2017-03-14 2017-06-13 辽宁华三建设工程技术有限公司 A kind of hanging building foot guard repairing treatment suspension platform device
CN107019433A (en) * 2016-06-12 2017-08-08 中山市尚善电器有限公司 A kind of lift pot cover
CN108059088A (en) * 2017-12-25 2018-05-22 中国葛洲坝集团第工程有限公司 Rack slot machine shoulder pole girder deflects in the air turns over interchanging method and device
CN110407109A (en) * 2019-08-08 2019-11-05 中冶天工集团有限公司 A kind of assembling device and construction method of large space ultra-large type air hose
CN111332955A (en) * 2019-11-20 2020-06-26 中国铁建重工集团股份有限公司 Barrel hoisting equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107019433A (en) * 2016-06-12 2017-08-08 中山市尚善电器有限公司 A kind of lift pot cover
CN106836109A (en) * 2017-03-14 2017-06-13 辽宁华三建设工程技术有限公司 A kind of hanging building foot guard repairing treatment suspension platform device
CN106836109B (en) * 2017-03-14 2022-07-05 辽宁华三建设工程技术有限公司 Suspended platform device for protecting, repairing and processing bottom of suspended building
CN108059088A (en) * 2017-12-25 2018-05-22 中国葛洲坝集团第工程有限公司 Rack slot machine shoulder pole girder deflects in the air turns over interchanging method and device
CN108059088B (en) * 2017-12-25 2024-03-12 中国葛洲坝集团第一工程有限公司 Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine
CN110407109A (en) * 2019-08-08 2019-11-05 中冶天工集团有限公司 A kind of assembling device and construction method of large space ultra-large type air hose
CN111332955A (en) * 2019-11-20 2020-06-26 中国铁建重工集团股份有限公司 Barrel hoisting equipment

Similar Documents

Publication Publication Date Title
CN204689430U (en) To Construction of Silo movable hoisting device
CN102139832B (en) Gantry crane device with lengthways and transverse traveling functions and hoisting method
CN206502579U (en) Power pole hoisting device
CN104895337B (en) The installation method of large-size horizontal equipment in concrete frame
CN206502544U (en) Bucket type mixing plant duplex type sister block fall arrest lifting device
CN204875536U (en) High -speed railway bridge construction platform elevating gear
CN104818858B (en) Indoor heavy electrical cabinet hanging method
CN203667797U (en) Simple lifting appliance tooling for SK-2 type double-block sleepers
CN103863938A (en) Safe lifting device for conveying wind tunnel test car
CN113335475B (en) Deck bottom fixed pulley sliding platform dismantling process
CN202379620U (en) Lifting and operating platform comprehensive equipment
CN203820331U (en) Material hoist with built-in steel wire rope
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN204873574U (en) Hoist girder construction of stretching out and drawing back
CN204020894U (en) The drive train of advancing
CN206783156U (en) Handling apparatus in a kind of underground chamber small space
CN102518335A (en) Crane lifting and operation platform comprehensive equipment
CN206244262U (en) Bearing cap finished product frame pallet
CN109488345A (en) A kind of construction method of tunnel arch Fast Installation
CN205275061U (en) Semi -portal crane
CN105672910B (en) Oil pipe traction lifting Aided Machine
CN205295947U (en) Portable bridge anticollision wall construction equipment
CN207361625U (en) A kind of tunnel fixed gantry crane
JP2003180009A (en) Method of transferring power line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant