CN204676373U - A kind of track strengthening structure - Google Patents

A kind of track strengthening structure Download PDF

Info

Publication number
CN204676373U
CN204676373U CN201520181162.XU CN201520181162U CN204676373U CN 204676373 U CN204676373 U CN 204676373U CN 201520181162 U CN201520181162 U CN 201520181162U CN 204676373 U CN204676373 U CN 204676373U
Authority
CN
China
Prior art keywords
sleeper
longeron
crossbeam
buttress
immediately below
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520181162.XU
Other languages
Chinese (zh)
Inventor
陈春来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sanfeng Construction Co Ltd
ZHEJIANG ZHENFENG CONSTRUCTION Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520181162.XU priority Critical patent/CN204676373U/en
Application granted granted Critical
Publication of CN204676373U publication Critical patent/CN204676373U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Railway Tracks (AREA)

Abstract

A kind of track strengthening structure, at least comprises sleeper, longeron, sleeper buttress, steel plate, crossbeam, casing and concrete pad; Described longeron is arranged on directly over sleeper, and is connected by bolt between longeron with sleeper; Described sleeper is symmetricly set on sleeper buttress inner side and is close-coupled on end support; Described crossbeam be arranged on sleeper lower end and with sleeper soffit compact siro spinning technology; Described sleeper buttress is symmetricly set on immediately below longeron two ends; Described concrete pad is arranged on immediately below sleeper buttress, and steel plate is closely rabbeted in the middle of sleeper buttress with concrete; Described casing is symmetricly set on immediately below crossbeam; This track strengthening structure is simple, and science is reliable, tightly stablizes, safety is high, and interference on the road is little, speed is fast, does not disturb railway signal, can ensure both wired traffic safety and box-body jacking time be obstructed minimum, guarantee line direction, height meets the requirements, and has good economic benefit and social benefit, practical, be applicable to promoting the use of.

Description

A kind of track strengthening structure
Technical field
The utility model relates to railroad maintenance and consolidates technical field, especially a kind of track strengthening structure.
Background technology
Along with the repeatedly speed raising of china railway, all fronts isolation that most of circuit carries out is closed.Therefore need to build on existing railway line a lot of on across or under the passage worn so that railway both sides pedestrian and vehicle is current.Underground frame bridge adopts pipe jacking method, instrument has occupation of land and removes few, interference on the road is little, the advantages such as speed is fast, quality is good, relative to bridge crossing, for adapting to existing railway speed-raising needs, link up railway both sides road traffic, cancel the level crossing of Frequent Accidents, under railway line, building overpass bridge with jacking be widely adopted, for ensureing being perfectly safe and normally running of railway and train, must reinforce rail track when frame structure construction jacking, therefore, for the problems referred to above, we propose a kind of route of pipe line ruggedized construction.
Utility model content
Prior art can not meet the needs of people, and for making up prior art deficiency, it is simple that the utility model aims to provide a kind of structure, science is reliable, tight stable, safety is high, and interference on the road is little, speed is fast, do not disturb railway signal, can ensure both wired traffic safety and box-body jacking time be obstructed minimum, guarantee line direction, height meet the requirements, there are good economic benefit and social benefit, practical route of pipe line ruggedized construction.
For achieving the above object, the utility model by the following technical solutions: a kind of track strengthening structure, at least comprises sleeper, longeron, sleeper buttress, steel plate, crossbeam, casing and concrete pad; Described longeron is arranged on directly over sleeper, and is connected by bolt between longeron with sleeper; Described sleeper is symmetricly set on sleeper buttress inner side and is close-coupled on end support; Described crossbeam be arranged on sleeper lower end and with sleeper soffit compact siro spinning technology; Described sleeper buttress is symmetricly set on immediately below longeron two ends; Described concrete pad is arranged on immediately below sleeper buttress, and steel plate is closely rabbeted in the middle of sleeper buttress with concrete; Described casing is symmetricly set on immediately below crossbeam.
As optimisation technique scheme of the present utility model: described longeron adopts i iron binding structure, and longeron i iron is connected with sleeper U bolt and buckle; Described crossbeam adopts i-beam structure, and between crossbeam and casing, space is provided with pad.
Compared with prior art, the beneficial effects of the utility model are: adopt hanger rail beam reinforcing mode in length and breadth, crossbeam adopts i iron, longeron should adopt i iron bundle, the connection of i iron adopts overlap joint or welding, crossbeam i iron is connected with hanger rail application U bolt and buckle, ensure structural integrity and stability, insulation rubber cushion is added between driving rail and i iron, prevent from disturbing railway signal, bridge top top rail fulcrum adopts Drag reduction devices, hanger rail adds beam in length and breadth should on the basis of hanger rail crossbeam, one group of I-shaped steel longitudinal beam consistent with railway direction is respectively added on crossbeam two ends, and adopt U bolt and buckle to be connected with crossbeam, for ensure both wired traffic safety and box-body jacking time be obstructed minimum, take the adjustment of the pad of track strengthening system and jack to rebuild circuit, Framed underpass bridge front track strengthening stage and the jacking rear trimming to circuit in place are mainly taked to tamp and rebuild ballast aggregate to realize, beat pine wedge during jacking, under making i iron, iron block plays a role, space sleeper buttress, timber wedge, iron block pad between crossbeam and casing, and row's pad is established in every jacking one to two meter, ensures overall firm, practical, is applicable to promoting the use of.
Accompanying drawing explanation
Fig. 1 is the utility model overall structure schematic diagram;
Fig. 2 is the utility model local steel plate top view;
Wherein: 1, sleeper, 2, longeron, 3, sleeper buttress, 4, steel plate, 5, crossbeam, 6, casing, 7, concrete pad.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1 ~ 2, in the utility model embodiment, a kind of track strengthening structure, at least comprises sleeper 1, longeron 2, sleeper buttress 3, steel plate 4, crossbeam 5, casing 6 and concrete pad 7; Described longeron 2 is arranged on directly over sleeper 1, and is connected by bolt between longeron 2 with sleeper 1; Described sleeper 1 be symmetricly set on sleeper buttress 3 inside and be close-coupled on end support; Described crossbeam 5 be arranged on sleeper 1 lower end and with sleeper 1 soffit compact siro spinning technology; Described sleeper buttress 3 is symmetricly set on immediately below longeron 2 two ends; Described concrete pad 7 is arranged on immediately below sleeper buttress 3, and steel plate 4 is closely rabbeted in the middle of sleeper buttress 3 with concrete; Described casing 6 is symmetricly set on immediately below crossbeam 5.
As optimisation technique scheme of the present utility model: described longeron 2 adopts i iron binding structure, and longeron 2 i iron is connected with sleeper 1 U bolt and buckle; Described crossbeam 5 adopts i-beam structure, and between crossbeam 5 and casing 6, space is provided with pad.
As Construction Attention thing top of the present utility model: hanger rail with sleeper U bolt and should be connected with buckle, rail Shu Benshen should fix every 15 meter of angle steel and U bolt; Hanger rail length should stretch out 15 meter, the every side of pontic and more than; Should three to five be overlayed outside pontic abutment wall, the connection of i iron can adopt overlap joint or welding, crossbeam i iron is connected with hanger rail application U bolt and buckle, bridge top top rail fulcrum should adopt Drag reduction devices, hanger rail adds beam in length and breadth should on the basis of hanger rail crossbeam, one group of I-shaped steel longitudinal beam consistent with railway direction is respectively added on crossbeam two ends, and adopt U bolt and buckle to be connected with crossbeam, jacking post, top iron, jack are installed in jacking from rear back beam, on the same line, jack installing space is 50 centimetres to three's axis; Center line and elevation should be measured after terminating in examination top, find that deviation can adjust on slide plate, if all are normal, can pressurize and carry out normal jacking; Shoveling is accomplished with digging Sui Ding, the earthwork need to look into after digging out qualified after can jacking, will ensure during shoveling that left and right synchronously puts in place, can take unequal top, both sides power method when adjustment direction controls, high process control can adopt the method supporting and enter to eat native machine to increase nose-up pitching moment.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any Reference numeral in claim should be considered as the claim involved by limiting.
The above; be only preferred embodiment of the present utility model; not in order to limit the utility model, every above embodiment is done according to technical spirit of the present utility model any trickle amendment, equivalently replace and improve, within the protection domain that all should be included in technical solutions of the utility model.

Claims (3)

1. a track strengthening structure, at least comprises sleeper (1), longeron (2), sleeper buttress (3), steel plate (4), crossbeam (5), casing (6) and concrete pad (7); It is characterized in that: described longeron (2) is arranged on directly over sleeper (1), and be connected by bolt between longeron (2) with sleeper (1); Described sleeper (1) is symmetricly set on sleeper buttress (3) inner side and is close-coupled on end support; Described crossbeam (5) be arranged on sleeper (1) lower end and with sleeper (1) soffit compact siro spinning technology; Described sleeper buttress (3) is symmetricly set on immediately below longeron (2) two ends; Described concrete pad (7) is arranged on immediately below sleeper buttress (3), and steel plate (4) is closely rabbeted in the middle of sleeper buttress (3) with concrete; Described casing (6) is symmetricly set on immediately below crossbeam (5).
2. a kind of track strengthening structure according to claim 1, is characterized in that: described longeron (2) adopts i iron binding structure, and longeron (2) i iron is connected with U bolt and buckle with sleeper (1).
3. a kind of track strengthening structure according to claim 1, is characterized in that: described crossbeam (5) adopts i-beam structure, and between crossbeam (5) and casing (6), space is provided with pad.
CN201520181162.XU 2015-03-23 2015-03-23 A kind of track strengthening structure Expired - Fee Related CN204676373U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520181162.XU CN204676373U (en) 2015-03-23 2015-03-23 A kind of track strengthening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520181162.XU CN204676373U (en) 2015-03-23 2015-03-23 A kind of track strengthening structure

Publications (1)

Publication Number Publication Date
CN204676373U true CN204676373U (en) 2015-09-30

Family

ID=54176078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520181162.XU Expired - Fee Related CN204676373U (en) 2015-03-23 2015-03-23 A kind of track strengthening structure

Country Status (1)

Country Link
CN (1) CN204676373U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113174789A (en) * 2021-05-14 2021-07-27 中铁二十四局集团有限公司 Railway fastening rail reinforcing process and equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113174789A (en) * 2021-05-14 2021-07-27 中铁二十四局集团有限公司 Railway fastening rail reinforcing process and equipment

Similar Documents

Publication Publication Date Title
CN206538637U (en) A kind of track strengthening device for existing railway
CN201843076U (en) Groove-shaped steel bridge deck structure of high-speed railway steel tied arched bridge
CN204940141U (en) The reinforcement system of existing line in Framed underpass bridge process
CN204662279U (en) Tumbling-type concrete box girder bridge rotator construction with protection system closes up hanger device
CN103437254B (en) Framed underpass bridge railway trouble district track strengthening device
CN106978777B (en) A kind of make-shift bridge device
CN102926299A (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN111155383B (en) Large-span self-anchored steel box girder suspension bridge track lofting and measuring method
CN203639800U (en) Split streamline steel-concrete composite box girder
CN201671050U (en) Through tie bar rigid frame arch bridge of inter-city express railway
CN110258221A (en) A kind of box frame roadbed
CN204455725U (en) A kind ofly put line construction for middle the low of low speed magnetic suspension traffic engineering embankment location
CN204676373U (en) A kind of track strengthening structure
CN204676374U (en) A kind of strengthening mechanism of rail track
CN104099872A (en) Railway-underneath-passed long-span box culvert longitudinal-picking transverse-lifting jacking construction method
CN103967052B (en) A kind of method of protecting the new and old frame core-tube system substrate discrepancy in elevation soil body
CN206986640U (en) A kind of travelling bridge device for being used for track slab pavement and removing
CN205875200U (en) Barricade formwork support platform truck
CN204174481U (en) Soft clay area modern tram abutment rebound structure
CN203958138U (en) Utilize the overhead railway that headroom is built at the bottom of overpass
CN103243662B (en) Reconstruction and reinforcement method for existing railroad bridge
CN202081383U (en) Temporary support used in construction striding over existing line bridge
CN206385397U (en) The ballastless track structure of sleeper side balanced transversal dynamic load
CN202688805U (en) Framed bent unit with supporting stud outside template
CN205857004U (en) A kind of construction beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160106

Address after: 7 pagoda apartment, Yuhang street, Yuhang District, Zhejiang, Hangzhou 311121

Patentee after: Zhejiang ZhenFeng Construction Co., Ltd.

Patentee after: ZHEJIANG SANFENG CONSTRUCTION CO., LTD.

Address before: 207, room 2, building 50, 310000 Huzhou street, Hangzhou, Zhejiang

Patentee before: Chen Chunlai

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930

Termination date: 20160323

CF01 Termination of patent right due to non-payment of annual fee