CN204619619U - High-altitude long-span watering and lowering dust system - Google Patents

High-altitude long-span watering and lowering dust system Download PDF

Info

Publication number
CN204619619U
CN204619619U CN201520343109.5U CN201520343109U CN204619619U CN 204619619 U CN204619619 U CN 204619619U CN 201520343109 U CN201520343109 U CN 201520343109U CN 204619619 U CN204619619 U CN 204619619U
Authority
CN
China
Prior art keywords
steel wire
wire rope
sparge pipe
span
watering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520343109.5U
Other languages
Chinese (zh)
Inventor
袁瑞卿
曹中升
李哲朋
胡浩
朱四龙
李铭松
刘朝
黄为涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201520343109.5U priority Critical patent/CN204619619U/en
Application granted granted Critical
Publication of CN204619619U publication Critical patent/CN204619619U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of high-altitude long-span watering and lowering dust system, track cable steel wire rope is linked with many group walking brackets, many groups sparge pipe that segmentation is laid is clamped in walking bracket bottom, the haulage cable be positioned at below track cable steel wire rope laterally runs through and connects many group walking brackets, sparge pipe has multiple rotary nozzle.The utility model adopts track cable steel wire hang across river sparge pipe, the water curtain that multiple rotary nozzles on sparge pipe spray or water smoke completely cut off airborne dust, avoid airborne dust to spread with the wind, effectively reduce dust pollution, significantly improve construction operation environment, ensure that Health Status For Workers Exposed.The sparge pipe arranged can be divided into multistage according to job area area and span, and every section can sprinkle water and spray separately, also can multistage gamut while atomizing de-dusting.

Description

High-altitude long-span watering and lowering dust system
Technical field
The utility model relates to watering and lowering dust system, is specifically related to a kind of watering and lowering dust system being applicable to high-altitude and large span.
Background technology
In the high gradient slope Excavation Blasting processes such as Dam dam abutment, construction part is in high-altitude, span is large, area is large, and top layer ground disturbance, impact of splashing are comparatively large, easily causes on a large scale, large area dust pollution, working face construction environment is poor, works the mischief to operating personnel is healthy.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of high-altitude long-span watering and lowering dust system, can solve the problem of high-altitude, large span, large area dust pollution, improve operating environment, ensures that operating personnel is healthy.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of high-altitude long-span watering and lowering dust system, comprise track cable steel wire rope, track cable steel wire rope is linked with many group walking brackets, many groups sparge pipe that segmentation is laid is clamped in walking bracket bottom, sparge pipe afterbody is provided with gate valve and is communicated with vibration means for main pipe for supplying water, and vibration means for main pipe for supplying water has tubing pump, and the haulage cable be positioned at below track cable steel wire rope laterally runs through and connects many group walking brackets.
The traveling wheel on walking bracket top matches with track cable steel wire rope, can on track cable steel wire rope sliding-rolling, walking bracket is fixed on haulage cable by wire rope clamps, and walking bracket bottom is provided with water pipe snap ring, and water pipe snap ring clamps organizing sparge pipe more.
Described sparge pipe there is multiple rotary nozzle.
Track cable steel wire rope two ends are separately fixed on fixed pulley, and fixed pulley is anchored on concrete anchor pier.
Haulage cable with organize leading block and hoist engine is connected into reciprocating loop more.
A kind of high-altitude long-span watering and lowering dust system that the utility model provides, adopt track cable steel wire hang across river sparge pipe, the water curtain that multiple rotary nozzles on sparge pipe spray or water smoke completely cut off airborne dust, airborne dust is avoided to spread with the wind, effectively reduce dust pollution, significantly improve construction operation environment, ensure that Health Status For Workers Exposed.The sparge pipe arranged can be divided into multistage according to job area area and span, and every section can sprinkle water and spray separately, also can gamut while atomizing de-dusting.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, comprising:
Fig. 1 is structural representation of the present utility model
Fig. 2 is the A-A sectional view of Fig. 1.
In figure: track cable steel wire rope 1, walking bracket 2, traveling wheel 21, fixing card 22, snap ring 23, sparge pipe 3, haulage cable 4, rotary nozzle 5, fixed pulley 6, anchor pier 7, leading block 8, hoist engine 9, gate valve 10, vibration means for main pipe for supplying water 11, tubing pump 12.
Detailed description of the invention
Structure of the present utility model as shown in Figure 1-2, a kind of high-altitude long-span watering and lowering dust system, track cable steel wire rope 1 is linked with many group walking brackets 2, many groups sparge pipe 3 that segmentation is laid is clamped in walking bracket 2 bottom, and the haulage cable 4 be positioned at below track cable steel wire rope 1 laterally runs through and connects many group walking brackets 2.
Described many group sparge pipes 3 there is multiple rotary nozzle 5.
The traveling wheel 21 on walking bracket 2 top is ridden on track cable steel wire rope 1, and slidably roll, walking bracket 2 is fixed on haulage cable 4 by the wire rope clamps 22 at middle part, and bottom is provided with two drainpipe snap rings 23 and clamps organizing sparge pipe 3 more.Snap ring also can be arranged to many rows, need coupling according to the group number that sparge pipe is arranged.
Track cable steel wire rope 1 two ends are separately fixed on the fixed pulley 6 of massif both sides, and fixed pulley 6 is anchored on concrete anchor pier 7.
Ropeway carrying-rope steel wire rope 1 fixed pulley 6 is fixed, and steel wire rope overflexing can be avoided to wear and tear.
Ropeway carrying-rope steel wire rope 1 pair of haulage cable 4, sparge pipe 3, rotary nozzle 5, walking 2, bracket suspention supporting role, ropeway carrying-rope steel wire rope 3 select and the stressed of anchor pier 1 should meet load bearing requirements.
Haulage cable 4 and four groups of leading blocks 8 and hoist engine 9 are connected into reciprocating loop.Can be used for the installation of sparge pipe 3 and rotary nozzle 5, maintenance, replacing and dismounting, also can be used as the cable wind rope keeping native system stable simultaneously.
Many groups sparge pipe 3 afterbody is provided with gate valve 10 and is communicated with vibration means for main pipe for supplying water 11, vibration means for main pipe for supplying water 11 has tubing pump 12.Sparge pipe 3 can be divided into multistage according to job area area and span, and every section can sprinkle water and spray separately, also can gamut atomizing de-dusting simultaneously, controls whole region.The present embodiment is 4 sparge pipes preferably, and supply press water in massif side, two sides respectively, one is assure feed water pressure, and two is to be divided into 4 operating areas, mutually mates with Contraction in Site face.
In using, after whole system having been arranged, the gate valve 10 opening sparge pipe 3 supplies water at atmospheric pressure, checks the watering and lowering dust situation of rotary nozzle 5.When not reaching expection dust-laying effect, after opening tubing pump 12 supercharging, water flowing is debugged, and makes system reach ideal effect.First usual setting-out, then by tubing pump 12 supercharging, avoid excessive sparge pipe 3 and the rotary nozzle 5 of causing of pressure to damage.

Claims (5)

1. a high-altitude long-span watering and lowering dust system, comprise track cable steel wire rope (1), it is characterized in that: track cable steel wire rope (1) is linked with many groups walking bracket (2), many groups sparge pipe (3) that segmentation is laid is clamped in walking bracket (2) bottom, sparge pipe (3) afterbody is provided with gate valve (10) and is communicated with vibration means for main pipe for supplying water (11), vibration means for main pipe for supplying water (11) has tubing pump (12), the haulage cable (4) being positioned at track cable steel wire rope (1) below laterally runs through and connects many groups walking bracket (2).
2. a kind of high-altitude long-span watering and lowering dust system according to claim 1, it is characterized in that: the traveling wheel (21) on walking bracket (2) top matches with track cable steel wire rope (1), can at the upper sliding-rolling of track cable steel wire rope (1), wire rope clamps (22) bracket (2) of walking is fixed on haulage cable (4), walking bracket (2) bottom is provided with water pipe snap ring (23), and water pipe snap ring (23) will be organized sparge pipe (3) more and clamp.
3. a kind of high-altitude long-span watering and lowering dust system according to claim 1, is characterized in that: described sparge pipe (3) has multiple rotary nozzle (5).
4. a kind of high-altitude long-span watering and lowering dust system according to claim 1, is characterized in that: track cable steel wire rope (1) two ends are separately fixed on fixed pulley (6), and fixed pulley (6) is anchored on concrete anchor pier (7).
5. a kind of high-altitude long-span watering and lowering dust system according to claim 1, is characterized in that: haulage cable (4) with organize leading block (8) and hoist engine (9) is connected into reciprocating loop more.
CN201520343109.5U 2015-05-26 2015-05-26 High-altitude long-span watering and lowering dust system Active CN204619619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520343109.5U CN204619619U (en) 2015-05-26 2015-05-26 High-altitude long-span watering and lowering dust system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520343109.5U CN204619619U (en) 2015-05-26 2015-05-26 High-altitude long-span watering and lowering dust system

Publications (1)

Publication Number Publication Date
CN204619619U true CN204619619U (en) 2015-09-09

Family

ID=54038683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520343109.5U Active CN204619619U (en) 2015-05-26 2015-05-26 High-altitude long-span watering and lowering dust system

Country Status (1)

Country Link
CN (1) CN204619619U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105910067A (en) * 2016-06-16 2016-08-31 中国葛洲坝集团三峡建设工程有限公司 Aerial large-span adjustable easy-maintenance illuminating system and mounting utilization method
CN110820748A (en) * 2019-10-21 2020-02-21 中电建十一局工程有限公司 Temperature control device for roller compacted concrete and manufacturing method thereof
CN111167237A (en) * 2020-01-09 2020-05-19 中电建十一局工程有限公司 High slope blasting excavation dust-settling method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105910067A (en) * 2016-06-16 2016-08-31 中国葛洲坝集团三峡建设工程有限公司 Aerial large-span adjustable easy-maintenance illuminating system and mounting utilization method
CN105910067B (en) * 2016-06-16 2022-06-03 中国葛洲坝集团三峡建设工程有限公司 Large-span adjustable easy-maintenance lighting system and installation and use method
CN110820748A (en) * 2019-10-21 2020-02-21 中电建十一局工程有限公司 Temperature control device for roller compacted concrete and manufacturing method thereof
CN111167237A (en) * 2020-01-09 2020-05-19 中电建十一局工程有限公司 High slope blasting excavation dust-settling method

Similar Documents

Publication Publication Date Title
CN204619619U (en) High-altitude long-span watering and lowering dust system
CN203944254U (en) A kind of tower crane water injection system
CN102155237A (en) Device for replacing tail brush in shield tunneling process and construction method thereof
CN209555753U (en) The anti-fall beam construction of pier monoblock type on a kind of arch
CN208197133U (en) The automatic water mists canopy cover curing system of concrete prefabricated element
CN201686380U (en) Vertical transporter for full face excavation of deep vertical shaft
CN201170104Y (en) Top board support component in fully mechanized caving face ending
CN111365522A (en) Installation method of long-distance pipeline in underground pipe gallery
CN109811725A (en) A kind of canal for water conveyance is not cut off the water Quick overhaul method
CN206386129U (en) Sliding concrete point slurry device
CN109469501A (en) A kind of underground coal mine large channel end socket suspension hydraulic support
CN212327756U (en) Dust device for construction site
CN204874566U (en) Device is changed to blast furnace hot -blast valve
CN202543759U (en) Concrete block for road construction
CN207999268U (en) End hydraulic control support with mesh-layingdevice
CN208235590U (en) A kind of rectangle vertical shaft sliding sash turning-over
CN202370265U (en) Movable type safe and flat screen
CN205260392U (en) Underground cavern construction time cigarette system that looses of ventilating
CN106087700B (en) A kind of retractable floating pipe bridge applied to floating type pumping plant
CN111379585A (en) Method for managing gas buried pipe on upper corner of fully mechanized coal mining face
CN209602956U (en) A kind of lifting bracket convenient for suspension cable installation
CN104946835B (en) Blast furnace hot-blast valve maintenance platform
CN214656339U (en) High altitude drainage pipe installation device
CN202360142U (en) Diagonally-drawn hanging device for wind and water pipes
CN205933040U (en) Portal frame hoisting accessory

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant