CN204589912U CN201520016798.9U CN201520016798U CN204589912U CN 204589912 U CN204589912 U CN 204589912U CN 201520016798 U CN201520016798 U CN 201520016798U CN 204589912 U CN204589912 U CN 204589912U
Authority
CN
China
Prior art keywords
pipe racks
water
racks body
flood control
underground space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520016798.9U
Other languages
Chinese (zh)
Inventor
石俊杰
赵红芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Water Engineering Design and Research Institute Co Ltd
Original Assignee
Shanghai Water Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Water Engineering Design and Research Institute Co Ltd filed Critical Shanghai Water Engineering Design and Research Institute Co Ltd
Priority to CN201520016798.9U priority Critical patent/CN204589912U/en
Application granted granted Critical
Publication of CN204589912U publication Critical patent/CN204589912U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

A kind of Water flood control pipe racks disclosed in the utility model, to comprise in the open drain being fixedly laid on underground space entrance and its length be at least longer than both sides, underground space entrance side direction barricade between the pipe racks body of distance, described pipe racks body closed at both ends, the top of described pipe racks body is arranged at intervals with at least one outlet valve along its length, described pipe racks body is provided with a water-filling interface, before arriving flood season, open outlet valve on pipe racks body and by the water-filling interface on pipe racks body to water-filling in pipe racks body, height after described pipe racks body water-filling expands at least higher than described open drain the degree of depth and with the side direction barricade close contact of both sides, underground space entrance and form sealing.The beneficial effects of the utility model are: whole operation only just can complete by a people, and without the need to starting drive, energy-conserving and environment-protective, dash of the present utility model is effective, can be widely used in the large and medium-sized underground space, garage, the flood control emergency response of subway entrance.

Description

A kind of Water flood control pipe racks
Technical field
The utility model relates to the technical field of flood control in flood season equipment, particularly relates to a kind of Water flood control pipe racks, is widely used in the large and medium-sized underground space, garage, the flood control emergency response of subway entrance.
Background technology
Along with the increase of extreme natural calamity, the particularly increase of Severe rainstorm weather, brings huge challenge to the safety of urban underground space, and the Safety of Flood Control of the underground space becomes the new emphasis of engineering construction and management domain day by day.At present, conventional underground space flood control dash design, as card slot type, buried, superposing type flood control baffle plate etc., its installation workload is large, and mostly needs separate space to deposit, and needs special maintenance and maintenance facility, make and maintenance cost large.
For this reason, applicant carried out useful exploration and trial, have found result of the above problems, technical scheme described below produces under this background.
Utility model content
Technical problem to be solved in the utility model: for the design of existing underground space flood control dash exist installation workload large, take separate space and deposit, keep in repair and the problem such as maintenance cost is high, now provide a kind of mounting arrangements simple, take up room little, make and Water flood control pipe racks that maintenance cost is low, light and durable.
The technical problem that the utility model solves can realize by the following technical solutions:
A kind of Water flood control pipe racks, to comprise in the open drain being fixedly laid on underground space entrance and its length be at least longer than both sides, underground space entrance side direction barricade between the pipe racks body of distance, described pipe racks body closed at both ends, the top of described pipe racks body is arranged at intervals with at least one outlet valve along its length, described pipe racks body is provided with a water-filling interface, before arriving flood season, open outlet valve on pipe racks body and by the water-filling interface on pipe racks body to water-filling in pipe racks body, height after described pipe racks body water-filling expands at least higher than described open drain the degree of depth and with the side direction barricade close contact of both sides, underground space entrance and form sealing.
In a preferred embodiment of the present utility model, the bottom of described pipe racks body is arranged at intervals with some securing members in order to be fixed on by described pipe racks body bottom described open drain along its length.
In a preferred embodiment of the present utility model, described securing member is bolt.
In a preferred embodiment of the present utility model, described water-filling interface is arranged on one end of described pipe racks body and is positioned at outside the side direction barricade of both sides, underground space entrance, and described water-filling interface is drawn outside described open drain.
In a preferred embodiment of the present utility model, described water-filling interface is plugged into the one in the water outlet mouthpiece of the water outlet mouthpiece of municipal fire water or the water outlet mouthpiece of water supply pool water or water tank water.
In a preferred embodiment of the present utility model, described pipe racks body is rubber tube belt body.
In a preferred embodiment of the present utility model, described pipe racks body not dash time, the top of described open drain is equipped with permeable cover plate.
Owing to have employed technical scheme as above, the beneficial effects of the utility model are: whole operation only just can complete by a people, without the need to starting drive, energy-conserving and environment-protective, dash of the present utility model is effective, can be widely used in the large and medium-sized underground space, garage, the flood control emergency response of subway entrance.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the schematic diagram that the utility model is laid in the open drain of underground space entrance.
The duty sectional drawing that Fig. 2 is the utility model when not dash.
Fig. 3 is the duty sectional drawing of the utility model when dash.
Detailed description of the invention
The technological means realized to make the utility model, creation characteristic, reaching object and effect is easy to understand, below in conjunction with concrete diagram, setting forth the utility model further.
See Fig. 1 to Fig. 3, a kind of Water flood control pipe racks provided in figure, comprise pipe racks body 100, this pipe racks body 100 is preferably rubber tube belt body, stretches to adapt to it.Pipe racks body 100 is fixedly laid in the open drain 200 of underground space entrance in folding mode, and its length is at least longer than the distance between side direction barricade 300a, 300b of both sides, underground space entrance.
Pipe racks body 100 closed at both ends, its top is arranged at intervals with at least one outlet valve 110 along its length, and the quantity of outlet valve 110 should be determined according to the length of pipe racks body 100, and the length of pipe racks body 100 is longer, and the quantity of outlet valve 110 is more, and vice versa.Pipe racks body 100 is provided with a water-filling interface 120, this water-filling interface 120 is arranged on one end of pipe racks body 100 and is positioned at outside side direction barricade 300a, 300b of both sides, underground space entrance, and, water-filling interface 120 is drawn outside open drain 200, can to plug into water supply interface, be that pipe racks body 100 is filled with water by watering, this water supply interface can be the one in the water outlet mouthpiece of the water outlet mouthpiece of municipal fire water or the water outlet mouthpiece of water supply pool water or water tank water.
In order to pipe racks body 100 is fixed in open drain 200, open drain 200 is departed under impact at water after expanding to prevent pipe racks body 100 water-filling when flood season, be arranged at intervals with along its length in the bottom of pipe racks body 100 some pipe racks body 100 is fixed on bottom open drain 210 securing member, securing member is preferably bolt 130, in addition, bolt 130 should be two rows, make to form plane contact between 210 bottom the bottom of pipe racks body 100 and open drain, make contact area between the two larger, the stability after pipe racks body 100 water-filling expands is better.
See Fig. 1 and Fig. 2, pipe racks body 100 not dash time, when being pipe racks body 100 non-water-filling, pipe racks body 100 is folded in open drain 200, and lay permeable cover plate 220 at the top of open drain 200, permeable cover plate 210 1 aspect plays the effect of permeable drainage, prevents foreign material from falling in open drain 200 on the other hand.See Fig. 3, before arriving flood season, first the permeable cover plate 220 at top, open drain 200 is taken off, then outlet valve 110 on pipe racks body 100 is opened and by the water-filling interface 120 on pipe racks body 100 to water-filling in pipe racks body 100, pipe racks body 100 expands and after filling full open drain 200 gradually, upwards extend gradually, with the side direction barricade 300a of both sides, underground space entrance, 300b close contact and form sealing, height h after its water-filling expands higher than open drain 200 degree of depth a and lower than the side direction barricade 300a of both sides, underground space entrance, the height H of 300b, height when the distance h1 of top to open drain 200 end face after pipe racks body 100 water-filling expands is flood control, this height can regulate according to the telescopicing performance of pipe racks body 100 and filled water amount.See Fig. 2, after terminating flood season, discharged by the water in pipe racks body 100 by the water-filling interface 120 on pipe racks body 100, water is discharged completely, is laid on folding for pipe racks body 100 in open drain 200.Whole operation only just can complete by a people, and without the need to starting drive, energy-conserving and environment-protective, dash of the present utility model is effective, can be widely used in the large and medium-sized underground space, garage, the flood control emergency response of subway entrance.
More than show and describe general principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (7)

1. a Water flood control pipe racks, it is characterized in that, to comprise in the open drain being fixedly laid on underground space entrance and its length be at least longer than both sides, underground space entrance side direction barricade between the pipe racks body of distance, described pipe racks body closed at both ends, the top of described pipe racks body is arranged at intervals with at least one outlet valve along its length, described pipe racks body is provided with a water-filling interface, before arriving flood season, open outlet valve on pipe racks body and by the water-filling interface on pipe racks body to water-filling in pipe racks body, height after described pipe racks body water-filling expands at least higher than described open drain the degree of depth and with the side direction barricade close contact of both sides, underground space entrance and form sealing.
2. Water flood control pipe racks as claimed in claim 1, it is characterized in that, the bottom of described pipe racks body is arranged at intervals with some securing members in order to be fixed on by described pipe racks body bottom described open drain along its length.
3. Water flood control pipe racks as claimed in claim 2, it is characterized in that, described securing member is bolt.
4. Water flood control pipe racks as claimed in claim 1, it is characterized in that, described water-filling interface is arranged on one end of described pipe racks body and is positioned at outside the side direction barricade of both sides, underground space entrance, and described water-filling interface is drawn outside described open drain.
5. Water flood control pipe racks as claimed in claim 4, is characterized in that, described water-filling interface is plugged into the one in the water outlet mouthpiece of the water outlet mouthpiece of municipal fire water or the water outlet mouthpiece of water supply pool water or water tank water.
6. Water flood control pipe racks as claimed in claim 1, it is characterized in that, described pipe racks body is rubber tube belt body.
7. Water flood control pipe racks as claimed in claim 1, is characterized in that, described pipe racks body not dash time, the top of described open drain is equipped with permeable cover plate.
CN201520016798.9U 2015-01-09 2015-01-09 A kind of Water flood control pipe racks Expired - Fee Related CN204589912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520016798.9U CN204589912U (en) 2015-01-09 2015-01-09 A kind of Water flood control pipe racks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520016798.9U CN204589912U (en) 2015-01-09 2015-01-09 A kind of Water flood control pipe racks

Publications (1)

Publication Number Publication Date
CN204589912U true CN204589912U (en) 2015-08-26

Family

ID=53926081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520016798.9U Expired - Fee Related CN204589912U (en) 2015-01-09 2015-01-09 A kind of Water flood control pipe racks

Country Status (1)

Country Link
CN (1) CN204589912U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254875A (en) * 2020-01-23 2020-06-09 天津大学 Flood prevention method for underground space access

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254875A (en) * 2020-01-23 2020-06-09 天津大学 Flood prevention method for underground space access

Similar Documents

Publication Publication Date Title
CN102966090A (en) System for automatically draining water on side slope and method therefor
CN109611007A (en) A kind of Inlet and outlet gas bellows water-tight device
CN110184969A (en) A kind of highway guard rail
CN204589912U (en) A kind of Water flood control pipe racks
CN202989903U (en) Automatic side slope drainage system
CN205557464U (en) Type of can decontaminating intelligence flood control dam
CN207892008U (en) A kind of drainage arrangement for municipal water conservancy
CN204456011U (en) Self-floating turns over gate baffle device for water
CN202644491U (en) Urban landscape steel gate
CN105672404B (en) The intake strucure of lateral intake
CN105613226A (en) Simple rainwater irrigation system
CN206359955U (en) Electronic flood control baffle plate
CN208309681U (en) A kind of overpass rainwater-collecting reutilization system
CN204326110U (en) A kind of inspection well cover of not easily ponding
CN203890968U (en) Flipping type slide rail flood protection gate
CN102491158A (en) Drainage device of escalator or moving pavement
CN206791237U (en) A kind of Subsiding land afforests automatic sprinkling system
CN205557473U (en) Remote control type floodwall dam gate
CN206768592U (en) Bridge longitudinal drainage device
CN103669475A (en) Desert-governance greening system capable of forming desert underground reservoir
CN206034371U (en) Afforestation water conservancy bank protection
CN204608811U (en) Ultra-deep-water position drop and drainage structure
CN204898601U (en) Can splice flood prevention door
CN203603208U (en) Desert underground reservoir formed to treat desert greening system
CN107012884A (en) Formula retaining structure is helped in a kind of storehouse

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826