CN204589214U - The installation thrustor of blast furnace cooling stave - Google Patents

The installation thrustor of blast furnace cooling stave Download PDF

Info

Publication number
CN204589214U
CN204589214U CN201520219756.5U CN201520219756U CN204589214U CN 204589214 U CN204589214 U CN 204589214U CN 201520219756 U CN201520219756 U CN 201520219756U CN 204589214 U CN204589214 U CN 204589214U
Authority
CN
China
Prior art keywords
cooling stave
blast furnace
installation
thrustor
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520219756.5U
Other languages
Chinese (zh)
Inventor
李文强
谢惠夫
袁春阳
贾玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
NANJING BRANCH CHINA 19TH METALLURGICAL Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING BRANCH CHINA 19TH METALLURGICAL Corp filed Critical NANJING BRANCH CHINA 19TH METALLURGICAL Corp
Priority to CN201520219756.5U priority Critical patent/CN204589214U/en
Application granted granted Critical
Publication of CN204589214U publication Critical patent/CN204589214U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Blast Furnaces (AREA)

Abstract

This technology provides one can quick travel to cooling stave, especially in the horizontal direction can quick travel to cooling stave, makes cooling stave be shifted accurately, the installation thrustor of the blast furnace cooling stave that installation effectiveness is high.It comprises be arranged in last furnace shell can the hanging scaffold of oscilaltion, arrange oil cylinder on hanging scaffold top, the cylinder body of oil cylinder is fixed on hanging scaffold, and the piston rod of oil cylinder extends along horizontal direction.

Description

The installation thrustor of blast furnace cooling stave
Technical field
When this technology relates to transformation or newly-built steel-making blast furnace, the device of blast furnace cooling stave is installed.
Background technology
When transformation or newly-built steel-making blast furnace, in order to install cooling stave, the general row mode of hanging that adopts promotes cooling stave.But because row hangs very high, row hangs when horizontal direction moves and is difficult to accomplish the actual displacement to cooling stave, causes cooling stave installation effectiveness very low.
Summary of the invention
The object of this technology is to provide one can quick travel to cooling stave, especially in the horizontal direction can quick travel to cooling stave, makes cooling stave be shifted accurately, the installation thrustor of the blast furnace cooling stave that installation effectiveness is high.
The installation thrustor of the blast furnace cooling stave described in this technology, it comprise be arranged in last furnace shell can the hanging scaffold of oscilaltion, arrange oil cylinder on hanging scaffold top, the cylinder body of oil cylinder is fixed on hanging scaffold, and the piston rod of oil cylinder extends along horizontal direction.
The beneficial effect of this technology: during installation, is placed on hanging scaffold after cooling stave is promoted.Can promote cooling stave by the piston rod of oil cylinder and be moved horizontally to installation site, displacement is simple and accurately, and operator may stand on hanging scaffold and weld cooling stave and furnace shell.Need to adjust height location and be, can lift sinking stage.
The installation thrustor of above-mentioned blast furnace cooling stave, cylinder body or cutterhead are connected with the expansion link coaxial with piston rod; The intersect vertical axis of piston rod and blast furnace.In order to when oil cylinder pushing cooling stave contacts with furnace shell, hanging scaffold moves in the horizontal direction, and is provided with expansion link.When oil cylinder pushing cooling stave, expansion link is conflicted the inwall of furnace shell, prevents hanging scaffold from moving horizontally; Do not needing to promote cooling stave to be that expansion link withdrawal, prevents from counteracting moving up and down of cutterhead.
The installation thrustor of above-mentioned blast furnace cooling stave, described expansion link is a screw block.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the installation thrustor of blast furnace cooling stave.
Embodiment
The installation thrustor of blast furnace cooling stave shown in Figure 1, comprises being arranged on and can the hanging scaffold 1(of oscilaltion drive the mode of sinking stage's elevation and subsidence to belong to prior art in last furnace shell 10, no longer illustrates).There is on hanging scaffold top the column 2 upwards extended.
The cylinder body 31 of oil cylinder 3 is hinged on the side of column, and the opposite side of column is connected by the support of steel pipe 8 with screw block 4, and the telescopic shaft 41 of screw block is connected with steel pipe 5.The end of the piston rod 32 of oil cylinder 3 is connected with steel pipe 7.
The two ends of the second oil cylinder 6 respectively with cylinder body 31 and column hinged, drive oil cylinder 3 to swing during the second cylinder action.
Steel pipe 7, piston rod 32, steel pipe 8, telescopic shaft 41, steel pipe 5 are coaxial, and intersect vertically with the axis 11 of blast furnace.
Cutterhead is also provided with the operating gear 9 controlling the actions such as oil cylinder 3, second oil cylinder 6.The length of steel pipe 5,7 can adjust as required.

Claims (3)

1. the installation thrustor of blast furnace cooling stave, is characterized in that, it comprise be arranged in last furnace shell can the hanging scaffold of oscilaltion, arrange oil cylinder on hanging scaffold top, the cylinder body of oil cylinder is fixed on hanging scaffold, and the piston rod of oil cylinder extends along horizontal direction.
2. the installation thrustor of blast furnace cooling stave as claimed in claim 1, is characterized in that: on cylinder body or cutterhead, be connected with the expansion link coaxial with piston rod; The intersect vertical axis of piston rod and blast furnace.
3. the installation thrustor of blast furnace cooling stave as claimed in claim 2, is characterized in that: described expansion link is a screw block.
CN201520219756.5U 2015-04-14 2015-04-14 The installation thrustor of blast furnace cooling stave Active CN204589214U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520219756.5U CN204589214U (en) 2015-04-14 2015-04-14 The installation thrustor of blast furnace cooling stave

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520219756.5U CN204589214U (en) 2015-04-14 2015-04-14 The installation thrustor of blast furnace cooling stave

Publications (1)

Publication Number Publication Date
CN204589214U true CN204589214U (en) 2015-08-26

Family

ID=53925387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520219756.5U Active CN204589214U (en) 2015-04-14 2015-04-14 The installation thrustor of blast furnace cooling stave

Country Status (1)

Country Link
CN (1) CN204589214U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680112A (en) * 2019-02-26 2019-04-26 中国一冶集团有限公司 Last furnace shell cooling wall installation system and installation method
CN110241942A (en) * 2019-06-26 2019-09-17 吉林建筑大学 A kind of cold-rolled forming section faced wall of the anti-buckling support of the light-duty assembled of inner clip
CN113549718A (en) * 2021-07-19 2021-10-26 鞍钢建设集团有限公司 Replacement method of blast furnace cooling wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680112A (en) * 2019-02-26 2019-04-26 中国一冶集团有限公司 Last furnace shell cooling wall installation system and installation method
CN110241942A (en) * 2019-06-26 2019-09-17 吉林建筑大学 A kind of cold-rolled forming section faced wall of the anti-buckling support of the light-duty assembled of inner clip
CN113549718A (en) * 2021-07-19 2021-10-26 鞍钢建设集团有限公司 Replacement method of blast furnace cooling wall

Similar Documents

Publication Publication Date Title
CN204589214U (en) The installation thrustor of blast furnace cooling stave
CN204112715U (en) A kind of U-shaped adjustable holder support and template support frame body
CN207226920U (en) A kind of tower crane lifting body
CN204981053U (en) Liftable railing
CN105201074A (en) Replacing support seat for steel structure sliding construction and construction method
CN204476438U (en) For the ascending/decending chassis of tunnel roof-bolter construction
CN103832828A (en) Elevation LED panel mechanical arm
CN105571329A (en) Slag ladle lifting deslagging device
CN104675179A (en) Self-elevating type hanging bracket device for mounting steel tower and construction method for steel tower
CN103043434B (en) Stacking machine forward stock stop
CN104210958A (en) RH steel ladle vehicle-mounted lifting method and device
CN104073607B (en) Quenching cooling system and quenching and cooling method
CN105013826A (en) Roller dismounting device for sizing mill and dismounting method
CN204096901U (en) The hanging beam of mechanical type adjustable span
CN206847395U (en) A kind of improved vanadium titanium smelting feeding skid
CN203357420U (en) Simple bracket for pullers
CN204478031U (en) Central cylinder for circulating fluidized-bed boiler bracing or strutting arrangement
CN206322408U (en) A kind of analog simulation experimental device of drop shaft rolling ore deposit
CN105618728A (en) Molten steel filling opening demounting device
CN104561440A (en) Construction method for installing backing ring and furnace shell of converter
CN204879283U (en) Liftable seat frame of adjusting
CN104261270A (en) Gantry crane
CN103866064A (en) Suspension type cover manipulator
CN204646308U (en) A kind of transporting bracket device
CN204094375U (en) Be applicable to the weld jig of track

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180704

Address after: 617000 Bing Cao Gang in Panzhihua, Sichuan

Patentee after: CHINA 19TH METALLURGICAL GROUP Co.,Ltd.

Address before: 210000 No. 117, Zhenping Road, Banqiao street, Yuhuatai District, Nanjing, Jiangsu.

Patentee before: Nanjing Branch of China 19th Metallurgical Group Co.,Ltd.

TR01 Transfer of patent right