CN204578035U - Cable trench prefabricating module - Google Patents
Cable trench prefabricating module Download PDFInfo
- Publication number
- CN204578035U CN204578035U CN201420859304.9U CN201420859304U CN204578035U CN 204578035 U CN204578035 U CN 204578035U CN 201420859304 U CN201420859304 U CN 201420859304U CN 204578035 U CN204578035 U CN 204578035U
- Authority
- CN
- China
- Prior art keywords
- cable
- cable trench
- prefabricating module
- module
- trench prefabricating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Cable trench prefabricating module, according to the requirement of cable trough design size, the cable trench prefabricating module of different model specification is selected to carry out installation, it is characterized in that: cable trough base plate Prefabricated block (1) is connected with gutter channel (2), cable trough base plate Prefabricated block (1) is connected with the first cable trench prefabricating module (3) or the second cable trench prefabricating module (4), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected with expansion joint (5), expansion joint (5) and band iron (6), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected, band iron (6) and building sealant (7), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected, building sealant (7) and the first cable trench prefabricating module (3) second cable trench prefabricating module (4), expansion joint (5) is connected, expansion joint (5), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected with cable trough ditch rock Prefabricated block (8), cable trough ditch rock Prefabricated block (8) is connected with ditch rock rubber cushion (9).
Description
Technical field
The utility model cable trench prefabricating module is applicable to the indoor and outdoor cable trough such as market, hotel, office building, factory building of power plant, hydroelectric plant, current conversion station, transformer station, communication and heavy construction.
Background technology
According to national grid, south electric network is economized on water, save land, material-saving, energy-conservation and environmental protection green idea, improve construction criteria and construction object.Cable trench prefabricating module changes the construction Difficulties in the construction of brick thorough and concrete cast-in-situ, processing disadvantages, multiple traditional phenomenons such as danger point, stop body of wall shelling, crack, not bright and clean, the phenomenons such as the out of plumb at negative and positive angle, more effective solve cable trough rain draining difficulty and cable channel cover plate out-of-flatness, walk when tour personnel make an inspection tour and send the drawbacks such as sound on cable channel cover plate.
Summary of the invention
The purpose of this utility model is: improve construction criteria and construction object, shorten cable trough construction period, in construction, ensure that cable trough base plate is smooth, gutter channel arc standard, cable trough ditch body is vertically smooth, and expansion joint lattice is neat, and cable trough ditch rock Prefabricated block connects firmly with ditch rock rubber cushion, appearance color is clearly demarcated, exquisite attractive in appearance.
The technical solution of the utility model is: according to the requirement of cable trough design size, selects different model specification cable trench prefabricating module to carry out installation, it is characterized in that, cable trough base plate Prefabricated block (1) is connected with gutter channel (2), cable trough base plate Prefabricated block (1) is connected with the first cable trench prefabricating module (3) or the second cable trench prefabricating module (4), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected with expansion joint (5), expansion joint (5) and band iron (6), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected, band iron (6) and building sealant (7), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected, building sealant (7) and the first cable trench prefabricating module (3) second cable trench prefabricating module (4), expansion joint (5) is connected, expansion joint (5), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected with cable trough ditch rock Prefabricated block (8), cable trough ditch rock Prefabricated block (8) is connected with ditch rock rubber cushion (9).
The beneficial effects of the utility model are: after adopting cable trench prefabricating module, effectively shorten construction period, change traditional handicraft pattern, improve the many-sided drawback of cable trough.Cable trough gutter channel raining is fast, without ponding, ensure that the cable sanitation and hygiene of cable trough.Cable trough ditch body is vertically smooth, and expansion joint lattice standard is neat, and color is clearly demarcated, firm, exquisite attractive in appearance.
Accompanying drawing explanation
Fig. 1: adopt cable trench prefabricating module cutaway view.
In figure: 1, cable trough base plate Prefabricated block 2, gutter channel 3, (600mm*300mm*180mm) cable trench prefabricating module 4, (600mm*300mm*180mm) cable trench prefabricating module 5, expansion joint 6, band iron 7, building sealant 8, cable trough ditch rock module 9, ditch rock rubber cushion
Embodiment
1. clear up punching block: with instrument by end punching block, the foreign material on the internal molds such as side punching block, end punching block and residue clean up, and side punching block, end punching block are connected the fastening of Luo bolt with end punching block, ensure that joint close is tight.
2. concrete pouring vibrates: adopt mechanical agitation even by C35 concrete proportioning, draw in builder's temporary shed, manually enter mould, after filling concrete completes, start vibration machine switch and vibrate with skip car.
3. concrete coating: after having vibrated, wipes one's face with trowel, superelevation and any excess concrete is rooted out, and wipes one's face and puts down to punching block end face, and wiping one's face should be smooth closely knit smooth, and many traces phenomenon does not appear in surface layer.
4. the finished product demoulding: after concrete reaches design strength, can deviate from punching block, after removing side steel punching block, in dismounting cable trench prefabricating module, is transported to storage area stacking and carries out maintenance.
5. finished product maintenance: the cable trench prefabricating module through being up to the standards carries out gentle maintenance at storage space, surface adopts burlap etc. to carry out sunshade moisturizing, and 28 days curing periods can transport.
6. line setting: require line setting according to cable trough construction drawing, reduces the impact that accidental error is brought measurement result as far as possible, controls 3 ‰ slopes than degree, after line setting, repeatedly should check, and examine through authorities.
7. cubic metre of earth stone excavation: cable trough adopts mechanical equivalent of light excavation, and the construction method manually evened out, during mechanical equivalent of light excavation, should strictly control bottom of trench absolute altitude, at any time by bottom of trench flattening-out, compacting.Before hand excavation, carry out the long 2000mm of bottom of trench by workmen and fill essence fixed point, piling absolute altitude, guarantees that 3 ‰ slopes are more error free than degree.The transport cubic metre of earth and stone will stop the backfill soil cubic meter of stone, treats that cable trough lays and backfills.
8. ditch foot mat: wide by cable trough, long fixed point band line, adopts concrete mortar or coarse sand shop fixtures, the strict evenness controlling bottom of trench Prefabricated block, verticality, positive and negative can not more than 2mm.
9. cable trench prefabricating module install: when building cable trench prefabricating module by laying bricks or stones, by the size Selection of cable trough designing requirement, the fissure of displacement builds cable trench prefabricating module by laying bricks or stones, evenness, verticality, positive and negative can not more than 2mm.Cable trench prefabricating module reinforce adopt band iron or epoxy resin daub is even can.
10. expansion joint is filled: when filling building sealant, and adopt a point ruled paper to be pasted onto edge, cable trough concrete prefabricated module expansion joint, point accurate specification of ruled paper label adhering, building sealant is filled smooth bright and clean.
11. ditch rock rubber cushions: the long 5000mm of ditch rock rubber cushion, wide 30mm, thick 20mm, by cable trough length successively mounting groove rock rubber cushion, its Main Function ensures that cable channel cover plate is smooth when walking about without sound.
Claims (1)
1. a cable trench prefabricating module, it is combined by the Prefabricated block of several different model specification to be mounted to cable trough, it is characterized in that: cable trough base plate Prefabricated block (1) is connected with gutter channel (2), cable trough base plate Prefabricated block (1) is connected with the first cable trench prefabricating module (3) or the second cable trench prefabricating module (4), first cable trench prefabricating module (3), second cable trench prefabricating module (4) is connected with expansion joint (5), expansion joint (5) and band iron (6), first cable trench prefabricating module (3), second cable trench prefabricating module (4) is connected, band iron (6) and building sealant (7), first cable trench prefabricating module (3), second cable trench prefabricating module (4) is connected, building sealant (7) and the first cable trench prefabricating module (3), second cable trench prefabricating module (4), expansion joint (5) is connected, expansion joint (5), first cable trench prefabricating module (3), second cable trench prefabricating module (4) is connected with cable trough ditch rock Prefabricated block (8), cable trough ditch rock Prefabricated block (8) is connected with ditch rock rubber cushion (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420859304.9U CN204578035U (en) | 2014-12-18 | 2014-12-18 | Cable trench prefabricating module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420859304.9U CN204578035U (en) | 2014-12-18 | 2014-12-18 | Cable trench prefabricating module |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204578035U true CN204578035U (en) | 2015-08-19 |
Family
ID=53870630
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420859304.9U Expired - Fee Related CN204578035U (en) | 2014-12-18 | 2014-12-18 | Cable trench prefabricating module |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204578035U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112878283A (en) * | 2021-01-15 | 2021-06-01 | 中国电建集团成都勘测设计研究院有限公司 | Cable and drainage system for riverbed type workshop dam crest of hydropower station |
-
2014
- 2014-12-18 CN CN201420859304.9U patent/CN204578035U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112878283A (en) * | 2021-01-15 | 2021-06-01 | 中国电建集团成都勘测设计研究院有限公司 | Cable and drainage system for riverbed type workshop dam crest of hydropower station |
CN112878283B (en) * | 2021-01-15 | 2022-10-04 | 中国电建集团成都勘测设计研究院有限公司 | Cable and drainage system for riverbed type workshop dam crest of hydropower station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106182359B (en) | The horizontal molding die of concrete list storehouse pipe gallery, system and piping lane molding methods | |
CN106150001B (en) | A kind of fabricated assembly overall stair construction method | |
CN101906768B (en) | Panel construction method of concrete faced rock-fill dam | |
CN107059920B (en) | Loess formation piping lane construction technology | |
CN104594387A (en) | Improved post-pouring strip advanced water-stopping construction method | |
CN109853832A (en) | A kind of construction method of filling wall masonry and electrical pre-embedded pipe synchronous construction | |
CN107059917B (en) | Split component prefabricated comprehensive pipe gallery and construction method thereof | |
CN104213565B (en) | A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method | |
CN102937027A (en) | Construction method of edge top arch and bottom arch of concrete pouring tunnel | |
CN106381980B (en) | A kind of ground tile paving technique | |
CN105064579B (en) | A kind of construction method ensureing toilet water stopping thresholds platform pouring molding | |
CN106013509A (en) | Dry-method construction method for high-performance autolaved aerated concrete block wall | |
CN102518216A (en) | Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure | |
CN110424226A (en) | Kerbstone precast assembly side form and its construction technology | |
CN202347544U (en) | Advance water stop construction structure for post-cast strip of basement outer wall | |
CN104328790B (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
CN203839870U (en) | Wall-mounted concealed distribution box | |
CN204578035U (en) | Cable trench prefabricating module | |
CN108867822A (en) | A kind of constructing device and its construction method of anti-water Double-layer floor drain | |
CN103572786A (en) | Pile head joint waterproof processing device and construction method thereof | |
CN206623199U (en) | The horizontal mould of concrete list storehouse pipe gallery and system | |
CN114837038A (en) | Construction method of barrier pedestrian path permeable base layer by adopting paver | |
CN105649222A (en) | Treatment and construction method for connecting part of roof waterproof structure deformation joint and external wall | |
CN203924139U (en) | concrete component | |
CN204199302U (en) | The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
DD01 | Delivery of document by public notice |
Addressee: Sun Renchun Document name: Notification of Acceptance of Patent Application |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150819 Termination date: 20171218 |
|
CF01 | Termination of patent right due to non-payment of annual fee |