CN204577983U - A kind of coaster setting up leads span net - Google Patents

A kind of coaster setting up leads span net Download PDF

Info

Publication number
CN204577983U
CN204577983U CN201520269484.XU CN201520269484U CN204577983U CN 204577983 U CN204577983 U CN 204577983U CN 201520269484 U CN201520269484 U CN 201520269484U CN 204577983 U CN204577983 U CN 204577983U
Authority
CN
China
Prior art keywords
coaster
rope
sheave
rope sling
bayonet lock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520269484.XU
Other languages
Chinese (zh)
Inventor
王栋
王峰
竹瑞博
张峰
武汉伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Information and Telecommunication Branch of State Grid Shanxi Electric Power Co Ltd
Original Assignee
Information and Telecommunication Branch of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Information and Telecommunication Branch of State Grid Shanxi Electric Power Co Ltd filed Critical Information and Telecommunication Branch of State Grid Shanxi Electric Power Co Ltd
Priority to CN201520269484.XU priority Critical patent/CN204577983U/en
Application granted granted Critical
Publication of CN204577983U publication Critical patent/CN204577983U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a kind of coaster setting up leads span net, is made up of coaster body, top sheave, lower sheave, upper rotating shaft, lower rotary shaft, upper cover plate, lower cover, upper bayonet lock, lower bayonet lock, rope sling buckle and middle set bolt.Upper rotating shaft and lower rotary shaft are arranged at the two ends of coaster body respectively, and top sheave is arranged in rotating shaft, and lower sheave is arranged on lower rotary shaft; Middle set bolt is positioned at the centre of coaster body, and coaster body is separated into upper and lower two parts, and upper cover plate and upper bayonet lock are deviate from for preventing the wire on top sheave or rope, and lower cover and lower bayonet lock are deviate from for preventing the wire on lower sheave or rope; Coaster body is also provided with a rope sling buckle, is connected with coaster for rope sling will be connected.Coaster of the present utility model can by unfolding at circuit to be replaced fast, and form a wire traction passage, the leap net taking crossing frame and unfolding complexity compared with traditional construction saves construction manpower and time.

Description

A kind of coaster setting up leads span net
Technical field
The utility model relates to a kind of equipment for installing rack hollow wire or cable, is specifically related to a kind of coaster setting up leads span net, belongs to power transmission and transformation line technical field of construction equipment.
Background technology
Transmission line in the wild often crosses over village platform and electric power, communication line, highway, navigable river, house housing-group etc.When transmission line changes aerial condutor operation, for ensureing construction safety, need to cross on thing at these to set up leap net or crossing frame, but the human and material resources needing cost a large amount of set up by traditional leap rack, and face the problem of addressing difficulty toward contact, thus cause operating efficiency low.
In view of this, the utility model provides a kind of coaster setting up leads span net, to solve the problem.
Summary of the invention
The utility model object is overcome above-mentioned the deficiencies in the prior art and provide a kind of coaster setting up leads span net, and the leap net taking crossing frame and unfolding complexity compared with traditional construction saves construction manpower and time.
The technical scheme that the utility model adopts is: a kind of coaster setting up leads span net, be made up of coaster body, top sheave, upper rotating shaft, lower sheave, lower rotary shaft, upper cover plate, upper bayonet lock, lower cover, lower bayonet lock, rope sling buckle and middle set bolt, it is characterized in that: upper rotating shaft and lower rotary shaft are arranged at the two ends of coaster body respectively, top sheave is arranged in rotating shaft, and lower sheave is arranged on lower rotary shaft; Middle set bolt is positioned at the centre of coaster body, and coaster body is separated into upper and lower two parts, and upper cover plate and upper bayonet lock are deviate from for preventing the wire on top sheave or rope, and lower cover and lower bayonet lock are deviate from for preventing the wire on lower sheave or rope; Coaster body is also provided with a rope sling buckle, is connected with coaster for rope sling will be connected.
The coaster of erection leads span net as above, is characterized in that, described coaster by rope sling buckle with is connected rope sling one end and connects, the other end of connection rope sling connects the rope sling buckle of adjacent coaster, and by multiple connected coaster formation lead channels.
The beneficial effects of the utility model are: due to the utilization of such scheme technology, and the utility model comparatively prior art has following advantage:
1, leap net saving construction manpower and the time of crossing frame and unfolding complexity is taken compared with traditional construction;
Occur that wire is entwined when 2, coaster being separated into the anti-limited slip wheels upset of two lead channels by middle set bolt;
3, by connecting the fixing of rope sling, make the position of coaster on wire relatively stable, thus it is steady to ensure that in unfolding conductor process.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is application schematic diagram of the present utility model.
Embodiment
In order to understand the utility model better, illustrate content of the present utility model further below in conjunction with embodiment, but content of the present utility model is not only confined to the following examples.Those skilled in the art can make various changes or modifications the utility model, and these equivalent form of values are equally within claims limited range listed by the application.
Symbol description in accompanying drawing: under 1-coaster body, 2-top sheave, the upper rotating shaft of 3-, 4-lower sheave, 5-lower rotary shaft, 6-rope sling buckle, 7-upper cover plate, the upper bayonet lock of 8-, 9-lower cover, 10-, in the middle of bayonet lock, 11-, set bolt, 12-wire to be replaced, 13-bearing rope, 14-connect rope sling.
As shown in Figures 1 and 2, a kind of coaster setting up leads span net that the utility model provides, is made up of coaster body 1, top sheave 2, upper rotating shaft 3, lower sheave 4, lower rotary shaft 5, upper cover plate 7, upper bayonet lock 8, lower cover 9, lower bayonet lock 10, rope sling buckle 6 and middle set bolt 11;
Upper rotating shaft 3 and lower rotary shaft 5 are arranged at the two ends of coaster body 1 respectively, and top sheave 2 is arranged in rotating shaft 3, and lower sheave 4 is arranged on lower rotary shaft 5.
Middle set bolt 11 is positioned at the centre of coaster body 1, coaster body 1 is separated into upper and lower two parts, upper cover plate 7 and upper bayonet lock 8 are deviate from for preventing the wire on top sheave 2 or rope, and lower cover 9 and lower bayonet lock 10 are deviate from for preventing the wire on lower sheave 4 or rope.In the present embodiment, wire 12 to be replaced is placed on top sheave 2, and bearing rope 13 is placed on lower sheave 4.
Coaster body 1 is also provided with a rope sling buckle 6, is connected with coaster for rope sling 14 will be connected.
Coaster by rope sling buckle 6 with is connected rope sling 14 one end and connects, the other end of connection rope sling 14 connects the rope sling buckle 6 of adjacent coaster, and by multiple connected coaster formation lead channels.
Introduce operational method below in conjunction with the utility model application schematic diagram, comprise the steps:
1) with connecting rope sling 14, coaster being connected, lower sheave 4 being fixed bearing rope 13, successively top sheave 2 is hung on wire 12 to be replaced;
2) by pull rope, coaster and bearing rope 13 are pulled through leap thing, adjustment bearing rope 13 highly makes pulley overturn, by bearing rope 13 be connected rope sling 14 two and fix, thus make the coaster on rope form a wire to draw passage;
3) pass through, with the new method of old band, to draw wire 12 to be replaced and steadily unfold from coaster passage with new wire;
4) change complete, adjustment bearing rope 13, makes pulley again overturn, and regains coaster and bearing rope 13.
These are only embodiment of the present utility model, be not limited to the utility model, therefore, all within spirit of the present utility model and principle, any amendment of making, equivalent replacement, improvement etc., all should be included within right of the present utility model.

Claims (2)

1. one kind is set up the coaster of leads span net, be made up of coaster body, top sheave, upper rotating shaft, lower sheave, lower rotary shaft, upper cover plate, upper bayonet lock, lower cover, lower bayonet lock, rope sling buckle and middle set bolt, it is characterized in that: upper rotating shaft and lower rotary shaft are arranged at the two ends of coaster body respectively, top sheave is arranged in rotating shaft, and lower sheave is arranged on lower rotary shaft; Middle set bolt is positioned at the centre of coaster body, and coaster body is separated into upper and lower two parts, and upper cover plate and upper bayonet lock are deviate from for preventing the wire on top sheave or rope, and lower cover and lower bayonet lock are deviate from for preventing the wire on lower sheave or rope; Coaster body is also provided with a rope sling buckle, is connected with coaster for rope sling will be connected.
2. the coaster of erection leads span net according to claim 1, it is characterized in that, described coaster by rope sling buckle with is connected rope sling one end and connects, the other end of connection rope sling connects the rope sling buckle of adjacent coaster, and by multiple connected coaster formation lead channels.
CN201520269484.XU 2015-04-30 2015-04-30 A kind of coaster setting up leads span net Expired - Fee Related CN204577983U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520269484.XU CN204577983U (en) 2015-04-30 2015-04-30 A kind of coaster setting up leads span net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520269484.XU CN204577983U (en) 2015-04-30 2015-04-30 A kind of coaster setting up leads span net

Publications (1)

Publication Number Publication Date
CN204577983U true CN204577983U (en) 2015-08-19

Family

ID=53870578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520269484.XU Expired - Fee Related CN204577983U (en) 2015-04-30 2015-04-30 A kind of coaster setting up leads span net

Country Status (1)

Country Link
CN (1) CN204577983U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105207119A (en) * 2015-09-12 2015-12-30 国网辽宁省电力有限公司锦州供电公司 Electrified span construction method for high-voltage wires and protective device of construction
CN105591315A (en) * 2015-12-30 2016-05-18 国家电网公司 Steering pulley for net blocking during high-voltage power transmission construction
CN108075397A (en) * 2017-12-07 2018-05-25 中国南方电网有限责任公司超高压输电公司广州局 Mobile corner block
CN111252618A (en) * 2020-03-27 2020-06-09 广东电网有限责任公司 Traction assembly
CN113644589A (en) * 2021-05-25 2021-11-12 国网河北省电力有限公司邯郸供电分公司 Totally-enclosed construction protection pulley for high-voltage transmission line

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105207119A (en) * 2015-09-12 2015-12-30 国网辽宁省电力有限公司锦州供电公司 Electrified span construction method for high-voltage wires and protective device of construction
CN105591315A (en) * 2015-12-30 2016-05-18 国家电网公司 Steering pulley for net blocking during high-voltage power transmission construction
CN105591315B (en) * 2015-12-30 2018-03-20 国家电网公司 Block corner block during a kind of high voltage power transmission construction
CN108075397A (en) * 2017-12-07 2018-05-25 中国南方电网有限责任公司超高压输电公司广州局 Mobile corner block
CN111252618A (en) * 2020-03-27 2020-06-09 广东电网有限责任公司 Traction assembly
CN113644589A (en) * 2021-05-25 2021-11-12 国网河北省电力有限公司邯郸供电分公司 Totally-enclosed construction protection pulley for high-voltage transmission line

Similar Documents

Publication Publication Date Title
CN204577983U (en) A kind of coaster setting up leads span net
CN205820581U (en) Earth lead combination draw off gear
CN104361168B (en) 500kV AC linear shaft tower Electric Field Simulation methods
CN202949172U (en) Tower rod and conducting wire foreign matter live-line enucleator
CN202429945U (en) Hoisting device for power supply facility
CN203932808U (en) Replacing insulator under electrified wire lifting device
CN203367868U (en) Multifunctional insulation hook
CN103247972B (en) Wire tractor
CN201502207U (en) High-voltage pole for aerial lines
CN202474691U (en) Pulley component for overturning type tackle device
CN204571449U (en) A kind of EHV transmission steel tube tower cross-arm
CN204089028U (en) A kind of electric power transmission cable falsework device
CN203911394U (en) Simple combined bridge
CN202401814U (en) Angle tower
CN102383639A (en) Compactly structured pole tower
CN202970094U (en) Guyed tower applied to transmission line project
CN201408937Y (en) Wire lifting device for crane
CN207353756U (en) A kind of transmission tower Portable overhaul pedal
CN202905989U (en) 10 kV multipurpose ground wire
CN204400315U (en) A kind of compound combined electrical equipment wire-outlet rack
CN205104836U (en) Novel insulating coaster
CN204703578U (en) Bar stepped on by gate framework type cable
CN205908091U (en) Exchange two tangent towers that return
CN205666545U (en) Line ware is carried to two split conductors of detachable anti -induction electricity vertical arrangement
CN204400314U (en) A kind of interval distribution equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20160430

CF01 Termination of patent right due to non-payment of annual fee