CN204551563U - A kind of Novel water conservancy project desilting equipment - Google Patents

A kind of Novel water conservancy project desilting equipment Download PDF

Info

Publication number
CN204551563U
CN204551563U CN201520023546.9U CN201520023546U CN204551563U CN 204551563 U CN204551563 U CN 204551563U CN 201520023546 U CN201520023546 U CN 201520023546U CN 204551563 U CN204551563 U CN 204551563U
Authority
CN
China
Prior art keywords
desilting
arm
clearing device
accrete clearing
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520023546.9U
Other languages
Chinese (zh)
Inventor
戴乃昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Polytechnic
Original Assignee
Wenzhou Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Polytechnic filed Critical Wenzhou Polytechnic
Priority to CN201520023546.9U priority Critical patent/CN204551563U/en
Application granted granted Critical
Publication of CN204551563U publication Critical patent/CN204551563U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

A kind of Novel water conservancy project desilting equipment, is made up of Accrete clearing device, handle, hull, mechanical arm, silt outlet, valve, casing, operating room, hydraulic means, torque arm, hydraulic axis, connecting axle, scraper bowl, long slab, tire, Lian Bing, hinge, desilting arm, major axis and tip.Described hull is provided with two hydraulic means, the hydraulic means on the left side connects an Accrete clearing device, and the hydraulic means on the right connects a hydraulic axis; Described hull is also provided with casing and an operating room; The bottom of described hull is provided with wheel; Described Accrete clearing device is connected with mechanical arm, and Accrete clearing device is hollow, centre have a major axis with connect handle be connected, major axis is provided with hinge, hinge is connected with desilting arm, and desilting draws in pull-out by handle in Accrete clearing device, and desilting arm increases from top to bottom successively; The described casing lower left corner is provided with silt outlet, and silt outlet is provided with valve; The wheel of described hull bottom is combined by long slab and forms together, and tire can be enclosed within long slab.

Description

A kind of Novel water conservancy project desilting equipment
Technical field
The utility model relates to channel cleanout mechanical equipment technical field, is specially a kind of Novel water conservancy project desilting equipment.
Background technology
In various river course, there is some silts or mud, in river course hydraulic engineering, must be cleared up these silts or mud, and existing Accrete clearing device much adopts is by ducted silt sucking-off, random discharge, easily causes environment pollution, simultaneously, existing desilting equipment volume is large, price is high, mobile difficulty, desilting cost is very high, and operating process is also very complicated, waste a large amount of manpower, financial resources, desilting efficiency data is very low simultaneously.
Utility model content
The purpose of this utility model is to provide a kind of Novel water conservancy project desilting equipment, has desilting thoroughly efficient, can operate in water, the advantage such as also can to travel by land.
The utility model adopts following technical scheme:
A kind of Novel water conservancy project desilting equipment, is made up of Accrete clearing device, handle, hull, mechanical arm, silt outlet, valve, casing, operating room, hydraulic means, torque arm, hydraulic axis, connecting axle, scraper bowl, long slab, tire, Lian Bing, hinge, desilting arm, major axis and tip.
Described hull is provided with two hydraulic means, the hydraulic means on the left side connects an Accrete clearing device, and the hydraulic means on the right connects a hydraulic axis.
Described hull is also provided with casing and an operating room.
The bottom of described hull is provided with wheel.
Described Accrete clearing device is connected with mechanical arm, and Accrete clearing device is hollow, centre have a major axis with connect handle be connected, major axis is provided with hinge, hinge is connected with desilting arm, and desilting draws in pull-out by handle in Accrete clearing device, and desilting arm increases from top to bottom successively.
The described casing lower left corner is provided with silt outlet, and silt outlet is provided with valve.
The wheel of described hull bottom is combined by long slab and forms together, and tire can be enclosed within long slab.
Described hull is that the good material of a kind of buoyancy is made.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model partial schematic diagram.
In figure: 1. Accrete clearing device, 2. handle, 3. hull, 4. mechanical arm, 5. silt outlet, 6. valve, 7. casing, 8. operating room, 9. hydraulic means, 10. torque arm, 11. hydraulic axis, 12. connecting axles, 13. scraper bowls, 14. long slabs, 15. tires, 16. connect handle, 17. hinges, 18. desilting arms, 19. major axis, 20. tips.
Detailed description of the invention
Below in conjunction with accompanying drawing and detailed description of the invention, the utility model is described further.
The utility model as shown in Figure 1 and Figure 2, a kind of Novel water conservancy project desilting equipment, by Accrete clearing device 1, handle 2, hull 3, mechanical arm 4, silt outlet 5, valve 6, casing 7, operating room 8, hydraulic means 9, torque arm 10, hydraulic axis 11, connecting axle 12, scraper bowl 13, long slab 14, tire 15, even handle 16, hinge 17, desilting arm 18, major axis 19 and tip 20 form.
Described hull 3 is provided with two hydraulic means 9, the hydraulic means 9 on the left side connects an Accrete clearing device 1, Accrete clearing device 1 is connected with mechanical arm 4, Accrete clearing device 1 is hollow, centre have a major axis 19 with connect handle 16 be connected, major axis 19 is provided with hinge 17, hinge 17 is connected with desilting arm 18, desilting arm 18 draws in pull-out by handle 2 in Accrete clearing device 1, and desilting arm 18 increases from top to bottom successively, when carrying out desilting to hydraulic engineering, desilting arm 18 can be regulated to stretch out the length of Accrete clearing device 1 by handle 2, and from tip 20 to desilting arm 18, size increases from top to bottom successively, desilting amount increases successively, decrease resistance, improve desilting efficiency data.
The hydraulic means 9 on described the right connects a hydraulic axis 11, and hydraulic axis 11 is connected with scraper bowl 13 by connecting axle 12.
Described hydraulic axis 11 is provided with torque arm 10, after long-pending silt thing is gathered in one piece by desilting arm 18, by scraper bowl 13, long-pending silt thing is shoveled into casing 7, water engineering facility is normally run.
Described casing 7 lower left corner is provided with silt outlet 5, silt outlet 5 is provided with valve 6, after long-pending silt thing is transported to assigned address, by opening valve 6, long-pending silt logistics can be made to go out casing 7, and then carry out desilting next time.
Described hull 3 is also provided with an operating room 8, staff can complete desilting work in operating room 8.
The bottom of described hull 3 is provided with wheel, wheel is combined by long slab 14 and forms together, tire 15 can be enclosed within long slab 14, after removing tire 15, long slab 14 just can use as quant in water, and just can use as wheel on land after setting up tire 15, desilting equipment had both gone for operating in water, also can at land locomotion, very practical.
Described hull 3 is made for the good material of a kind of buoyancy, works and can provide larger buoyancy in water.

Claims (5)

1. a Novel water conservancy project desilting equipment, by Accrete clearing device (1), handle (2), hull (3), mechanical arm (4), silt outlet (5), valve (6), casing (7), operating room (8), hydraulic means (9), torque arm (10), hydraulic axis (11), connecting axle (12), scraper bowl (13), long slab (14), tire (15), connect handle (16), hinge (17), desilting arm (18), major axis (19) and tip (20) composition, it is characterized in that: described hull (3) is provided with two hydraulic means (9), the hydraulic means (9) on the left side connects an Accrete clearing device (1), the hydraulic means (9) on the right connects a hydraulic axis (11), described hull (3) is also provided with casing (7) and an operating room (8), the bottom of described hull (3) is provided with wheel.
2. a kind of Novel water conservancy project desilting equipment according to claim 1, it is characterized in that: described Accrete clearing device (1) is connected with mechanical arm (4), Accrete clearing device (1) is for hollow, centre has a major axis (19) to be connected with company's handle (16), major axis (19) is provided with hinge (17), hinge (17) is connected with desilting arm (18), desilting arm (18) draws in pull-out by handle (2) in Accrete clearing device (1), and desilting arm (18) increases from top to bottom successively.
3. a kind of Novel water conservancy project desilting equipment according to claim 1, it is characterized in that: the hydraulic means (9) on described the right is connected with hydraulic axis (11), hydraulic axis (11) is connected with scraper bowl (13) by connecting axle (12), described hydraulic axis (11) is provided with torque arm (10).
4. a kind of Novel water conservancy project desilting equipment according to claim 1, is characterized in that: described casing (7) lower left corner is provided with silt outlet (5), silt outlet (5) is provided with valve (6).
5. a kind of Novel water conservancy project desilting equipment according to claim 1, it is characterized in that: the wheel of described hull (3) bottom is combined by long slab (14) and forms together, and tire (15) can be enclosed within long slab (14).
CN201520023546.9U 2015-01-01 2015-01-01 A kind of Novel water conservancy project desilting equipment Expired - Fee Related CN204551563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520023546.9U CN204551563U (en) 2015-01-01 2015-01-01 A kind of Novel water conservancy project desilting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520023546.9U CN204551563U (en) 2015-01-01 2015-01-01 A kind of Novel water conservancy project desilting equipment

Publications (1)

Publication Number Publication Date
CN204551563U true CN204551563U (en) 2015-08-12

Family

ID=53826696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520023546.9U Expired - Fee Related CN204551563U (en) 2015-01-01 2015-01-01 A kind of Novel water conservancy project desilting equipment

Country Status (1)

Country Link
CN (1) CN204551563U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016201685A1 (en) * 2015-06-18 2016-12-22 刘惠河 Dredging device
CN106892063A (en) * 2015-12-17 2017-06-27 宁波荣辉纳米技术有限公司 A kind of multi-functional oil transfer arm maintenance ship
CN108755806A (en) * 2018-08-08 2018-11-06 张云成 A kind of pump dredger

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016201685A1 (en) * 2015-06-18 2016-12-22 刘惠河 Dredging device
CN106892063A (en) * 2015-12-17 2017-06-27 宁波荣辉纳米技术有限公司 A kind of multi-functional oil transfer arm maintenance ship
CN108755806A (en) * 2018-08-08 2018-11-06 张云成 A kind of pump dredger
CN108755806B (en) * 2018-08-08 2021-01-08 张云成 Mud pumping machine

Similar Documents

Publication Publication Date Title
CN204551563U (en) A kind of Novel water conservancy project desilting equipment
CN104563184A (en) Dredging equipment
CN203654447U (en) Upward mud suction device for drainage pipeline dredging robot
CN205296382U (en) High -efficient drain pipe silt remover
CN201291215Y (en) Portable small handbill cleaner
CN203755438U (en) Portable winch dredging device
CN202544746U (en) Self-propelled machine integrating pile driving-and-extracting with boring
CN203246268U (en) Land running wheel for mine
CN202208902U (en) Ice and snow shoveling device
CN205288548U (en) Civil engineering construction waste processing apparatus
CN204871152U (en) Shallow for building
CN203475372U (en) Obstacle-crossing snow removal shovel for removing compacted snow on roads
CN206467607U (en) A kind of new construction project environment-protective desilting device
CN204023390U (en) A kind of excavator with pavement breaking function
CN205872131U (en) Civil engineering is with handcart of conveniently empting
CN203158619U (en) Multifunctional garbage truck
CN204000733U (en) Snow and ice clear away machine
CN102677621A (en) Cleaning shovel for removing snow and cleaning mud of road
CN204703115U (en) The device of a kind of snow pushing and snow receiving
CN202450477U (en) Stress snow cleaning device
CN203741764U (en) Stress snow throwing device
CN204801843U (en) Dumper for construction
CN204173946U (en) Thiophenols peptizer Wastewater by Solvent Extraction reclaims dimethyl formamide device
CN202559520U (en) Sewage suction pipe head with air guide groove
CN204160342U (en) Micropore foreign material gripping tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20160101