CN2045388U - Cas preheating device for blast furnace hot blast stove - Google Patents

Cas preheating device for blast furnace hot blast stove Download PDF

Info

Publication number
CN2045388U
CN2045388U CN 89200297 CN89200297U CN2045388U CN 2045388 U CN2045388 U CN 2045388U CN 89200297 CN89200297 CN 89200297 CN 89200297 U CN89200297 U CN 89200297U CN 2045388 U CN2045388 U CN 2045388U
Authority
CN
China
Prior art keywords
gas
raw gas
hot blast
blast furnace
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN 89200297
Other languages
Chinese (zh)
Inventor
高光春
秦元柱
张万仲
游开铸
周凤翔
董延君
刘荣辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshan Iron & Steel Co Design And Research Institute
Anshan Steel Corp Iron Works
Angang Steel Co Ltd
Original Assignee
Anshan Iron & Steel Co Design And Research Institute
Anshan Steel Corp Iron Works
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anshan Iron & Steel Co Design And Research Institute, Anshan Steel Corp Iron Works, Angang Steel Co Ltd filed Critical Anshan Iron & Steel Co Design And Research Institute
Priority to CN 89200297 priority Critical patent/CN2045388U/en
Publication of CN2045388U publication Critical patent/CN2045388U/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model discloses a gas preheating device for a blast furnace and a hot blast furnace, comprising a raw gas inlet, a box body, a square double-layer corrugated expander, a purified gas inlet, a guide box body, an airflow guide pipe, a purified gas outlet, a main box body, a heating pipe and a venturi-shaped raw gas outlet which are welded together. The gas preheating device can be arranged on a gas pipeline arranged between the gravity dust collector and the tower of the blast furnace so as to preheat purified gas burned by the hot blast furnace; when the temperature of the raw gas inlet is 40-50 DEG C, the temperature of the purified gas is increased to 250-280 DEG C, so that the purposes of increasing hot air temperature, decreasing coke and increasing iron is achieved.

Description

Cas preheating device for blast furnace hot blast stove
The utility model is to belong to the heat-exchanger rig that utilizes blast furnace raw gas sensible heat to come preheating blast funnace hot blast stove purified gas.
Before the utility model is not made,, all have the precedent that adopts tubular type, board-like, heat pipe-type, rotary type and heating agent formula interchanger, and all obtained good effect as far back as thermal power generation and chemical system.Also adopted heat pipe, separate heat pipe and heating agent formula interchanger in addition on iron-smelting process, they are to utilize the flue residue heat of hotblast stove to come warm-up combustion-supporting air and coal gas.The hot-blast stove flue dustiness is at 3g/m 3Below, so interchanger does not have fouling phenomenon, yet utilize blast furnace raw gas preheating heat wind furnace purified gas situation just completely different.Be characterized in the temperature height, about about 400 ℃, dustiness is big, about 10g/m 3About.Utilize aforesaid device can't solve life problems and safeguard ordinary production.
The main purpose of the design's utility model provides a kind of high-level efficiency interchanger that utilizes blast furnace raw gas preheating purified gas.And have simple in structure, long service life, characteristics such as cost is low, and easy to manufacture and maintenance workload is low.Thereby the raising wind-warm syndrome with less energy-consumption, improves blase furnace cast iron output.
The utility model structure is such: be arranged with many seamless steel tube for boiler by certain distance in metal cabinet, steel pipe bundle can divide single group or many groups according to needs are installed, but two must be fixed every steel pipe respectively with two block plates, make restrain into as a whole.According to being heated gas speed or importing and exporting the needs of pipe connection position, available steel plate is separated into two or several sections in the middle of the tube bank.Circumferential weld between dividing plate and the every steel pipe must be dead with the electric welding weldering.The stationary tubesheet on tube bank top is not connected each other with upper body, and the two bellow expander that passes through separately simultaneously directly connects with the raw gas inlet tank.Thereby guaranteed free expansion separately.The gangway of purified gas can be installed in the homonymy or the both sides of casing as required.Homonymy, then casing must be separated into two sections, is provided with the air-flow side of guiding laddertron between two sections and connects.Both sides then must be separated into three sections in the casing, section with section between also be provided with the air-flow side of guiding laddertron and be connected.The retaining plate of tube bank bottom and lower part box and raw gas outlet weld together simultaneously, and directly are seated on the framework.How many tube bank of whole heat-exchanger rig what, sizes of length, size, thickness and whole heat-exchanger rig be by deciding of what and raw gas dustiness of raw gas and clean coal tolerance.
In order to hang down the wearing and tearing of the high high speed raw gas of dustiness to steel pipe, the raw gas ingress of every steel pipe all is provided with a removable toroidal sleeve pipe.
In order to guarantee this device bottom not dust stratification or the dust stratification less of trying one's best, under device, be welded with the ash stop plate of different inner diameters in the raw gas outlet liaison tube, the global shape of its arrangement such as venturi-shaped.Thereby increased gas flow rate, taken away dust, avoided line clogging.
This device is inflammable, the explosive and deleterious blast furnace gas of preheating, and this body structure is bigger, so the intensity and the severity requirement of device itself have been paid special attention in design.Consider the needs of body maintenance and inspection simultaneously and be provided with manhole, diffused requisite measures such as valve.
The heat exchange of this device is achieved in that pyritous blast furnace raw gas enters heat-exchanger rig by upper entrance, and by in the every steel pipe, the heat transferred steel pipe, flows out heat-exchanger rig to washing tower by lower part outlet again.Cryogenic purified gas is entered by lateral bottom inlet, from bottom to up one by one by each section of casing, simultaneously by the tube bank heating, after flowed out by the top outlet, delivers to blast furnace and hot blast cupola combustion.
Application of the present utility model has obtained tangible economic benefit.When raw gas temperature during at 300~400 ℃, the purified gas initial temperature is in the time of 40~50 ℃, and by behind this device, the raw gas temperature can be reduced to 210~220 ℃, the purified gas temperature can be preheating to 250~280 ℃, thereby has reduced the needed water loss 50% of temperature that the blast furnace raw gas enters washing tower; Improved and utilized purified gas incendiary Combustion of Hot Air Furnace temperature, hot blast temperature is reached more than 1150 ℃, make ton iron energy consumption reduce by 4%, output improves 3%, facts have proved advantage such as that this device has is simple in structure, manufacturing process is easy, cost is low, the coefficient of heat transfer is big, be difficult for dust stratification, long service life and remarkable in economical benefits.
Accompanying drawing is to have described an embodiment of the present utility model.
Accompanying drawing is the work synoptic diagram of embodiment.
This device upper box 1 welds together with double-deck square bellow expander 3, the skin of double-deck as seen from the figure square bellow expander is welded together with raw gas inlet casing 1 and purified gas guiding casing 5, and internal layer be with raw gas inlet casing 1 and fixedly steel pipe plate 14 weld together, removable toroidal steel bushing 2 is plugged on heat exchange steel pipe 4, it is that venturi-shaped distributes that the ash stop plate 7 of different inner diameters is arranged global shape, be welded in the outlet liaison tube 13, unloading valve 12 is arranged at the bottom, be fixed by bolts on the lower box 9 storage ash pipes, be provided with the coal gas side of guiding laddertron 8 in the purified gas guiding case 5, purified gas gangway pipe 11 and 10 all adopts welding process composition one with other parts.Blast funnace hot blast stove gas preheating device does not leak to qualified to suppress.

Claims (4)

1, a kind of blast funnace hot blast stove gas preheating device, it is characterized in that: by raw gas inlet casing 1, the double-deck bellow expander 3 of square is provided with the coal gas side of guiding laddertron 8 in the purified gas guiding case 5, main box 6, raw gas outlet casing 9, toroidal sleeve pipe 2 and heating steel pipe 4, steel pipe retaining plate 14, purified gas inlet tube 10, purified gas outlet 11, unloading valve 12, raw gas outlet liaison tube 13 is formed with ash stop plate 7 welding that are welded in Different Diameter in the pipe.
2, the skin that it is characterized in that the double-deck bellow expander 3 of square according to the described blast funnace hot blast stove gas preheating of claim 1 device and raw gas inlet casing 1 and the purified gas casing 5 that leads welds together; The internal layer of the double-deck bellow expander 3 of square and raw gas inlet casing 1 and steel pipe retaining plate 14 are welded together.
3, it is characterized in that according to the described blast funnace hot blast stove gas preheating of claim 1 device the raw gas ingress of every heat exchange steel pipe 4 all is provided with removable toroidal wear-resistant sleeve 2.
4, it is characterized in that according to the described blast funnace hot blast stove gas preheating of claim 1 device raw gas exports the ash stop plate 7 of the different inner diameters of burn-oning in the liaison tube 13, its overall alignment is shaped as venturi-shaped.
CN 89200297 1989-01-05 1989-01-05 Cas preheating device for blast furnace hot blast stove Withdrawn CN2045388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 89200297 CN2045388U (en) 1989-01-05 1989-01-05 Cas preheating device for blast furnace hot blast stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 89200297 CN2045388U (en) 1989-01-05 1989-01-05 Cas preheating device for blast furnace hot blast stove

Publications (1)

Publication Number Publication Date
CN2045388U true CN2045388U (en) 1989-10-04

Family

ID=4858415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 89200297 Withdrawn CN2045388U (en) 1989-01-05 1989-01-05 Cas preheating device for blast furnace hot blast stove

Country Status (1)

Country Link
CN (1) CN2045388U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1053701C (en) * 1997-01-24 2000-06-21 冶金工业部鞍山热能研究院 Technology for double preheating by using blast-furnace hot-blast stove gas, and combustion-supporting air
CN103383144A (en) * 2013-08-06 2013-11-06 叙永县马岭粮油食品有限公司 Hot blast stove

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1053701C (en) * 1997-01-24 2000-06-21 冶金工业部鞍山热能研究院 Technology for double preheating by using blast-furnace hot-blast stove gas, and combustion-supporting air
CN103383144A (en) * 2013-08-06 2013-11-06 叙永县马岭粮油食品有限公司 Hot blast stove

Similar Documents

Publication Publication Date Title
CN105570956B (en) A kind of residual heat from boiler fume circulating heat supply system
CN107860022A (en) One kind becomes flue cross section tubular air preheater
CN105042622A (en) Air preheater based one air-water heat exchange
CN101706109B (en) Embedded deep cooler for boiler flue gas
CN210625377U (en) Tunnel cave waste heat recovery utilizes device
CN205878964U (en) Heat exchanger for waste heat recovery
CN201513909U (en) Boiler fume deep cooler
CN110145947A (en) A kind of high temperature and pressure compressed air heat exchanger structure
CN206399178U (en) Top formula hot air blast furnace
CN201093900Y (en) Compact type two return-stroke flue tube flue gas condensing energy conservation equipment
CN100520268C (en) Fume-fume hot pipe heater exchanger for fume desulphurization in heat-engine plant
CN2045388U (en) Cas preheating device for blast furnace hot blast stove
CN106016238A (en) Heat exchanger for waste heat recovery of coal-fired boiler
CN201496991U (en) Split-type steam air pre-heater
CN203349676U (en) Chimney recovering waste heat of boiler smoke
CN202246548U (en) Dry quenching preheater
CN202188627U (en) Safe and energy-saving angle pipe hot-water boiler
CN205137516U (en) Air heater based on air water heat transfer
CN201740358U (en) Drying tower system
CN201662222U (en) Gas-liquid double-phase organic heat carrier boiler
CN201764862U (en) High-temperature heat exchanger
CN209689432U (en) A kind of heat exchange of catalytic cracking unit desulfurization fume takes hot systems
CN2291629Y (en) Split coal-fired hot-blast furnace
CN204987072U (en) Improve heat transfer device of boiler air inlet temperature
CN214308302U (en) Horizontal parallel arrangement heat storage device based on heat pipes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
RN01 Renewal of patent term
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee