A kind of electric force monitoring apparatus realizing timing automatic and patrol and examine
Technical field
The utility model relates to a kind of electric force monitoring apparatus, is specifically related to a kind of electric force monitoring apparatus realizing timing automatic and patrol and examine.
Background technology
At present, the data monitoring for power equipment is safeguarded by adopting manpower periodically to carry out with detecting, and needs to expend more human resources and time, and the quality of the quality of data monitoring and detection maintenance and efficiency dependence attendant.Safety in utilization and the normalization of power equipment will be reduced so to a certain extent.
Utility model content
For the deficiencies in the prior art, the utility model aims to provide and a kind ofly to realize in real time, automatically set the power monitoring that power equipment information carries out Scanning Detction, by arranging automaticdata transmission, data store, the integral structure of data scanning analysis and alarm, make power monitoring no longer only rely on manpower to carry out, more accurately and reliably.
To achieve these goals, the utility model adopts following technical scheme:
A kind of electric force monitoring apparatus realizing timing automatic and patrol and examine, comprise power monitoring terminal, also comprise timing inspection device, form primarily of information receiving unit, data storage cell, data analysis unit and Alarm Unit, connect successively between four, described data analysis unit is also connected with timer; Described information receiving unit is connected with the information output mouth communication of power equipment, and described Alarm Unit is then also connected to power monitoring terminal.
It should be noted that, the process utilizing described electric force monitoring apparatus to carry out electric power data detection is all automations, without the need to manual intervention, information receiving unit can obtain the information data of power equipment continuously from the information output mouth by power equipment, such as electric current and voltage, electric wiring temperature, whether to leak electricity, be then transferred to data storage cell by information receiving unit and store; When reaching the time interval preset, timer can control described data analysis unit and carry out scanning analysis to the data in this period of time interval stored in data storage cell, have without exception in this time with the use detecting power equipment, if there is exception, data analysis unit will send signal to Alarm Unit, point out administrative staff to process by Alarm Unit, and this abnormal information is transferred to power monitoring terminal carries out record.
As a kind of preferred version, described timing inspection device is also provided with switch control unit, the output of described data analysis unit is connected to the input of described switch control unit, and the output of described switch control unit is then connected with power equipment, controls the switch of power equipment.Described switch control unit makes when described data analysis unit detects severely subnormal, first can send signal to switch control unit, by the use electric line cutting off power equipment, wait for that administrative staff are for further processing again, avoid abnormal continuation to expand, improve the performance of described electric force monitoring apparatus further.
The beneficial effects of the utility model are: whole power equipment Data Detection is automation, without the need to manual intervention, save manpower and materials, and have employed Alarm Unit and power equipment switch control rule, make the exception of power equipment can be processed in time and avoid further expansion.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Embodiment
Below with reference to accompanying drawing, the utility model will be further described, it should be noted that, the present embodiment, premised on the technical program, provide detailed execution mode and concrete operating process, but protection range of the present utility model is not limited to the present embodiment.
As shown in Figure 1, a kind of electric force monitoring apparatus realizing timing automatic and patrol and examine, comprise power monitoring terminal, also comprise timing inspection device, form primarily of information receiving unit, data storage cell, data analysis unit and Alarm Unit, connect successively between four, described data analysis unit is also connected with timer; Described information receiving unit is connected with the information output mouth communication of power equipment, and described Alarm Unit is then also connected to power monitoring terminal.
It should be noted that, the process utilizing described electric force monitoring apparatus to carry out electric power data detection is all automations, without the need to manual intervention, information receiving unit can obtain the information data of power equipment continuously from the information output mouth by power equipment, such as electric current and voltage, electric wiring temperature, whether to leak electricity, be then transferred to data storage cell by information receiving unit and store; When reaching the time interval preset, timer can control described data analysis unit and carry out scanning analysis to the data in this period of time interval stored in data storage cell, have without exception in this time with the use detecting power equipment, if there is exception, data analysis unit will send signal to Alarm Unit, point out administrative staff to process by Alarm Unit, and this abnormal information is transferred to power monitoring terminal carries out record.
As a kind of preferred version, described timing inspection device is also provided with switch control unit, the output of described data analysis unit is connected to the input of described switch control unit, and the output of described switch control unit is then connected with power equipment, controls the switch of power equipment.Described switch control unit makes when described data analysis unit detects severely subnormal, first can send signal to switch control unit, by the use electric line cutting off power equipment, wait for that administrative staff are for further processing again, avoid abnormal continuation to expand, improve the performance of described electric force monitoring apparatus further.
For a person skilled in the art, according to above technical scheme and design, various corresponding change and distortion can be provided, and all these change and distortion all should be included within the protection range of the utility model claim.