CN204511293U - A kind of two embedding rock drilling machine of column high pulling torque long spire - Google Patents

A kind of two embedding rock drilling machine of column high pulling torque long spire Download PDF

Info

Publication number
CN204511293U
CN204511293U CN201520106944.7U CN201520106944U CN204511293U CN 204511293 U CN204511293 U CN 204511293U CN 201520106944 U CN201520106944 U CN 201520106944U CN 204511293 U CN204511293 U CN 204511293U
Authority
CN
China
Prior art keywords
column
chassis
unit head
embedding rock
drilling machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520106944.7U
Other languages
Chinese (zh)
Inventor
钱圣德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang New Land Infrastructure Co ltd
Original Assignee
WENZHOU CHANGCHENG FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WENZHOU CHANGCHENG FOUNDATION ENGINEERING Co Ltd filed Critical WENZHOU CHANGCHENG FOUNDATION ENGINEERING Co Ltd
Priority to CN201520106944.7U priority Critical patent/CN204511293U/en
Application granted granted Critical
Publication of CN204511293U publication Critical patent/CN204511293U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

A kind of two embedding rock drilling machine of column high pulling torque long spire, is characterized in that, on walking or stride-cterpillar drive, erection chassis, chassis is established two column, two column diclinic support is adjustable fixing, chassis is also provided with undercarriage, control cabinet and 2-4 platform hoist engine; Two column tops top sheave group hangs unit head, and unit head is made up of 4 75-110 kilowatt of variable-frequency motors, frequency converter, reductor, driver pinion, driven gear wheel and hexagonal jointings; Power head device output speed is 1-60 rev/min, and output torque is 20-100 ton rice; Connect long screw drill rod under unit head, under drilling rod, connect embedding rock drill bit.Compared with prior art, there is obvious superiority, large-tonnage moment of torsion can be exported, drive auger stem and carbide drill in the stratum of 60-120MPa ragstone or gravel layer, very fast high-bearing capacity engineering pile of constructing out, also reduces mud-less pollution in Foundation Design cost and construction.

Description

A kind of two embedding rock drilling machine of column high pulling torque long spire
Technical field
The utility model relates to building machinery field, particularly relates to a kind of two embedding rock drilling machine of column high pulling torque long spire.
Background technology
As everyone knows, long-spiral drilling machine is mainly used in northern China and west area, completes creeping into-guncreting-rear slotting reinforcing cage pile in the good soil layer of soil mechanical properties.Have that speed of application is fast, mud-less pollution and the advantage such as construction costs is lower.But existing long-spiral drilling machine all adopts list or bi-motor to drive, power of motor 45-75kw, moment of torsion 3.5-8 ton rice.So long-spiral drilling machine can only creep into soil layer or the compressive strength soft rock lower than 20MPa.
At the building of China coast soft clay area, when upper soil horizon mechanical property is poor, engineering pile stake end can be embedded the hard rock 1-3 times of stake footpath that compression strength value is 60-120MPa, to improve bearing capacity and the resistant slide of stake by designer.Embed the hard rock being greater than 60MPa, cannot construct with existing long-spiral drilling machine, this type of pile foundation existing can only adopt the percussive drill that cost is high, have mud contamination, or construction cost is higher, the down-hole hammer drilling machine construction that more consumes energy.
Utility model content
The utility model provides a kind of two embedding rock drilling machine of column high pulling torque long spire, and its unit head can export large-tonnage moment of torsion, and quick, low cost completes a footpath 0.6-2 rice, the construction piercing the castinplace pile of block stone gravel layer or hard rock of the long 60-100 rice of stake.The compression strength value of hard rock described herein is 60-120MPa, mud-less pollution in construction.China's soft clay area bearing course at pile end buried depth is in the majority with 50-80m, and adopt two pillar construction can construct on earth at the drilling rod of a column, the drilling rod connecting of another column continues construction, and avoid single stand column pile machine extension bar, workman must go up to pile frame top anchor tip.
The technical solution adopted in the utility model is: a kind of two embedding rock drilling machine of column high pulling torque long spire, it is characterized in that, on walking or stride-cterpillar drive, erection chassis, chassis is established two column, two column diclinic support is adjustable fixing, chassis is also provided with undercarriage, control cabinet and 2-4 platform hoist engine; Two column tops top sheave group hangs unit head, and unit head is made up of 4 75-110 kilowatt of variable-frequency motors, frequency converter, reductor, driver pinion, driven gear wheel and hexagonal jointings; Power head device output speed is 1-60 rev/min, and output torque is 20-100 ton rice; Connect long screw drill rod under unit head, under drilling rod, connect embedding rock drill bit.Stride-cterpillar drive described herein is the long stride retaining walking, and replaced by crawler unit by short stride, purer walking action is rapider.Comparatively crawler type device, because contact area increases, pile frame construction is safer stable.
A kind of two embedding rock drilling machine of column high pulling torque long spire compared with prior art, there is obvious superiority, large-tonnage moment of torsion can be exported, drive auger stem and carbide drill in the stratum of 60-120MPa ragstone or gravel layer, very fast high-bearing capacity engineering pile of constructing out, also reduces mud-less pollution in Foundation Design cost and construction.
Accompanying drawing explanation
Fig. 1 is the utility model embodiment side elevational cross-section schematic diagram.
Fig. 2 is that the utility model embodiment faces generalized section.
Drawing illustrates: 1 top pulleys group, 2 columns, 3 unit head lifting wire ropes, 4 open frame wire rope, 5 diagonal braces, 6 undercarriages, 7 hoist engines, 8 switch boards, 9 chassis, 10 long stride oil cylinders, 11 long strides, 12 short stride oil cylinders, 13 short strides, 14 assembly pulleys, 15 embedding rock drill bits, 16 locators, 17 auger stems, 18 unit heads.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, the utility model is described in further detail: the construction sequence of a kind of pair of embedding rock drilling machine of column high pulling torque long spire comprises:
1. each for the utility model rig parts are transported to job site assembling, at field boundary on the ground, first be well placed the long stride of two pieces (11) and the short stride of two pieces (13), installation chassis (9) on it, column (2) is installed on chassis (9), undercarriage (6), diagonal brace (5), hoist engine (7), switch board (8), and column (2) is erected, by top pulleys group (1) and assembly pulley (14) and hoist engine (7), by unit head (18), long screw drill rod (17) and drill bit (15) hang on column (2),
2. walked by long stride (11) and short stride (13), mobile drill is on stake position;
3. start frequency converter and 2 motors, frequency converter leaves to 50HZ, and the rotating speed of motor is 960 revs/min, through reductor, unit head (18) exports little moment of torsion height rotating speed, drives long screw drill rod (17) and drill bit (15), creeps into soil layer;
4. when drill bit (15) will enter gravel layer, turned down gradually from 50HZ by frequency converter, the rotating speed of motor also reduces gradually, and through reductor, unit head output torque increases, and drives long screw drill rod and drill bit, creeps into gravel layer;
5. when entering the hard rock of 60-120MPa, increasing and start another 2 motors and turn down frequency converter, making rotating speed be down to 2-4 rev/min, unit head moment of torsion exports and reaches 60-100 ton rice, ensures that drill bit creeps into hard rock until projected depth;
6. pumping high slump concrete enters stake holes from drilling rod center cavity by drill bit valve, pours into high slump concrete to design elevation with carrying boring to stake holes;
7. when after auger stem and carbide drill lift-off stake holes, stake machine moves next position and goes round and begins again, and continues the 3. to 5. step construction;
8. hang reinforcing cage and be inserted into setting absolute altitude from the vibration of concrete center vibrating hammer, namely complete the construction of this project long spire piles set into rock.

Claims (1)

1. the two embedding rock drilling machine of column high pulling torque long spire, is characterized in that, on walking or stride-cterpillar drive, erection chassis, chassis is established two column, two column diclinic support is adjustable fixing, chassis is also provided with undercarriage, control cabinet and 2-4 platform hoist engine; Two column tops top sheave group hangs unit head, and unit head is made up of 4 75-110 kilowatt of variable-frequency motors, frequency converter, reductor, driver pinion, driven gear wheel and hexagonal jointings; Power head device output speed is 1-60 rev/min, and output torque is 20-100 ton rice; Connect long screw drill rod under unit head, under drilling rod, connect embedding rock drill bit.
CN201520106944.7U 2015-01-31 2015-01-31 A kind of two embedding rock drilling machine of column high pulling torque long spire Expired - Fee Related CN204511293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520106944.7U CN204511293U (en) 2015-01-31 2015-01-31 A kind of two embedding rock drilling machine of column high pulling torque long spire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520106944.7U CN204511293U (en) 2015-01-31 2015-01-31 A kind of two embedding rock drilling machine of column high pulling torque long spire

Publications (1)

Publication Number Publication Date
CN204511293U true CN204511293U (en) 2015-07-29

Family

ID=53709286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520106944.7U Expired - Fee Related CN204511293U (en) 2015-01-31 2015-01-31 A kind of two embedding rock drilling machine of column high pulling torque long spire

Country Status (1)

Country Link
CN (1) CN204511293U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986761A (en) * 2015-01-31 2016-10-05 温州长城基础工程有限公司 Double-stand-column, large-torque and long-spiral rock-socketed drilling machine and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986761A (en) * 2015-01-31 2016-10-05 温州长城基础工程有限公司 Double-stand-column, large-torque and long-spiral rock-socketed drilling machine and construction method thereof

Similar Documents

Publication Publication Date Title
KR100957573B1 (en) Helical-pile for direct-boring grouting and using methods thereof
CN102704481A (en) Construction method combining static pressure pile sinking with middle-digging hole guiding for buildings or bridges
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN102628336A (en) Batter pile construction drilling machine and construction method
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN100494617C (en) Construction method of center mounting type anchor drill
CN203584444U (en) Efficient and simple roofbolter
CN102373705A (en) Pile sinking device and method for outer digging pre-stressed centrifugal pipe pile and square pile
CN103498574B (en) After in masonry panel, increase stem stem Shockproof reinforcing method
CN101914915A (en) Construction method for anti-floating anchor rod and special long auger
CN105113982B (en) One kind exempts from resonate full-sleeve long-spiral drilling machine and construction method
CN106120789A (en) The interior pile sinking process boring vibration PHC tube pile of major diameter
CN204511293U (en) A kind of two embedding rock drilling machine of column high pulling torque long spire
CN209339143U (en) A kind of concrete pipe pile construction equipment
CN204827213U (en) Double dynamical head digs rig soon
CN105840092A (en) Rotary drilling machine double-column structure
CN205116168U (en) End grout static pressure tubular pile construction equipment is expanded in drilling
CN104264662A (en) Construction method for deeply embedding hard rock secant pile in soil layer being rich in water
CN201635074U (en) Ground anchor
CN109339044A (en) A kind of concrete pipe pile construction equipment
CN102913121B (en) Flexible swing pipe vibrator boring machine
CN101476444A (en) Horizontal radiation pipe construction equipment for vibration-impact type radiation well
CN202164599U (en) Reinforcing pile enabling reinforcing rib body to be recycled
CN215441884U (en) Drilling and hammering integrated machine
CN201474602U (en) Prestressed pipe pile perforated pile-driving machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210413

Address after: No. 1506, 15th floor, building 1, Yueshang building, Nanhui street, Lucheng District, Wenzhou City, Zhejiang Province

Patentee after: Zhejiang new land infrastructure Co.,Ltd.

Address before: Room 2507, Wenzhou Avenue Railway Building, Wenzhou City, Zhejiang Province

Patentee before: WENZHOU CHANGCHENG FOUNDATION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

CF01 Termination of patent right due to non-payment of annual fee