CN204510205U - A kind of bamboo steel pile tube - Google Patents

A kind of bamboo steel pile tube Download PDF

Info

Publication number
CN204510205U
CN204510205U CN201420854661.6U CN201420854661U CN204510205U CN 204510205 U CN204510205 U CN 204510205U CN 201420854661 U CN201420854661 U CN 201420854661U CN 204510205 U CN204510205 U CN 204510205U
Authority
CN
China
Prior art keywords
steel pipe
floor
pile tube
pile
annular plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420854661.6U
Other languages
Chinese (zh)
Inventor
吴靖江
叶雨山
赵洪智
孙统国
陈胜德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201420854661.6U priority Critical patent/CN204510205U/en
Application granted granted Critical
Publication of CN204510205U publication Critical patent/CN204510205U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a kind of bamboo steel pile tube, effectively solves traditional steel pipe pile contact area level and smooth, and frictional resistance is little with end holding capacity, makes construction trouble, the problems such as steel pipe pile is insecure; Its technical scheme solved comprises spiral steel pipe, and steel pipe is provided with multiple evenly distributed annular plate, and floor is provided with multiple circumferentially uniform stiffened panel, and floor is provided with multiplely lets out hole; The utility model structure is ingenious, and input cost is low, shortens drainage channel, improves and increases the frictional force of weak soil avris and the holding capacity of termination, and corresponding to decrease steel pipe pile long, reduces and drops into, and simultaneously due to the existence because of annular plate, improves uplift resistance.

Description

A kind of bamboo steel pile tube
Technical field
The utility model relates to technical field of buildings, particularly relates to a kind of bamboo steel pile tube.
Background technology
Steel pipe pile, be made up of steel pipe, grooved tenon joining, tongue and groove draw pin, the left end tube wall of diameter of steel tube vertically connects rabbet groove, the cross section of rabbet groove is the square frame-shaped of openings at one side, reinforcing rib is provided with in the side of rabbet groove, on the right-hand member tube wall of diameter of steel tube and partially radial location is vertically connected with tongue and groove pin, and the channel section of tongue and groove pin is I-shaped.
The selection of piling machinery will according to engineering landforms, geology, supporting vertical model, appearance and size, weight, the material of stake, specification and length of embedment, engineering quantity size, duration length etc. and determine.
During bridge is cast-in-place, part adopts limited bracket form of construction work, especially in Muddy Bottoms geology, and support processing form difficulty, especially bracket basis part.
And during traditional steel pipe pile construction, because the extrusion friction resistance of steel pipe pile and mud or mucky soil weak soil is little, side friction resistance and the end holding capacity of unit length are little, trouble when making to construct in mud, steel pipe pile is insecure.
Summary of the invention
For above-mentioned situation, for overcoming the defect of prior art, the object of the utility model is just to provide a kind of bamboo steel pile tube, effectively solve traditional steel pipe pile contact area level and smooth, frictional resistance is little with end holding capacity, makes construction trouble, the problems such as steel pipe pile is insecure.
Its technical scheme solved comprises spiral steel pipe, and steel pipe is provided with multiple evenly distributed annular plate, and floor is provided with multiple circumferentially uniform stiffened panel, and floor is provided with multiplely lets out hole.
The utility model structure is ingenious, and input cost is low, shortens drainage channel, improves and increases the frictional force of weak soil avris and the holding capacity of termination, and corresponding to decrease steel pipe pile long, reduces and drops into, and simultaneously due to the existence because of annular plate, improves uplift resistance.
Accompanying drawing explanation
Fig. 1 is the utility model stereogram.
Fig. 2 is the utility model front view.
Fig. 3 is the utility model top view.
Fig. 4 is the utility model annular plate and lets out hole schematic diagram one.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail.
Provided by Fig. 1 to Fig. 4, the utility model comprises spiral steel pipe 1, and steel pipe 1 is provided with multiple evenly distributed annular plate 2, and floor 2 is provided with multiple circumferentially uniform stiffened panel 3, and floor 2 is provided with multiplely lets out hole 4.
The spacing of described every two annular plates 2 is 3 meters.
Described floor 2 is welded on steel pipe 1, and stiffened panel 3 is welded on steel pipe 1 and floor 2 junction.
Described stiffened panel 3 is triangular in shape.
Described let out the rounded or rectangle in hole 4.
Described let out hole 4 while overlapping with annular plate 2 inner edge.
When the utility model uses, the design feature of bamboo steel pile tube is exactly the steel plate annular plate 2 arranging the protrusion of wide about 10cm together on pile body steel pipe 1 every 3m, during construction, the mode such as back-up sand is filled gilled rings and is formed space, compacted and rubbing action is formed to mud and mucky soil weak soil, for increasing lateral area, improve and increase side friction.
During pile sinking, enlarged footing and rib (wing plate) form space, stake side sand and fill, and define the supporting steel pile tube that pile crown expands lateral irrigation sand.
When pile sinking, formation space, stake side sand is filled, and its advantage to shorten drainage channel, accelerates the diffusion of super interstitial hydraulic pressure and the consolidation of outside muddy soft soil layer, and improve weak soil side skin friction, replace former Pile side soil body, the collateral resistance of back-up sand is higher.Due to the effect of contraction of floor 2, the sand of filling to a certain degree with stake overall work, correspondingly add a footpath and side surface area, add the collateral resistance of stake.
By setting up hoop floor 2, stiffened panel 3 to common steel tube 1, letting out hole 4 equipment, form the steel pipe of similar ring.Under vibration during heavy construction, fill sandstone in surrounding, improve, improve side direction frictional resistance and the termination holding capacity of unit length to stake week mucky soil, corresponding to decrease steel pipe pile long, reduces input.The more identical geologic position of this engineering test reduce 30% long.Meanwhile, because ring (hoop floor) exists, uplift resistance can be improved.
The effect of annular plate 2 is the contacts area expanding pile foundation and soil around pile.Meanwhile, the existence of annular plate 2, improves soil property to sandstone and provides duct.Annular plate 2 width and link height are determined according to actual needs.
The effect of stiffened panel 3 ensures that floor 2 can drive sandstone to sink when being subject to high-drag.
The effect of letting out hole 4 is that the stake first forming link constantly clamp-ons soil around pile during the course, and form space, the sandy soil on upper strata are filled by letting out hole 4, ensures overall improvement.
Specifically first laterally increase on floor 2 when manufacturing and use and let out hole 4, increase sandy soil during to construct and let out passage, then welding annular plate 3 and stiffened panel 4 are on the steel pipe 1 of factory process, carry out construction lofting roughly for the first time, and rear preparation sand heap puts in place, the accurate setting-out in pile foundation position, sand drift is drawn over to one's side into high outside and low outside shape, starts vibrating hammer, along with steel pipe 1 sinks, around sandy soil are with sinking, adopt spade or wood to pull out etc. sandy soil are sent into settling zone in construction.
Construction should be noted before pile sinking, reserved certain back-up sand at periphery, avoided back-up sand deficiency to cause construction steel pipe pile driving construction to interrupt.
The utility model, relative to traditional normal spiral steel pipe pile, by structure design cleverly, adds avris frictional resistance, helping steel pipe pile more firm when constructing, constructing convenient, solving ordinary steel pile tube Problems existing in building field.
The utility model structure is ingenious, and input cost is low, shortens drainage channel, improves and increases the frictional force of weak soil avris and the holding capacity of termination, and corresponding to decrease steel pipe pile long, reduces and drops into, and simultaneously due to the existence because of annular plate, improves uplift resistance.

Claims (6)

1. a bamboo steel pile tube, comprise spiral steel pipe (1), it is characterized in that, steel pipe (1) is provided with multiple evenly distributed annular plate (2), floor (2) is provided with multiple circumferentially uniform stiffened panel (3), and floor (2) is provided with multiplely lets out hole (4).
2. a kind of bamboo steel pile tube according to claim 1, is characterized in that, the spacing of described every two annular plates (2) is 3 meters.
3. a kind of bamboo steel pile tube according to claim 1, is characterized in that, described floor (2) is welded on steel pipe (1), and stiffened panel (3) is welded on steel pipe (1) and floor (2) junction.
4. a kind of bamboo steel pile tube according to claim 1, is characterized in that, described stiffened panel (3) is triangular in shape.
5. a kind of bamboo steel pile tube according to claim 1, is characterized in that, described lets out the rounded or rectangle in hole (4).
6. a kind of bamboo steel pile tube according to claim 1, is characterized in that, described lets out the overlapping with annular plate (2) inner edge of hole (4).
CN201420854661.6U 2014-12-30 2014-12-30 A kind of bamboo steel pile tube Expired - Fee Related CN204510205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420854661.6U CN204510205U (en) 2014-12-30 2014-12-30 A kind of bamboo steel pile tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420854661.6U CN204510205U (en) 2014-12-30 2014-12-30 A kind of bamboo steel pile tube

Publications (1)

Publication Number Publication Date
CN204510205U true CN204510205U (en) 2015-07-29

Family

ID=53708197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420854661.6U Expired - Fee Related CN204510205U (en) 2014-12-30 2014-12-30 A kind of bamboo steel pile tube

Country Status (1)

Country Link
CN (1) CN204510205U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735308A (en) * 2016-02-26 2016-07-06 广东工业大学 Prestressed pipe pile
CN105952241A (en) * 2016-05-06 2016-09-21 国网湖南省电力公司 Combined pedestal used for fast mounting/dismounting composite material electric pole
CN106013138A (en) * 2016-07-14 2016-10-12 苏义民 Pipe pile with incomplete ribs
CN106545006A (en) * 2016-10-17 2017-03-29 浙江大学 External member formula bamboo joint pile and its production technology afterwards
CN106592586A (en) * 2016-12-03 2017-04-26 浙江大学 Prefabricated pile with external hoops and filled with sand-gravel aggregates, and construction method thereof
CN106939594A (en) * 2016-01-05 2017-07-11 山西省建筑科学研究院 Set up the static pressure steel-pipe pile and its pile making method of earpiece plate
CN107893425A (en) * 2017-10-27 2018-04-10 广东省交通规划设计研究院股份有限公司 A kind of anchor structure and its construction method of steel pipe composite pile and cushion cap
CN108301397A (en) * 2018-01-31 2018-07-20 山东建筑大学 A kind of multiple wing sheet-pile structure and construction method suitable for soft soil foundation
CN110091431A (en) * 2019-04-30 2019-08-06 西安理工大学 A kind of steel tube concrete pile and manufacturing method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939594A (en) * 2016-01-05 2017-07-11 山西省建筑科学研究院 Set up the static pressure steel-pipe pile and its pile making method of earpiece plate
CN105735308A (en) * 2016-02-26 2016-07-06 广东工业大学 Prestressed pipe pile
CN105952241B (en) * 2016-05-06 2018-04-24 国网湖南省电力公司 A kind of combination base for the dismounting of composite material electric pole Fast Installation
CN105952241A (en) * 2016-05-06 2016-09-21 国网湖南省电力公司 Combined pedestal used for fast mounting/dismounting composite material electric pole
CN106013138A (en) * 2016-07-14 2016-10-12 苏义民 Pipe pile with incomplete ribs
CN106545006A (en) * 2016-10-17 2017-03-29 浙江大学 External member formula bamboo joint pile and its production technology afterwards
CN106592586B (en) * 2016-12-03 2018-12-04 浙江大学 Additional cuff back-up sand building stones prefabricated pile and its construction method
CN106592586A (en) * 2016-12-03 2017-04-26 浙江大学 Prefabricated pile with external hoops and filled with sand-gravel aggregates, and construction method thereof
CN107893425A (en) * 2017-10-27 2018-04-10 广东省交通规划设计研究院股份有限公司 A kind of anchor structure and its construction method of steel pipe composite pile and cushion cap
CN107893425B (en) * 2017-10-27 2020-05-19 广东省交通规划设计研究院股份有限公司 Construction method of anchoring structure of steel pipe composite pile and bearing platform
CN108301397A (en) * 2018-01-31 2018-07-20 山东建筑大学 A kind of multiple wing sheet-pile structure and construction method suitable for soft soil foundation
CN108301397B (en) * 2018-01-31 2023-12-15 山东建筑大学 Multi-wing-plate pile structure suitable for soft soil foundation and construction method
CN110091431A (en) * 2019-04-30 2019-08-06 西安理工大学 A kind of steel tube concrete pile and manufacturing method

Similar Documents

Publication Publication Date Title
CN204510205U (en) A kind of bamboo steel pile tube
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN103306683B (en) A kind of construction method of comprehensive precipitation in hole when excavating deep tunnel
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN108278116B (en) Shallow-buried large-span pipe curtain supporting system and construction method thereof
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN103046543A (en) Antiskid pile with hollow outer isosceles trapezoid cross section and in unequal interval arrangement
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN203583495U (en) Double-row pile structure by utilization of existing adjoining building slope protection pile
CN108611985A (en) Framed underpass bridge construction method that special geology is overweight
CN105649092A (en) Slope supporting method for crumbly strata
CN110761300B (en) Construction method for supporting impervious soft soil body on side slope of deep foundation pit of high-rise building through micro-expansion
CN109667273A (en) A kind of construction method of deep foundation pit supporting structure
CN104196037B (en) A kind of environmental protection slope reinforcement structure
CN208328666U (en) A kind of Extended chemotherapy seat-plate type bridge abutment structure with anchor pole
CN202401461U (en) Novel foundation pit shoring structure
CN205077499U (en) Double row pile supporting construction with transverse connection component
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN204282395U (en) A kind of stake holder counterfort retaining wall
CN204238209U (en) A kind of back-up sand bamboo joint pile
CN203530959U (en) High-strength underground diaphragm wall
CN207829905U (en) A kind of drift-sand stratum bored tunnel three-dimensional supporting construction in advance
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

Termination date: 20181230

CF01 Termination of patent right due to non-payment of annual fee