CN204494645U - The biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure - Google Patents

The biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure Download PDF

Info

Publication number
CN204494645U
CN204494645U CN201520145600.7U CN201520145600U CN204494645U CN 204494645 U CN204494645 U CN 204494645U CN 201520145600 U CN201520145600 U CN 201520145600U CN 204494645 U CN204494645 U CN 204494645U
Authority
CN
China
Prior art keywords
boiler
inner core
pipe
air
warm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520145600.7U
Other languages
Chinese (zh)
Inventor
王忠信
王珊山
徐龙娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520145600.7U priority Critical patent/CN204494645U/en
Application granted granted Critical
Publication of CN204494645U publication Critical patent/CN204494645U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to air-conditioning equipment, in particular to the biomass gasification fired horizontal water pipe steam boiler central air-conditioning of a kind of normal pressure, the left surface of boiler bottom plate (1) is equipped with and adjusts wind shoot door (2), boiler bottom plate (1) inner chamber is provided with cinder chamber (1-1), primary air piping (30) and two grey doors (29) boiler bottom plate (1) leading flank are equipped with respectively, the boiler that is equipped with above of boiler bottom plate gets a foothold (3), the upper left side of face of boiler leftover bits and pieces (3) is fixedly connected with boiler inner core (5), boiler inner core (5) lower parallel is equipped with a left side, right-oblique draining black furnace grate pipe (4), vertically uniform in smoke-box inner core (25) multiple water pipe (26) is housed, the lower end of water pipe (26) connects lower header (27) respectively, normal pressure biomass gasification fired horizontal water pipe steam boiler central air-conditioning structure is simple, floor space is little, small investment, can with opening with stopping, the thermal efficiency is high, safe and reliable, operating cost is low.

Description

The biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure
Technical field
The utility model belongs to air-conditioning equipment, particularly the biomass gasification fired horizontal water pipe steam boiler central air-conditioning of a kind of normal pressure.
Background technology
At present, the thermal source of central air-conditioning generally adopts coal, electricity, liquefied gas, town gas, heavy oil etc. to heat, and to atmosphere pollution greatly, although electric energy generation is polluted little, one-time investment is many, and operating cost is high for coal and heavy oil.Biomass energy is can the renewable sources of energy, and its carbon containing, sulfur-bearing and ash content are all low, than coal and heavy oil very manyly little to atmosphere pollution; about there are about 700,000,000 tons biomass energies China's year; often be only now and utilize about 2.2 hundred million tons, remainder is all lost and is even burnt in farmland, pollutes environment; if made full use of; not only increase wealth, also protect environment, reduce the discharge of carbon dioxide and sulfur dioxide widely; therefore, some biomass type fuel boilers have been there are both at home and abroad.The existing type of furnace does not meet the feature request of biomass molding fuel, and cause burning to worsen, the thermal efficiency is low, poor heat transfer, heat-transfer surface slagging scorification, heat-transfer surface often blocks, lime-ash coking, pollutes large, and external type only eats flour and rice, need to burn wooden burning, and bring a high price, be not suitable for China's national situation.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned technical deficiency, and provide a kind of structure simple, the thermal efficiency is high, is conducive to the biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure of environmental protection joint row.
The technical scheme that the utility model technical solution problem adopts is: the biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure comprises boiler bottom plate, primary air piping, ash door, fire door, water-cooled fire grate pipe, boiler jacket, upper hose, return pipe, warm-air drier one, warm-air drier two, be characterized in being equipped with on the left surface of boiler bottom plate and adjust wind shoot door, boiler bottom plate inner chamber is provided with cinder chamber, primary air piping and two grey doors boiler bottom plate leading flank are equipped with respectively, the boiler that is equipped with above of boiler bottom plate is got a foothold, the upper left side of face of boiler leftover bits and pieces is fixedly connected with boiler inner core, boiler leftover bits and pieces upper right is fixedly connected with smoke-box inner core, boiler inner core upper end is equipped with inner core upper cover, smoke-box inner core upper end is equipped with upper perforated plate, all be communicated with cinder chamber bottom boiler inner core with bottom smoke-box inner core, boiler inner core lower parallel is equipped with a left side, a right-oblique draining black furnace grate pipe, be interconnected between water-cooled fire grate pipe, the inner space of water-cooled fire grate pipe two ends respectively and between boiler jacket and boiler inner core, be vaporizer above water-cooled fire grate pipe, be combustion chamber above vaporizer, second-time burning hole is provided with between boiler inner core upper end and smoke-box inner core upper end, fire door above boiler and combustion chamber, two fire doors of below are communicated with vaporizer respectively, boiler jacket between combustion chamber and vaporizer and boiler inner core fixedly install two with the vortex burner of inner space and secondary air channel, boiler jacket and boiler inner core are equipped with explosion proof door, tertiary-air pipe with combustion chamber is housed on the right side of explosion proof door, vertically uniform in smoke-box inner core multiple water pipe is housed, water pipe top connect upper perforated plate and and boiler jacket, inner core upper cover, tertiary-air pipe, the inner space formed between upper perforated plate, the lower end of water pipe connects lower header respectively, below upper perforated plate, fireguard is housed, boiler jacket lower right-hand side is provided with the return pipe of inner space between smoke-box inner core, with boiler and warm-air drier tube connector, warm-air drier one is housed above on the left of boiler jacket upper cover, warm-air drier and atmospheric communicating pipe and water seal warm-air drier one be equipped with, with boiler and warm-air drier tube connector, warm-air drier two is housed above on the right side of boiler jacket upper cover.
The beneficial effects of the utility model are: normal pressure biomass gasification fired horizontal water pipe steam boiler central air-conditioning structure is simple, and floor space is little, small investment, can with opening with stopping, and the thermal efficiency is high, safe and reliable, and operating cost is low.The burning of this central air-conditioning is biomass fuel, is regenerative resource, the low ash content of low-carbon and low-sulphur, and fugitive constituent is high; after gasification, and combustion, flue gas carbon containing, sulfur-bearing are low, dust is few, little to atmosphere pollution; be conducive to protection of the environment, reduce the discharge of carbon dioxide and sulfur dioxide widely, can turn waste into wealth.This central air-conditioning can be widely used in the place heating such as big-and-middle-sized factory building, market, station, large-scale public place, and can be the resident's heat supply away from heating network, is agricultural greenhouse, the heat supply and air conditioning of mushroom factory building and bathroom heat supply and supplying hot water steam etc.
Accompanying drawing explanation
Illustrate with embodiment below in conjunction with accompanying drawing.
Fig. 1 is normal pressure biomass gasification fired horizontal water pipe steam boiler central air-conditioning structure chart.
In figure, 1-boiler bottom plate; 1-1-cinder chamber; 2-adjusts wind shoot door; 3-boiler is got a foothold; 4-water-cooled fire grate pipe; 5-boiler inner core; 5-1-vaporizer; 5-2-combustion chamber; 6-fire door; 7-boiler jacket; 8-vortex burner and secondary air channel; 9-explosion proof door; 10-inner core upper cover; 11-water-level gauge; 12-tertiary-air pipe; 13-second-time burning hole; 14-boiler and warm-air drier tube connector; 15-warm-air drier one; 16-warm-air drier and atmospheric communicating pipe and water seal; 17-warm-air drier two; 18-boiler atmospheric communicating pipe and water seal; 19-boiler jacket upper cover; 20-upper hose; 21-upper perforated plate; 22-stovepipe; 23-chimney valve; 24-inspection door; 25-smoke-box inner core; 26-water pipe; 27-lower header; 28-return pipe; 29-ash door; 30-primary air piping; 31-fireguard; A-ash bed; B-oxidizing fire layer; C-reducing zone; D-destructive distillation layer; E-drying layer; F-fuel gas layer.
Detailed description of the invention
Embodiment, with reference to accompanying drawing 1, boiler bottom plate 1 left surface of the biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure is equipped with and adjusts wind shoot door 2, boiler bottom plate 1 inner chamber is provided with cinder chamber 1-1, wind shoot door 2 is adjusted to be communicated with cinder chamber 1-1, primary air piping 30 and two grey doors 29 boiler bottom plate 1 leading flank are equipped with respectively, the boiler that is equipped with above of boiler bottom plate 1 gets a foothold 3, on boiler leftover bits and pieces 3, left side of face is fixedly connected with boiler inner core 5, boiler 3 upper right of getting a foothold are fixedly connected with smoke-box inner core 25, boiler inner core 5 upper end is equipped with inner core upper cover 10, smoke-box inner core 25 upper end is equipped with upper perforated plate 21, all be communicated with cinder chamber 1-1 with bottom smoke-box inner core 25 bottom boiler inner core 5.Boiler inner core 5 lower parallel is equipped with a draining black furnace grate pipe 4 of left and right inclination, is interconnected between water-cooled fire grate pipe 4, the inner space of water-cooled fire grate pipe 4 two ends respectively and between boiler jacket 7 and boiler inner core 5.Water-cooled fire grate pipe 4 is vaporizer 5-1 above, is combustion chamber 5-2 above vaporizer 5-1.Between boiler inner core 5 upper end and smoke-box inner core 25 upper end, second-time burning hole 13 is housed, outside boiler inner core 5 He outside smoke-box inner core 25, boiler jacket 7 is housed, the upper end of boiler jacket 7 is equipped with boiler jacket upper cover 19.The boiler jacket 7 in left side and boiler inner core 5 are equipped with three fire doors 6, the fire door 6 of the top is communicated with combustion chamber 5-2, two fire doors 6 of below are communicated with vaporizer 5-1 respectively, water-level gauge 11 is equipped with the fire door 6 upper left boiler jacket 7 be communicated with combustion chamber 5-2, the inner space formed between water-level gauge 11 and boiler jacket 7, inner core upper cover 10, tertiary-air pipe 12, upper perforated plate 21, boiler jacket upper cover 19.Boiler jacket 7 between combustion chamber 5-2 and vaporizer 5-1 and boiler inner core 5 fixedly install two with the vortex burner of inner space and secondary air channel 8, boiler jacket 7 outside the 5-2 of combustion chamber and boiler inner core 5 are equipped with explosion proof door 9, the tertiary-air pipe 12 be communicated with combustion chamber 5-2 is housed on the right side of explosion proof door 9.Vertically uniform in smoke-box inner core 25 multiple water pipe 26 is housed, water pipe 26 top connects upper perforated plate 21, and with boiler jacket 7, inner core upper cover 10, tertiary-air pipe 12, the inner space formed between upper perforated plate 21, water pipe 26 lower end is communicated with lower header 27 respectively, lower header 27 is fixedly equipped with on boiler leftover bits and pieces 3, the upper perforated plate 21 of smoke-box inner core 25 inside is equipped with fireguard 31 below, boiler jacket 7 outside smoke-box inner core 25 is equipped with inspection door 24, inspection door 24 is communicated with smoke-box inner core 25, be equipped with below boiler jacket 7 right flank and the return pipe 28 of inner space between boiler jacket 7 and smoke-box inner core 25 outer wall, the stovepipe 22 be communicated with smoke-box inner core 25 is equipped with in top, chimney valve 23 stovepipe 22 is equipped with, the upper hose 20 with inner space boiler jacket upper cover 19 on the left of stovepipe 22 is equipped with.Boiler jacket upper cover 19 on the left of upper hose 20 is equipped with and the boiler atmospheric communicating pipe of inner space and water seal 18, to be connected with warm-air drier tube connector 14 with two boilers above on the left of boiler jacket upper cover 19 and warm-air drier 1 is housed, warm-air drier 1 is equipped with warm-air drier and is communicated with siphunculus and water seal 16 with air, to be connected with warm-air drier tube connector 14 with two boilers above on the right side of boiler jacket upper cover 19 and warm-air drier 2 17 is housed, warm-air drier 1 and warm-air drier 2 17 rightabout are installed, or according to installation site adjustment direction.
The course of work of the biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure is: drop into biomass granule fuel to boiler inner core 5 from fire door 6, added water by upper hose 20, water-level gauge 11 observes the water yield.After adding water, this central air-conditioning can run by following three kinds of modes: 1, boiler normal combustion mode, 150 ~ 400mm high living beings bed of material is added in boiler inner core 5 after igniting, open and adjust wind shoot door 2 and chimney valve 23, warm-air drier 15 is also be interrupted to open, and this mode is the method for operation of most power saving, lowest price, 2, open the normal combustion mode of air blast, after adding 150 ~ 400mm high living beings bed of material after ignition of the boiler, close all fire doors 6, by the normal combustion mode of primary air piping 30 with air blast air feed, i.e. load combustion system in boiler, 3, gasification, and combustion mode, after ignition of the boiler, thicken biomass fuel bed, now in vaporizer 5-1, bottom is ash bed A, be oxidizing fire layer B above ash bed A, be reducing zone C above oxidizing fire layer B, be destructive distillation layer D above reducing zone C, destructive distillation layer D upper strata is drying layer E, be fuel gas layer F above drying layer E, light a fire through vortex burner and secondary air channel 8 and blow, tertiary-air pipe 12 is combustion-supporting, the combustion gas of fuel gas layer F is made to be equivalent to low-calorie natural gas, the flame of above-mentioned three kinds of modes enters smoke-box inner core 25 through second-time burning hole 13, under the effect of fireguard 31, flame returns from the below of fireguard 31 and discharges through stovepipe 22, dust or lime-ash are between lower header 27 and fall into cinder chamber 1-1 between water-cooled fire grate pipe 4, can not block.After in boiler, aqueous medium is heated, produce atmospheric steam to boiler top, after be covered with the finned tube of warm-air drier 1 through boiler and warm-air drier tube connector 14, as when pressure exceedes atmospheric steam then steam can be discharged into indoor from warm-air drier and atmospheric communicating pipe and water seal 16 and boiler atmospheric communicating pipe and water seal 18, boiler wall establishes temperature control equipment, after reaching mild temperature, warm-air drier 15 starts, warm-air drier 2 17 running passes to room air the steam heat in warm-air drier 1 finned tube, indoor are delivered to again after air heat in warm-air drier 1 suction-chamber, steam condensate (SC) declines and returns boiler.In summer, can directly be drawn into cold water as refrigerating plant by water pipe 26.

Claims (1)

1. the biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure comprises boiler bottom plate (1), primary air piping (30), ash door (29), fire door (6), water-cooled fire grate pipe (4), boiler jacket (7), upper hose (20), return pipe (28), warm-air drier one (15), warm-air drier two (17), it is characterized in that being equipped with on the left surface of boiler bottom plate (1) and adjust wind shoot door (2), boiler bottom plate (1) inner chamber is provided with cinder chamber (1-1), primary air piping (30) and two grey doors (29) boiler bottom plate (1) leading flank are equipped with respectively, the boiler that is equipped with above of boiler bottom plate gets a foothold (3), the upper left side of face of boiler leftover bits and pieces (3) is fixedly connected with boiler inner core (5), boiler leftover bits and pieces (3) upper right is fixedly connected with smoke-box inner core (25), boiler inner core (5) upper end is equipped with inner core upper cover (10), smoke-box inner core (25) upper end is equipped with upper perforated plate (21), boiler inner core (5) bottom is all communicated with cinder chamber (1-1) with smoke-box inner core (25) bottom, boiler inner core (5) lower parallel is equipped with a left side, right-oblique draining black furnace grate pipe (4), be interconnected between water-cooled fire grate pipe (4), the inner space of water-cooled fire grate pipe (4) two ends respectively and between boiler jacket (7) and boiler inner core (5), water-cooled fire grate pipe (4) is vaporizer (5-1) above, be combustion chamber (5-2) above vaporizer (5-1), second-time burning hole (13) is provided with between boiler inner core (5) upper end and smoke-box inner core (25) upper end, fire door (6) above boiler is communicated with combustion chamber (5-2), two fire doors (6) of below are communicated with vaporizer (5-1) respectively, boiler jacket (7) between combustion chamber (5-2) and vaporizer (5-1) and boiler inner core (5) be upper fixedly install two with the vortex burner of inner space and secondary air channel (8), boiler jacket (7) and boiler inner core (5) are equipped with explosion proof door (9), the tertiary-air pipe (12) be communicated with combustion chamber (5-2) is equipped with on explosion proof door (9) right side, vertically uniform in smoke-box inner core (25) multiple water pipe (26) is housed, water pipe (26) top connect upper perforated plate (21) and with boiler jacket (7), inner core upper cover (10), tertiary-air pipe (12), the inner space formed between upper perforated plate (21), the lower end of water pipe (26) connects lower header (27) respectively, fireguard (31) is housed below upper perforated plate (21), boiler jacket (7) lower right-hand side is provided with the return pipe (28) of inner space between smoke-box inner core (25), boiler jacket upper cover (19) is equipped with warm-air drier one (15) with boiler and warm-air drier tube connector (14) above left side, warm-air drier and atmospheric communicating pipe and water seal (16) warm-air drier one (15) be equipped with, boiler jacket upper cover (19) is equipped with warm-air drier two (17) with boiler and warm-air drier tube connector (14) above right side.
CN201520145600.7U 2015-03-16 2015-03-16 The biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure Expired - Fee Related CN204494645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520145600.7U CN204494645U (en) 2015-03-16 2015-03-16 The biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520145600.7U CN204494645U (en) 2015-03-16 2015-03-16 The biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure

Publications (1)

Publication Number Publication Date
CN204494645U true CN204494645U (en) 2015-07-22

Family

ID=53573957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520145600.7U Expired - Fee Related CN204494645U (en) 2015-03-16 2015-03-16 The biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure

Country Status (1)

Country Link
CN (1) CN204494645U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104728955A (en) * 2015-03-16 2015-06-24 王忠信 Normal-pressure biomass gasified combustion horizontal water pipe steam boiler central air conditioner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104728955A (en) * 2015-03-16 2015-06-24 王忠信 Normal-pressure biomass gasified combustion horizontal water pipe steam boiler central air conditioner

Similar Documents

Publication Publication Date Title
CN205403139U (en) Low nitrogen buggy boiler
CN202734221U (en) Vertical energy-saving environmental-protection boiler
CN102235684A (en) Three-return-stroke reverse-combustion biomass superconductive hot half gasification furnace
CN204494645U (en) The biomass gasification fired horizontal water pipe steam boiler central air-conditioning of normal pressure
CN205579531U (en) Environment -friendly boiler
CN205048407U (en) Horizontal full -automatic steam boiler
CN201909432U (en) Superconducting boiler with gas produced from coal
CN1800762A (en) Hot-air furnace combined by combustion chamber and dustproof multi-stage heat exchanger with burning-resistant device
CN104728955A (en) Normal-pressure biomass gasified combustion horizontal water pipe steam boiler central air conditioner
CN205448312U (en) Coal -fired powder heat carrier heater
CN102425805B (en) Air change and fresh air heating system of boiler house
CN201212729Y (en) Biomass granular fuel boiler
CN100396997C (en) Double-purpose and coal-saving boiler with hot air heat and water supply
CN208998096U (en) Hot-blast stove
CN102889585A (en) Environment-friendly energy-saving vertical boiling boiler
CN203489469U (en) Energy-saving gas boiler
CN202012948U (en) Three-return counter heating type biomass super-thermal-conductive semi-gasification furnace
CN2681035Y (en) Vertical simple gas boiler
CN105588114A (en) Vertical type semi-gasification biomass burning boiler
CN2893591Y (en) Combustion chamber and combined hot-blast furnace with burning resisting device, multistage heat-exchanging and dust-removing
CN200958749Y (en) Economical environmental-protecting boiler of coal clean burning
CN205481766U (en) High -efficient energy -saving pot stove of condensing
CN204611724U (en) Biomass gasification fired horizontal water pipe steam Central air-conditioning unit
CN202709074U (en) Efficient clean-burning multiple powder steam boiler
CN2684024Y (en) Gas-fired horizontal boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20210316

CF01 Termination of patent right due to non-payment of annual fee