CN204477682U - Gas station compressor three line aerator - Google Patents

Gas station compressor three line aerator Download PDF

Info

Publication number
CN204477682U
CN204477682U CN201520143564.0U CN201520143564U CN204477682U CN 204477682 U CN204477682 U CN 204477682U CN 201520143564 U CN201520143564 U CN 201520143564U CN 204477682 U CN204477682 U CN 204477682U
Authority
CN
China
Prior art keywords
pressure
compressor
gas
valve
middle pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520143564.0U
Other languages
Chinese (zh)
Inventor
李绍山
尹智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Wantai Oil Equipment Development Co Ltd
Original Assignee
Shandong Wantai Oil Equipment Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Wantai Oil Equipment Development Co Ltd filed Critical Shandong Wantai Oil Equipment Development Co Ltd
Priority to CN201520143564.0U priority Critical patent/CN204477682U/en
Application granted granted Critical
Publication of CN204477682U publication Critical patent/CN204477682U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a kind of gas station compressor three line aerator, it comprises filling machine, compressor and source of the gas steam outlet pipe, filling machine is connected with pressure duct, middle pressure pipe road and low pressure line, the inlet end of low pressure line is connected on source of the gas steam outlet pipe, the gas outlet tube road of compressor respectively with pressure duct, middle pressure pipe road connects, pressure duct is connected with bomb group, middle pressure pipe road is connected with middle pressure bottle group, air inlet pipeline is connected with breather check valve and low-pressure inlet valve, the pressure inlet valve being arranged in its bypass branch front middle pressure pipe road is equipped with, pressure duct is equipped with high pressure check valve, bomb group, middle pressure bottle group, breather check valve, low-pressure inlet valve, middle pressure inlet valve, high pressure check valve is all controlled by PLC, filling machine is electrically connected with PLC.The utility model effectively prevent high frequent and starts, and substantially prolongs the working life of compressor, improves the working efficiency of this aerator.

Description

Gas station compressor three line aerator
Technical field
The utility model relates to a kind of gas station compressor three line aerator.
Background technique
Present taxi and private car adopt rock gas as power fuel, thus needs gas station to be that it carries out aerating.Existing gas station comprises filling machine and gas compressor, by tank car, source of the gas is transported, pass into again in filling machine after the gas of source of the gas carries out gas compression pressurization by gas compressor, filling machine is connected with pressure duct, middle pressure pipe road and low pressure line, gas compressor and pressure duct is made according to the compression ratio of gas compressor, middle pressure pipe road and low pressure line connect, can according to the storage pressure determination pressure duct treated on the automobile of aerating, middle pressure pipe road or low pressure line are communicated with the outlet pipe of filling machine, namely filling machine passes through low pressure, medium and high pressure is in turn for automobile carries out aerating.The shortcoming of this gas station is, gas compressor frequent starting, adds the frequency of utilization of gas compressor, shortens the working life of gas compressor; And when there is no source of the gas temporarily or bleed pressure is too low cause air displacement not enough time, can not aerating work be carried out, have impact on the working efficiency of whole gas station.
Model utility content
The technical problems to be solved in the utility model is for above-mentioned defect, provides a kind of gas station compressor three line aerator that also can realize aerating operation when avoiding gas compression machine frequent starting and can ensure do not have source of the gas.
In order to solve the problems of the technologies described above, the gas station compressor three line aerator provided comprises filling machine, compressor and source of the gas steam outlet pipe, filling machine is connected with pressure duct, middle pressure pipe road and low pressure line, its structural feature is: the inlet end of described low pressure line is connected on source of the gas steam outlet pipe, source of the gas steam outlet pipe is connected to the inlet end of compressor by air inlet pipeline, the gas outlet tube road of described compressor respectively with pressure duct, middle pressure pipe road connects, described pressure duct is connected with bomb group by bypass branch, described middle pressure pipe road is connected with middle pressure bottle group by bypass branch, described air inlet pipeline is connected with after going to, is connected with breather check valve and low-pressure inlet valve, described middle pressure pipe road is equipped with the pressure inlet valve being arranged in its bypass branch front successively after going to, the high pressure check valve being positioned at its bypass branch front described pressure duct is equipped with, middle pressure pipe road and air inlet pipeline are connected with equilibrium valve between the pipeline section at breather check valve rear, described bomb group, middle pressure bottle group, breather check valve, equilibrium valve, low-pressure inlet valve, middle pressure inlet valve, high pressure check valve is all controlled by PLC, described filling machine is electrically connected with PLC.
Pressure transmitter is equipped with respectively in air inlet pipeline, pressure duct and middle pressure pipe road.
Pressure duct is connected with high pressure entry valve.
After adopting said structure, when using this device for natural gas vehicle refueling, by natural gas via source of the gas steam outlet pipe, inflated to automobiles bottle by filling machine after low pressure line, when filling machine detects that the pressure of automobiles bottle is equal with the pressure in low pressure line, low pressure line is cut off pressure pipe road and car bottle in rear connection by filling machine, now, pressure pipe road direction car bottle aerating during gas in middle pressure bottle group passes through, according to setting value, middle pressure bottle group has certain initial pressure, therefore by middle pressure bottle group in the process of car bottle aerating, compressor does not start, in the middle of the pressure of pressure bottle group decline when can not carry out aerating gradually, middle pressure pipe road cuts off and connects pressure duct by filling machine, filling machine by bomb group to car bottle aerating, therefore by process from bomb group to car bottle aerating converge in, compressor does not also start.When the gas pressure of central pressure bottle group and bomb group is not enough, compressor starts automatically, rock gas enters compressor from source of the gas steam outlet pipe through low-pressure inlet valve, filling machine is entered respectively through middle pressure inlet valve, high pressure check valve after supercharging, be that car bottle carries out aerating by filling machine, and when filling machine is no longer car bottle aerating, the compression through compressor makes rock gas enter middle pressure bottle group and bomb group; And when bleed pressure is too low or do not have source of the gas temporarily, namely in source of the gas steam outlet pipe without gas or air pressure too low time, be car bottle aerating by middle pressure bottle group and bomb group, and the gas of middle pressure bottle group can be returned compressor enter bomb group after compression through equilibrium valve, air inlet pipeline, be the aerating of car bottle high pressure again.Can be found out by above-mentioned, when using this device for car bottle aerating, no longer need frequent starting compressor, and when there is no source of the gas or bleed pressure is too low, still can be car bottle aerating.
In sum, the utility model effectively prevent high frequent and starts, and substantially prolongs the working life of compressor, and when bleed pressure is too low or without source of the gas, can is still car bottle aerating, improves the working efficiency of this aerator.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in further detail:
Fig. 1 is the structural representation of a kind of embodiment of the utility model.
Embodiment
As shown in Figure 1, for convenience of describing, front and back position on pipeline refers to the flow direction along rock gas, namely rock gas flows to rear portion from the front portion of following pipeline, this gas station compressor three line aerator comprises filling machine 1, compressor 2 and source of the gas steam outlet pipe 3, the concrete structure of above-mentioned filling machine 1 is prior art, do not repeat them here, filling machine 1 is connected with pressure duct 11, middle pressure pipe road 12 and low pressure line 13, filling machine 1 is connected with gas outlet tube 19, be car bottle 17 aerating by gas outlet tube 16, filling machine 1 is by pressure duct 11, the connectivity structure that middle pressure pipe road 12 and low pressure line 13 carry out aerating respectively by gas outlet tube 19 is prior art, the inlet end of low pressure line 13 is connected on source of the gas steam outlet pipe 3, the inlet end of source of the gas steam outlet pipe 3 is connected on source of the gas 18, source of the gas steam outlet pipe 3 is connected to the inlet end of compressor 2 by air inlet pipeline 4, this compressor 2 adopts the structure of multistage compression, its concrete structure is prior art, do not repeat them here, the gas outlet tube road 21 of compressor 2 respectively with pressure duct 11, middle pressure pipe road 12 connects, pressure duct 11 is connected with bomb group 5 by bypass branch, middle pressure pipe road 12 is connected with middle pressure bottle group 6 by bypass branch, above-mentioned bomb group and middle pressure bottle group arrange valve respectively, the turnover of rock gas can be controlled, air inlet pipeline 4 is connected with after going to, is connected with breather check valve 7 and low-pressure inlet valve 8, middle pressure pipe road 12 is equipped with the pressure inlet valve 9 being arranged in its bypass branch front successively after going to, the high pressure check valve 10 being positioned at its bypass branch front pressure duct 11 is equipped with, middle pressure pipe road 12 and air inlet pipeline 4 are connected with equilibrium valve 16 between the pipeline section at breather check valve 7 rear, this high pressure check valve 10 can control rock gas can only flow to filling machine direction from the direction of compressor, above-mentioned air inlet pipeline 4, pressure transmitter 14 is equipped with on pressure duct 11 and middle pressure pipe road 12 respectively, pressure in above-mentioned pipeline can detect by this pressure transmitter 14 in time, bomb group 5, middle pressure bottle group 6, equilibrium valve 16, breather check valve 7, low-pressure inlet valve 8, middle pressure inlet valve 9, high pressure check valve 10 is all controlled by PLC 20, the pressure signal detected sends to PLC 20, control cut-offfing of each valve above-mentioned and bottle group more as required, filling machine 1 is electrically connected with PLC, in the present embodiment, PLC 20 can be integrated in filling machine 1, for convenience of description, in figure, it is extracted from filling machine, the concrete structure of the break-make that PLC 20 receives pressure signal and controls each valve above-mentioned is prior art, those skilled in the art can select suitable PLC according to following course of action and prior art and realize corresponding linkage structure, concrete connection signal does not illustrate in the drawings.In the present embodiment, pressure duct 11 is connected with high pressure entry valve 15, this high pressure entry valve 15 can be normally open valve door, and its effect is when being in an emergency, and gas circuit is cut off in the closedown by this valve.
As shown in Figure 1, when this aerator is car bottle aerating, the first situation, if source of the gas is sufficient, natural gas via source of the gas steam outlet pipe 3, inflated to automobiles bottle 17 by filling machine 1 after low pressure line 13, when filling machine 1 detects that the pressure of automobiles bottle 17 is equal with the pressure in low pressure line 13, low pressure line 13 is cut off pressure pipe road 12 in rear connection by filling machine 1, now, during gas in middle pressure bottle group 6 passes through, pressure pipe road 12 is to car bottle 17 aerating, according to setting value, middle pressure bottle group 4 has certain initial pressure, therefore by middle pressure bottle group 6 in the process of car bottle 17 aerating, compressor does not start, in the middle of the pressure of pressure bottle group 6 decline when can not carry out aerating gradually, middle pressure pipe road 6 cuts off and connects pressure duct 11 by filling machine 1, filling machine 1 by bomb group 5 to car bottle 17 aerating, therefore by process from bomb group 5 to car bottle aerating converge in, compressor does not also start, until aerating completes, above-mentioned whole process is all controlled to carry out by PLC, the second situation, when the gas pressure of central pressure bottle group and bomb group is not enough, compressor starts automatically, open low-pressure inlet valve 8 and breather check valve 7, rock gas enters compressor 2 from source of the gas steam outlet pipe 3 through low-pressure inlet valve 8, through middle pressure inlet valve 9 after supercharging, high pressure check valve 10 enters filling machine 1 respectively, aerating is carried out for car bottle 17 by filling machine 1, and when filling machine 1 is no longer car bottle 17 aerating, compression through compressor 2 makes rock gas enter middle pressure bottle group 6 and bomb group 5, until middle pressure bottle group and bomb group are supplemented full rock gas, the third situation, when bleed pressure is too low or do not have source of the gas temporarily, namely in source of the gas steam outlet pipe 3 without gas or air pressure too low time, be car bottle aerating by middle pressure bottle group 6 and bomb group 5, concrete fueling process can be drawn by above-mentioned, and when the gas in bomb group 5 is not enough, can, by the gas of middle pressure bottle group 6 through returning compressor 2 enter bomb group 5 after compression through equilibrium valve 16, air inlet pipeline 4, be the aerating of car bottle 17 high pressure again.Can be found out by above-mentioned, when using this device for car bottle aerating, no longer need frequent starting compressor, and when there is no source of the gas or bleed pressure is too low, still can be car bottle aerating.
The above is specific constructive form of the present utility model; the utility model is not restricted to the described embodiments; the art personnel, replace all in protection domain of the present utility model based on the equivalent variations of concrete structure on the utility model and parts.

Claims (3)

1. a gas station compressor three line aerator, comprise filling machine (1), compressor (2) and source of the gas steam outlet pipe (3), filling machine (1) is connected with pressure duct (11), middle pressure pipe road (12) and low pressure line (13), it is characterized in that: the inlet end of described low pressure line (13) is connected on source of the gas steam outlet pipe (3), source of the gas steam outlet pipe (3) is connected to the inlet end of compressor (2) by air inlet pipeline (4), the gas outlet tube road (21) of described compressor (2) respectively with pressure duct (11), middle pressure pipe road (12) connects, described pressure duct (11) is connected with bomb group (5) by bypass branch, described middle pressure pipe road (12) is connected with middle pressure bottle group (6) by bypass branch, described air inlet pipeline (4) is connected with after going to, is connected with breather check valve (7) and low-pressure inlet valve (8), described middle pressure pipe road (12) is upper is equipped with the pressure inlet valve (9) being arranged in its bypass branch front successively after going to, the high pressure check valve (10) being positioned at its bypass branch front described pressure duct (11) is equipped with, equilibrium valve (16) is connected with between the pipeline section described middle pressure pipe road (12) and air inlet pipeline (4) being positioned at breather check valve (7) rear, described bomb group (5), middle pressure bottle group (6), breather check valve (7), low-pressure inlet valve (8), equilibrium valve (16), middle pressure inlet valve (9), high pressure check valve (10) is all controlled by PLC, described filling machine (1) is electrically connected with PLC.
2. gas station according to claim 1 compressor three line aerator, is characterized in that: pressure transmitter (14) is equipped with on described air inlet pipeline (4), pressure duct (11) and middle pressure pipe road (12) respectively.
3. gas station according to claim 1 and 2 compressor three line aerator, is characterized in that: described pressure duct (11) is connected with high pressure entry valve (15).
CN201520143564.0U 2015-03-14 2015-03-14 Gas station compressor three line aerator Expired - Fee Related CN204477682U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520143564.0U CN204477682U (en) 2015-03-14 2015-03-14 Gas station compressor three line aerator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520143564.0U CN204477682U (en) 2015-03-14 2015-03-14 Gas station compressor three line aerator

Publications (1)

Publication Number Publication Date
CN204477682U true CN204477682U (en) 2015-07-15

Family

ID=53633473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520143564.0U Expired - Fee Related CN204477682U (en) 2015-03-14 2015-03-14 Gas station compressor three line aerator

Country Status (1)

Country Link
CN (1) CN204477682U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106870947A (en) * 2017-03-21 2017-06-20 四川华亿石油天然气工程有限公司 CNG air entraining substation systems
CN109630886A (en) * 2017-10-09 2019-04-16 安瑞科(廊坊)能源装备集成有限公司 Pressure piping and CNG gas station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106870947A (en) * 2017-03-21 2017-06-20 四川华亿石油天然气工程有限公司 CNG air entraining substation systems
CN109630886A (en) * 2017-10-09 2019-04-16 安瑞科(廊坊)能源装备集成有限公司 Pressure piping and CNG gas station

Similar Documents

Publication Publication Date Title
CN204548515U (en) A kind of aircraft zero minusg fuel feeding pressure charging system
CN201236688Y (en) Carbon dioxide booster pump injection vehicle
CN204477682U (en) Gas station compressor three line aerator
CN200943810Y (en) Self-inflated compressed natural gas conveying vehicle
CN105156241A (en) Diesel engine fuel oil air removal device
CN202657018U (en) Parking braking system
CN204716421U (en) Automobile-used LNG supply system and knock out drum stable-pressure device thereof and commercial vehicle
CN102705702B (en) Auxiliary unit used for hydraulic horizontal-pushing pressurizer and hydraulic horizontal-pushing pressurizer
CN206242932U (en) Electric mine locomotive control system
CN210014208U (en) Device for improving HCNG unloading efficiency and saving energy
CN102102614A (en) Reducing pressure on common rail with rapid pressure accumulation
CN204452588U (en) The assist steering system of articulated vehicle
CN202834724U (en) Gas filling device for CNG (compressed natural gas) passenger car and CNG passenger car
CN100542860C (en) Secondary gas filling station self-complementing voltage-stabilizing charging method and device
CN203958123U (en) The regenerative brake fast aeration system of servo control
CN210716928U (en) Sequence control valve group
CN204187267U (en) A kind of hydraulic pressure aerating type bundled tube shipping container
CN204358433U (en) A kind ofly add gas port CNG fuel gas pipeline system for the two of passenger vehicle
CN102808711A (en) Compressed-air oil tank oil supply system
CN103277178B (en) The controlling method of tail-gas recycling device and control gear thereof
CN206329911U (en) A kind of L CNG prying bodies direct-furnish liquid device
CN203427767U (en) Vehicle-mounted type inflation system
CN204254250U (en) Hydraulic horizontal-pushing double-track gas filling substation
CN206049345U (en) CNG combustion gas series commercial car aerator
CN203832476U (en) Auxiliary air providing system for braking of hybrid electric vehicle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20210314

CF01 Termination of patent right due to non-payment of annual fee