CN204457889U - A kind of water chiller exhaust steam shunting spike cooling system - Google Patents

A kind of water chiller exhaust steam shunting spike cooling system Download PDF

Info

Publication number
CN204457889U
CN204457889U CN201520004678.7U CN201520004678U CN204457889U CN 204457889 U CN204457889 U CN 204457889U CN 201520004678 U CN201520004678 U CN 201520004678U CN 204457889 U CN204457889 U CN 204457889U
Authority
CN
China
Prior art keywords
vapour condenser
cooling
outlet
exhaust steam
entrance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520004678.7U
Other languages
Chinese (zh)
Inventor
奚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Hanhai Hydrogen Energy Technology Co ltd
Original Assignee
Shaanxi Is Energy-Conservation Science And Technology Co Ltd Incomparably
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Is Energy-Conservation Science And Technology Co Ltd Incomparably filed Critical Shaanxi Is Energy-Conservation Science And Technology Co Ltd Incomparably
Priority to CN201520004678.7U priority Critical patent/CN204457889U/en
Application granted granted Critical
Publication of CN204457889U publication Critical patent/CN204457889U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model discloses a kind of water chiller exhaust steam shunting spike cooling system, comprise steam turbine, the exhaust steam outlet point two-way of steam turbine, two-way is connected with the exhaust steam entrance of the second vapour condenser with the first vapour condenser respectively, an outlet of the first vapour condenser is connected with the entrance of mechanical force cooling column, the outlet of mechanical force cooling column is connected with the cooling entrance of the first vapour condenser after circulating water pump, an outlet of the second vapour condenser is connected with the entrance of cooling tower, the outlet of cooling tower is connected with the cooling entrance of the second vapour condenser after circulating water pump, the water of condensation outlet of the first vapour condenser and the second vapour condenser is after the condensation pump on respective pipeline, merge into water of condensation to flow out.By extracting a part of exhaust steam out in turbine discharge outlet, neither affect the normal operation of original system, only reduce the heat exchange load of former cooling tower, the shunting cooling condensation of exhaust steam in steam turbine is realized by this system, improve cooling effectiveness and generating efficiency, reduce unit back pressuce, thus reduce gross coal consumption rate.

Description

A kind of water chiller exhaust steam shunting spike cooling system
Technical field
The utility model belongs to Turbine Cold Junction efficiency enhancing techniques field, relates to a kind of water chiller exhaust steam shunting spike cooling system.
Background technique
Along with global warming, thermal power plant generation load is affected by environment increasing, in the season that temperature is higher, the cooling tower that cooling tower poor effect, the particularly time limit is longer, because filler is aging, distribution pipe fouling, recycle pump undercapacity etc. cause cooling effectiveness to reduce, and unit back pressuce raises, and reduce unit generation efficiency, even summer peak of power consumption can not completely send out, considerably increase gross coal consumption rate.Coal, as non-renewable resources, with regard to national conditions, although CHINESE COAL reserves enrich, has one day that is finished sooner or later.Therefore be the strategy of sustainable development of response country, power industry need be sparing in the use of coal, and to respond national policy, exchanges a large amount of non-renewable resources for a small amount of renewable resources.And the circulating water in power plant can quote municipal middle water, industrial wastewater carries out secondary utilization.As can be seen here, gross coal consumption rate is reduced imperative.
Model utility content
The utility model, in order to solve the problems of the technologies described above, provide a kind of water chiller exhaust steam shunting spike cooling system, improves cooling effectiveness and generating efficiency, reduce unit back pressuce, thus reduce gross coal consumption rate.
The utility model is achieved through the following technical solutions:
A kind of water chiller exhaust steam shunting spike cooling system, comprise steam turbine, the exhaust steam outlet point two-way of described steam turbine, two-way is connected with the exhaust steam entrance of the second vapour condenser with the first vapour condenser respectively, an outlet of the first vapour condenser is connected with the entrance of mechanical force cooling column, the outlet of mechanical force cooling column is connected with the cooling entrance of the first vapour condenser after circulating water pump, an outlet of the second vapour condenser is connected with the entrance of cooling tower, the outlet of cooling tower is connected with the cooling entrance of the second vapour condenser after circulating water pump, the water of condensation outlet of the first vapour condenser and the second vapour condenser is after the condensation pump on respective pipeline, merge into water of condensation to flow out from condensation jellyfish pipe.
The exhaust steam outlet point two-way of described steam turbine, two-way exhaust steam flows into the exhaust steam entrance of the first vapour condenser and the second vapour condenser respectively through the extraction line be connected with steam turbine.
Compared with prior art, the utility model has following useful technique effect:
The water chiller exhaust steam shunting spike cooling system that the utility model provides, by extracting a part of exhaust steam out in turbine discharge outlet, after exhaust steam shunting, vapour condenser is entered by extraction line, after heat exchange in vapour condenser cools, be condensed into water of condensation through circulating water, water of condensation enters condensation jellyfish pipe by condensate pump.Circulating water after heat exchange enters vapour condenser heat exchange through circulating water pump again after being dispelled the heat by mechanical force cooling column.Like this, by extracting a part of exhaust steam out in turbine discharge outlet, neither affecting the normal operation of original system, only reducing the heat exchange load of former cooling tower, realized the shunting cooling condensation of exhaust steam in steam turbine by this cooling system.
Meanwhile, original cooling-tower circulating water amount is constant, but heat exchange amount reduces, and circulating water temperature reduces, and the temperature that circulating water enters vapour condenser also can reduce, and the heat transfer effect of circulating water in vapour condenser strengthens, and turbine back pressure reduces, and reduces gross coal consumption rate.
The utility model, for the high problem of domestic thermal power generation unit coal consumption, for cost-saving, reduces coal resources waste, increase economic efficiency, realizing the shunting cooling condensation of exhaust steam in steam turbine by increasing mechanical force cooling column, reducing the heat exchange load of original cooling tower, not affecting on the basis of original system, greatly improve unit cooling effectiveness, reduce unit back pressuce, final realization reduces gross coal consumption rate, cost-saving, reduce airborne release, reach the two receipts of ecnomics and enviroment benefit.
Accompanying drawing explanation
The water chiller exhaust steam shunting spike cooling system structure schematic diagram that Fig. 1 provides for the utility model.
Wherein: 1 is mechanical force cooling column; 2 is circulating water pump; 3 is condensation pump; 4 is the first vapour condenser; 5 is cooling tower; 6 is steam turbine; 7 is extraction line; 8 is water of condensation; 9 is the second vapour condenser.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail:
See Fig. 1, a kind of water chiller exhaust steam shunting spike cooling system, comprise steam turbine 6, the exhaust steam outlet point two-way of described steam turbine 6, two-way exhaust steam flows into the exhaust steam entrance of the first vapour condenser 4 and the second vapour condenser 9 respectively through extraction line 7, extraction line 7 one end exports with the exhaust steam of steam turbine 6 and is connected, the other end is connected with the second vapour condenser 9 exhaust steam entrance with the first vapour condenser 4 respectively, an outlet of the first vapour condenser 4 is connected with the entrance of mechanical force cooling column 1, the outlet of mechanical force cooling column 1 is connected with the cooling entrance of the first vapour condenser 4 after circulating water pump 2, an outlet of the second vapour condenser 9 is connected with the entrance of cooling tower 5, the outlet of cooling tower 5 is connected with the cooling entrance of the second vapour condenser 9 after circulating water pump 2, the water of condensation outlet of the first vapour condenser 4 and the second vapour condenser 9 is after the condensation pump 3 on respective pipeline, merge into water of condensation 8 to flow out from condensation jellyfish pipe.
The utility model is for the high problem of domestic thermal power generation unit coal consumption, for cost-saving, reduce coal resources waste, increasing economic efficiency, extract a part of exhaust steam out at exhaust steam in steam turbine outlet position, realizing the shunting cooling condensation of exhaust steam in steam turbine by increasing mechanical force cooling column, reduce the heat exchange load of original cooling tower, improve cooling effectiveness, reduce unit back pressuce, final realization reduces gross coal consumption rate.Newly-increased system adopts tight calculating, is not affecting on the basis of original system, improves cooling effectiveness, improves unit efficiency, reaches effect of coal saving.
This system can improve unit cooling effectiveness greatly, improves the performance driving economy of power station, reduces gross coal consumption rate, cost-saving, reduces airborne release, reaches the two receipts of ecnomics and enviroment benefit.
More than show and describe basic principle of the present utility model and major character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and specification just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (2)

1. a water chiller exhaust steam shunting spike cooling system, it is characterized in that, comprise steam turbine (6), the exhaust steam outlet point two-way of described steam turbine (6), two-way is connected with the exhaust steam entrance of the first vapour condenser (4) with the second vapour condenser (9) respectively, an outlet of the first vapour condenser (4) is connected with the entrance of mechanical force cooling column (1), the outlet of mechanical force cooling column (1) is connected with the cooling entrance of the first vapour condenser (4) after circulating water pump (2), an outlet of the second vapour condenser (9) is connected with the entrance of cooling tower (5), the outlet of cooling tower (5) is connected with the cooling entrance of the second vapour condenser (9) after circulating water pump (2), the water of condensation outlet of the first vapour condenser (4) and the second vapour condenser (9) is after the condensation pump (3) on respective pipeline, merge into water of condensation (8) to flow out.
2. water chiller exhaust steam shunting spike cooling system according to claim 1, it is characterized in that, the exhaust steam outlet point two-way of described steam turbine (6), two-way exhaust steam flows into the exhaust steam entrance of the first vapour condenser (4) and the second vapour condenser (9) respectively through the extraction line (7) be connected with steam turbine (6).
CN201520004678.7U 2015-01-05 2015-01-05 A kind of water chiller exhaust steam shunting spike cooling system Active CN204457889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520004678.7U CN204457889U (en) 2015-01-05 2015-01-05 A kind of water chiller exhaust steam shunting spike cooling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520004678.7U CN204457889U (en) 2015-01-05 2015-01-05 A kind of water chiller exhaust steam shunting spike cooling system

Publications (1)

Publication Number Publication Date
CN204457889U true CN204457889U (en) 2015-07-08

Family

ID=53664791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520004678.7U Active CN204457889U (en) 2015-01-05 2015-01-05 A kind of water chiller exhaust steam shunting spike cooling system

Country Status (1)

Country Link
CN (1) CN204457889U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518719A (en) * 2018-03-30 2018-09-11 大连葆光节能空调设备厂 A kind of big temperature-difference central heating system using double condensers

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518719A (en) * 2018-03-30 2018-09-11 大连葆光节能空调设备厂 A kind of big temperature-difference central heating system using double condensers

Similar Documents

Publication Publication Date Title
KR102198868B1 (en) Electric power peak-shaving and combined heat and power waste heat recovery device and operation method thereof
CN204730303U (en) The heating system of the 12MW small cogeneration unit under a kind of underrun operating mode
CN202007693U (en) Recovery device for low-temperature waste heat in power plant
CN203757824U (en) Heat supply system capable of reducing return water temperature of primary network
CN104481611A (en) Dead steam waste heat recovery system based on large temperature difference heat exchange technology
CN102032612A (en) Cogeneration energy-saving device and method using residual heat of direct air-cooling unit to supply heat
CN102022770A (en) Heat and power cogeneration energy-saving device and method for supplying heat by using direct waste heat of air-cooling unit
CN203203020U (en) Steam waste heat water recycling device for machining paper
CN103302826B (en) A kind of injection mold is cooled with circulating water method
CN203628786U (en) High-backpressure heat supply serially connected two-stage heating system
CN204457889U (en) A kind of water chiller exhaust steam shunting spike cooling system
CN201836967U (en) Cogeneration energy saving device utilizing waste heat of direct air cooling unit for heat supply
CN105588108A (en) System for replenishing water to steam boiler by means of steam condensate
CN209195495U (en) A kind of embedded thermoelectricity peak regulation system of photo-thermal
CN203489341U (en) Superlarge temperature difference heat supply network waste heat heating system combined with low-vacuum injection type heat pump
CN201836968U (en) Cogeneration energy saving device utilizing waste heat of indirect air cooling unit for heat supply
CN202692214U (en) Novel direct air-cooling unit high-efficiency heating system
CN205172659U (en) Synthesize refrigerated double reheat unit thermodynamic system
CN202470474U (en) Double-heat-source heat pump water heating system using air energy and solar energy
CN106219650B (en) Low-quality waste heat utilization system of steel plant and use method thereof
CN203533512U (en) Small-sized cogeneration device
CN204492908U (en) A kind of exhaust steam residual heat reclaiming system based on large temperature difference technology
CN204691834U (en) A kind of energy-saving and emission-reduction system utilizing low-grade extraction for heat supply
CN203335149U (en) Mixed type heating structure of moisture cooling air cooling unit condensation water
CN202532582U (en) Waste heat recycle system for circulating water of heating unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Water chilling unit waste steam flow diversion peak cooling system

Effective date of registration: 20170727

Granted publication date: 20150708

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: SHAANXI WANFANG ENERGY SAVING SCIENCE & TECHNOLOGY Co.,Ltd.

Registration number: 2017610000079

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20191217

Granted publication date: 20150708

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: SHAANXI WANFANG ENERGY SAVING SCIENCE & TECHNOLOGY Co.,Ltd.

Registration number: 2017610000079

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Water chilling unit waste steam flow diversion peak cooling system

Effective date of registration: 20191220

Granted publication date: 20150708

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: SHAANXI WANFANG ENERGY SAVING SCIENCE & TECHNOLOGY Co.,Ltd.

Registration number: Y2019610000059

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220125

Granted publication date: 20150708

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: SHAANXI WANFANG ENERGY SAVING SCIENCE & TECHNOLOGY CO.,LTD.

Registration number: Y2019610000059

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Exhaust steam split peak cooling system of water cooling unit

Effective date of registration: 20220127

Granted publication date: 20150708

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: SHAANXI WANFANG ENERGY SAVING SCIENCE & TECHNOLOGY CO.,LTD.

Registration number: Y2022610000006

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230731

Address after: 710061 112211, Block C, Huicheng Tianxi Hotel, South Section of Zhuque Street, Yanta District, Xi'an, Shaanxi

Patentee after: Shaanxi Hanhai Hydrogen Energy Technology Co.,Ltd.

Address before: 710000 No. 3, Keji 7th Road, High tech Zone, Xi'an City, Shaanxi Province

Patentee before: SHAANXI WANFANG ENERGY SAVING SCIENCE & TECHNOLOGY CO.,LTD.