CN204455842U - Bridge precast beam plate plays roof beam structure - Google Patents
Bridge precast beam plate plays roof beam structure Download PDFInfo
- Publication number
- CN204455842U CN204455842U CN201520094289.8U CN201520094289U CN204455842U CN 204455842 U CN204455842 U CN 204455842U CN 201520094289 U CN201520094289 U CN 201520094289U CN 204455842 U CN204455842 U CN 204455842U
- Authority
- CN
- China
- Prior art keywords
- lifting
- precast beam
- bracing frame
- suspender
- roof beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of reduction construction cost, the bridge precast beam plate reducing construction area area plays roof beam structure.Described bridge precast beam plate plays roof beam structure, comprises bracing frame, supporting traverse, lifting gear and suspender; Support frame as described above has lifting spacing, and described lifting spacing is made up of to upper end extension the lower ending opening of bracing frame; Described lifting gear is arranged on the upper end of bracing frame, and between bracing frame and supporting traverse; Described suspender is arranged on supporting traverse, and described suspender extends in lifting spacing.Adopt this to play roof beam structure and can effectively reduce construction cost, reduce lifting floor space, increase work efficiency simultaneously, reduce Hoisting Security hidden danger, add the safety of precast beam lifting.
Description
Technical field
The utility model relates to a kind of hanging apparatus, and especially a kind of bridge precast beam plate plays roof beam structure.
Background technology
Known: in the work progress of bridge, need to install precast beam.Need to lift precast beam when installing precast beam.Traditional mode all adopts across pier straddle truck or large-tonnage crane beam.But when in bridge construction, precast beam is less, adopt across pier straddle truck or large-tonnage crane beam, working measure costly, is unfavorable for construction cost control.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of reduction construction cost, and the bridge precast beam plate reducing construction area area plays roof beam structure.
The utility model solves the technical scheme that its technical problem adopts: bridge precast beam plate plays roof beam structure, comprises bracing frame, supporting traverse, lifting gear and suspender;
Support frame as described above has lifting spacing, and described lifting spacing is made up of to upper end extension the lower ending opening of bracing frame; Described lifting gear is arranged on the upper end of bracing frame, and between bracing frame and supporting traverse; Described suspender is arranged on supporting traverse, and described suspender extends in lifting spacing.
Preferably, institute's suspender comprises fining twisted steel and fining twisted steel nut; One end of described fining twisted steel is fixed on supporting traverse by fining twisted steel nut, and the other end of described fining twisted steel extends in lifting spacing.
Preferably, described lifting gear adopts hydraulic cylinder or pneumatic cylinder.
Further, support frame as described above comprises brace summer and two row's support columns; Described support column is arranged side by side, and forms lifting spacing between described two row's support columns; Described brace summer is arranged on support column top.
Further, described support column lower end is provided with installing plate.
The beneficial effects of the utility model are: bridge precast beam plate described in the utility model plays roof beam structure, by establishing lifting spacing on bracing frame, supporting traverse is set on bracing frame simultaneously, and lifting gear is set between supporting traverse and bracing frame, mounting hanger on supporting traverse, thus being elevated supporting traverse by lifting gear, supporting traverse realizes the lifting to precast beam by suspender.Thus avoid adopt across pier straddle truck or large-tonnage crane, beam is carried out to precast beam.Therefore bridge precast beam plate described in the utility model plays roof beam structure, can effectively reduce construction cost, reduces lifting floor space, increases work efficiency simultaneously, reduce Hoisting Security hidden danger, add the safety of precast beam lifting.
Accompanying drawing explanation
Fig. 1 is the elevation that the utility model embodiment Bridge precast beam plays roof beam structure;
Fig. 2 is the lateral view that the utility model embodiment Bridge precast beam plays roof beam structure;
Indicate in figure: 1-bracing frame, 11-brace summer, 12-support column, 13-lifts spacing, 14-installing plate, 2-supporting traverse, 3-lifting gear, 4-suspender, 41-fining twisted steel, 42-fining twisted steel nut, 5-precast beam.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As depicted in figs. 1 and 2, bridge precast beam plate plays roof beam structure, and bridge precast beam plate plays roof beam structure, comprises bracing frame 1, supporting traverse 2, lifting gear 3 and suspender 4;
Support frame as described above 1 has lifting spacing 13, and described lifting spacing 13 is made up of to upper end extension the lower ending opening of bracing frame 1; Described lifting gear 3 is arranged on the upper end of bracing frame 1, and between bracing frame 1 and supporting traverse 2; Described suspender 4 is arranged on supporting traverse 2, and described suspender 4 extends in lifting spacing 13.
The Main Function of described lifting gear 3 is lifting supporting traverse 2.When the upper end of support frame as described above 1 refers to that bracing frame 1 is installed, one end is upwards the upper end of bracing frame 1, the one end contacted with installation foundation ground or mounting platform when the lower end of support frame as described above 1 refers to that bracing frame 1 is installed.
Described lifting spacing 13 refers to the lifting space of hoisting prefabricated beam slab 5.As shown in Figure 1, support frame as described above 1 has lifting spacing 13; Described lifting spacing 13 is made up of to upper end extension the lower ending opening of bracing frame 1; Refer to lifting space bracing frame 1 being provided with hoisting prefabricated beam slab 5, and lifting spacing 13 is positioned at the centre of bracing frame 1, and is extended to the upper end of bracing frame 1 by the bottom end opening of bracing frame 1.Such as, bracing frame 1 one-tenth door font or arch-shaped.
In the process of application: the size of carrying out the precast beam 5 lifted first as required, two groups of bridge precast beam plates are set and play roof beam structure, two groups of bridge precast beam plates being played roof beam structure is arranged on basis (ground or mounting platform), and described two groups of bridge precast beam plate spacing risen between roof beam structure are less than the length of precast beam 5.
When lifting precast beam 5, first connected the two ends of precast beam 5 by suspender 4.Then start lifting gear 3, described lifting gear 3 drives supporting traverse 2 to rise.Because suspender 4 is arranged on supporting traverse 2, therefore supporting traverse 2 drives suspender 4 to rise, thus makes precast beam 5 increase along with suspender 4.After precast beam 5 rises to certain altitude, braking lifting gear; Then Beam transportation vehicle is reached the below of precast beam 5, make the compartment of Beam transportation vehicle be positioned at immediately below precast beam 5; Again starting lifting gear 3 makes precast beam 5 decline, and drops on compartment.Then unclamp suspender 4, the Beam transportation vehicle that drives away completes the lifting of precast beam 5.
In sum, the bridge precast beam plate described in this practicality rise roof beam structure due to structure simple, manufacturing cost is lower, therefore, it is possible to reduce construction cost, avoids adopting and carries out beam across pier straddle truck or large-tonnage crane to precast beam and increase cost.Bridge precast beam plate simultaneously described in this practicality plays roof beam structure in the hoisting process realizing precast beam 5, only needs staff to carry out suspender 4 when precast beam 5 is not sling and connects and in hoisting process, start lifting gear 3.But in the process of lifting, needing staffing when adopting large-tonnage crane to lift in conventional method, guarantee precast beam 5 can be lifted on correct position, simultaneously less stable in the process of lifting.Therefore bridge precast beam plate described in the utility model rise roof beam structure application process in drop into manually less, effectively can increase efficiency of construction, reduce construction cost, reduce construction risk, increase construction safety.When adopting large-tonnage crane to lift, crane needs construction plant, and Beam transportation vehicle needs construction plant, and floor space is large simultaneously.But bridge precast beam plate described in the utility model plays roof beam structure when lifting, Beam transportation vehicle directly reaches bridge precast beam plate and rises below roof beam structure, can effectively reduce construction area area.
Described suspender 4 can adopt various ways, and institute's suspender 4 adopts Chain block or wire rope.When suspender adopts Chain block, height and the gradient of precast beam 5 can be regulated when having lifted.When suspender 4 adopts wire rope, cost can be effectively reduced.In order to ensure the stationarity of precast beam 5 in hoisting process.Preferably as depicted in figs. 1 and 2, institute's suspender 4 comprises fining twisted steel 41 and fining twisted steel nut 42; One end of described fining twisted steel 41 is fixed on supporting traverse 2 by fining twisted steel nut 42, and the other end of described fining twisted steel 41 extends in lifting spacing 13.In the process that suspender 4 is connected with precast beam 5, fining twisted steel 41 through the prefabrication and lifting hole that precast beam 5 is arranged, then at fining twisted steel 41 through fining twisted steel nut 42 of screwing in one end of precast beam 5; Thus realize the connection of suspender 4 and precast beam 5.Because fining twisted steel 41 is stiffener, therefore, it is possible to ensure the stability of precast beam 5 in beam process.
The Main Function of described lifting gear 3 is lifting supporting traverses 2; Described lifting gear 3 can adopt various ways, such as mechanic jacks etc., but adopts jack range demands higher, simultaneously not easy to operate.In order to make whole roof beam structure more steady, simultaneously easy and simple to handle in the process of beam, therefore preferably as shown in Figure 1, described lifting gear 3 adopts hydraulic cylinder or pneumatic cylinder.Realize the lifting to supporting traverse 2 by hydraulic cylinder or cylinder, its lifting force is comparatively large and steady.The construction risk in precast beam 5 beam process can be reduced.
In order to be convenient to manufacture bracing frame 1 at construction site; The manufacturing cost of further reduction bracing frame 1.As depicted in figs. 1 and 2, support frame as described above 1 comprises brace summer 11 and two row's support columns 12; Described support column 12 is arranged side by side, and forms lifting spacing 13 between described two row's support columns 12; Described brace summer 11 is arranged on support column 12 top.Bracing frame 1 adopts combinations thereof mode, can utilize discarded steel pipe, steel plate, i beam etc. in construction plant, weld, effectively can utilize waste resource to bracing frame 1, reduces construction cost.
Steady during in order to ensure that bracing frame 1 is installed, further, described support column 12 lower end is provided with installing plate 14.Described installing plate 14 forms support lugn in support column 12 lower end, can make the more stable impact not being vulnerable to out-of-flatness installed surface on installation foundation of support column 12, add bracing frame 1 and install adaptive capacity.
Claims (5)
1. bridge precast beam plate plays roof beam structure, it is characterized in that: comprise bracing frame (1), supporting traverse (2), lifting gear (3) and suspender (4);
Support frame as described above (1) has lifting spacing (13), and described lifting spacing (13) is made up of to upper end extension the lower ending opening of bracing frame (1); Described lifting gear (3) is arranged on the upper end of bracing frame (1), and is positioned between bracing frame (1) and supporting traverse (2); Described suspender (4) is arranged on supporting traverse (2), and described suspender (4) extends in lifting spacing (13).
2. bridge precast beam plate as claimed in claim 1 plays roof beam structure, it is characterized in that: described suspender (4) comprises fining twisted steel (41) and fining twisted steel nut (42); One end of described fining twisted steel (41) is fixed on supporting traverse (2) by fining twisted steel nut (42), and the other end of described fining twisted steel (41) extends in lifting spacing (13).
3. bridge precast beam plate as claimed in claim 2 plays roof beam structure, it is characterized in that: described lifting gear (3) adopts hydraulic cylinder or pneumatic cylinder.
4. bridge precast beam plate as claimed in claim 2 plays roof beam structure, it is characterized in that: support frame as described above (1) comprises brace summer (11) and two rows' support column (12); Described support column (12) is arranged side by side, and forms lifting spacing (13) between described two rows' support column (12); Described brace summer (11) is arranged on support column (12) top.
5. bridge precast beam plate as claimed in claim 4 plays roof beam structure, it is characterized in that: described support column (12) lower end is provided with installing plate (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520094289.8U CN204455842U (en) | 2015-02-10 | 2015-02-10 | Bridge precast beam plate plays roof beam structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520094289.8U CN204455842U (en) | 2015-02-10 | 2015-02-10 | Bridge precast beam plate plays roof beam structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204455842U true CN204455842U (en) | 2015-07-08 |
Family
ID=53662751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520094289.8U Active CN204455842U (en) | 2015-02-10 | 2015-02-10 | Bridge precast beam plate plays roof beam structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204455842U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105937206A (en) * | 2016-05-05 | 2016-09-14 | 武汉市创先专利技术服务有限公司 | Prefabricated assembly type viaduct bridge plate and installation device thereof |
CN106869036A (en) * | 2017-04-12 | 2017-06-20 | 汤福明 | Novel bridge precast beam and its construction method |
CN106988171A (en) * | 2017-03-13 | 2017-07-28 | 广东韶钢工程技术有限公司 | A kind of rail lifting device |
CN108413132A (en) * | 2018-04-16 | 2018-08-17 | 天津市管道工程集团有限公司 | A kind of existing pipeline reinforcement protection adjustable hanging board device and construction method |
-
2015
- 2015-02-10 CN CN201520094289.8U patent/CN204455842U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105937206A (en) * | 2016-05-05 | 2016-09-14 | 武汉市创先专利技术服务有限公司 | Prefabricated assembly type viaduct bridge plate and installation device thereof |
CN106988171A (en) * | 2017-03-13 | 2017-07-28 | 广东韶钢工程技术有限公司 | A kind of rail lifting device |
CN106869036A (en) * | 2017-04-12 | 2017-06-20 | 汤福明 | Novel bridge precast beam and its construction method |
CN106869036B (en) * | 2017-04-12 | 2019-06-04 | 汤福明 | Novel bridge precast beam |
CN108413132A (en) * | 2018-04-16 | 2018-08-17 | 天津市管道工程集团有限公司 | A kind of existing pipeline reinforcement protection adjustable hanging board device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202023360U (en) | Hydraulic climbing die plate for building construction | |
CN204455842U (en) | Bridge precast beam plate plays roof beam structure | |
CN102661054B (en) | Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method | |
CN202450774U (en) | Shaft template of small-step-pitch self-climbing elevator | |
CN104150353B (en) | A kind of dismountable bridge crane of liftable | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN205575428U (en) | Component hoist and mount system | |
CN102910532A (en) | Method for butting and hoisting large box type derricks in air | |
CN202482772U (en) | Collapse-proof stop block mounting system for railway bridge | |
CN203684113U (en) | Automatic beam placement platform device | |
CN203129025U (en) | Suspension fixing device for hanging basket | |
CN206680101U (en) | A kind of simple and convenient guardrail model sheetinstallat chassis | |
CN102041779A (en) | Erection crane and construction method thereof | |
CN203715115U (en) | Supporting point structure for self-hoisting system of portal crane | |
CN201577351U (en) | Greenhouse truss crawler-type lifting erecting equipment | |
CN203867198U (en) | Slip equipment for high-rise steel structure transfer layer truss | |
CN103726449B (en) | Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof | |
CN203295982U (en) | Hanging basket lifting system | |
CN207047703U (en) | A kind of beam piece prestressed stretch-draw jack easy device in place | |
CN202689498U (en) | Liftable scaffold for simple and easy building outer wall | |
CN101664963B (en) | Multifunctional operating platform for large-volume prestressed concrete box girder tensioning | |
CN201943006U (en) | Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders | |
CN209618736U (en) | Jacking apparatus is climbed in a kind of derrick crane | |
CN202829498U (en) | Hydraulic jacking device | |
CN204023414U (en) | The few fulcrum support entirety of a kind of novel large falls rack device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |