CN204438840U - Cooling tower air cooling auxiliary equipment - Google Patents

Cooling tower air cooling auxiliary equipment Download PDF

Info

Publication number
CN204438840U
CN204438840U CN201520081794.9U CN201520081794U CN204438840U CN 204438840 U CN204438840 U CN 204438840U CN 201520081794 U CN201520081794 U CN 201520081794U CN 204438840 U CN204438840 U CN 204438840U
Authority
CN
China
Prior art keywords
heat exchange
annular space
sleeve heat
fin sleeve
tube bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520081794.9U
Other languages
Chinese (zh)
Inventor
李金鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong beno cooling equipment Co.,Ltd.
Original Assignee
李金鹏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李金鹏 filed Critical 李金鹏
Priority to CN201520081794.9U priority Critical patent/CN204438840U/en
Application granted granted Critical
Publication of CN204438840U publication Critical patent/CN204438840U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation By Low-Temperature Treatments (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

A kind of cooling tower air cooling auxiliary equipment is primarily of tower body, air-introduced machine, fin sleeve heat exchange is restrained, screen pack forms, air-introduced machine is arranged on the top of tower body, the tube bank of fin sleeve heat exchange is arranged on the inside of tower body, fin sleeve heat exchange tube bank below arranges screen pack, described fin sleeve heat exchange tube bank is made up of some finned condensation pipes, the two ends of fin sleeve heat exchange tube bank arrange header tank respectively, the arranged outside water inlet of one of them header tank, another header tank arranged outside delivery port, the inner side of two header tanks is connected with the interior light pipe of finned condensation pipe, the inner side of two header tanks arranges annular space bobbin carriage, two annular space bobbin carriages arrange charging aperture respectively, the inner side of two annular space bobbin carriages is connected with the annular space passage of finned condensation pipe respectively.

Description

Cooling tower air cooling auxiliary equipment
Technical field
The utility model relates to a kind of installation for steam condensation, particularly a kind of cooling tower air cooling auxiliary equipment.
Background technology
In reality, often run into such situation: because of production scale expand or original installation for steam condensation aging, make original installation for steam condensation not meet need of production.At this moment the method solution that existing equipment is carried out upgrading or updated the equipment generally is taked.Said method not only cost is high, and the cycle is long, consume energy high, water consumption is large.
Summary of the invention
The purpose of this utility model is to provide a kind of cooling tower air cooling auxiliary equipment, to change or improvement cost is high, the cycle is long, consume energy high, that water consumption is large problem to solve used equipment.
The utility model is primarily of tower body, air-introduced machine, fin sleeve heat exchange is restrained, screen pack forms, the technical scheme solving its technical problem is: air-introduced machine is arranged on the top of tower body, the tube bank of fin sleeve heat exchange is arranged on the inside of tower body, fin sleeve heat exchange tube bank below arranges screen pack, described fin sleeve heat exchange tube bank is made up of some finned condensation pipes, the two ends of fin sleeve heat exchange tube bank arrange header tank respectively, the arranged outside water inlet of one of them header tank, another header tank arranged outside delivery port, the inner side of two header tanks is connected with the interior light pipe of finned condensation pipe, the inner side of two header tanks arranges annular space bobbin carriage, two annular space bobbin carriages arrange charging aperture respectively, the inner side of two annular space bobbin carriages is connected with the annular space passage of finned condensation pipe respectively.
Described finned condensation pipe is set with by an external finned tube and one or more interior light pipe and forms, and arranges some gripper shoes between external finned tube and interior light pipe.
Above-mentioned every platform equipment configuration 1-4 platform air-introduced machine.
This equipment can be concatenated in original pipeline in use and go, and the water inlet of its header tank connects the delivery port of original system recirculated water, and the delivery port of header tank connects the water inlet of original system recirculated water, has that the transformation cycle is short, cost is low, the feature of energy-saving and water-saving.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is the structure chart of the utility model when being connected with original equipment.
In figure: light pipe, 9 annular space passages, 10 air-introduced machines, 11 annular space bobbin carriages, 12 header tanks, 13 delivery ports, 14 charging apertures, 15 screen packs, 16 fin sleeve heat exchange tube banks in 1 tower body, 2 water inlets, 3 header tanks, 4 annular space bobbin carriages, 5 charging apertures, 6 external finned tubes, 7 gripper shoes, 8.
Detailed description of the invention embodiment 1:
As shown in the figure: air-introduced machine 10 is arranged on the top of tower body 1, fin sleeve heat exchange tube bank 16 is arranged on the inside of tower body 1, below fin sleeve heat exchange tube bank 16, screen pack 15 is set, fin sleeve heat exchange tube bank 16 is made up of some finned condensation pipes, the two ends of fin sleeve heat exchange tube bank 16 arrange header tank 3 respectively, 12, the arranged outside water inlet 2 of one of them header tank 3, another header tank 12 arranged outside delivery port 13, two header tanks 3, the inner side of 12 is connected with the interior light pipe 8 that fin sleeve pipe restrains 16, two header tanks 3, the inner side of 12 arranges annular space bobbin carriage 4, 11, two annular space bobbin carriages 4, on 11, charging aperture is set respectively, two annular space bobbin carriages 4, the inner side of 11 restrains 16 respectively annular space passage 9 with fin sleeve heat exchange is connected.
Finned condensation pipe is set with by an external finned tube 6 and an interior light pipe 8 and forms, and arranges gripper shoe 7 between external finned tube 6 and interior light pipe 8.Every platform equipment configuration 2 air-introduced machines.
Embodiment 2: embodiment 2 difference from Example 1 is that finned condensation pipe is set with by an external finned tube 6 and four interior light pipes 8 and forms.All the other are identical with embodiment 1.
During use, steam flows into opposite side annular space bobbin carriage after entering the fin sleeve pipe tube bank annular space bobbin carriage of side and annular space passage cooling condensation by pipeline is discharged by pipeline, and original system recirculated water is entered the header tank that flows into opposite side after the header tank of fin sleeve pipe tube bank side and interior smooth intraductal heat exchange heat up and flows to former circulation Posterior circle of lowering the temperature again by back of pipeline and use by pipeline simultaneously.Under the strong drawing of blower fan, extraneous cold wind skims over fin surface and takes away the heat that the steam in fin sleeve pipe sheds, and the steam in annular space passage is under the cooling of inside and outside two kinds of types of cooling, and the tube bank of fin sleeve pipe is discharged in the rapid condensation of steam.Fixed gas is extracted out by vavuum pump.

Claims (3)

1. a cooling tower air cooling auxiliary equipment, primarily of tower body, air-introduced machine, fin sleeve heat exchange is restrained, screen pack forms, it is characterized in that, air-introduced machine is arranged on the top of tower body, the tube bank of fin sleeve heat exchange is arranged on the inside of tower body, fin sleeve heat exchange tube bank below arranges screen pack, described fin sleeve heat exchange tube bank is made up of some finned condensation pipes, the two ends of fin sleeve heat exchange tube bank arrange header tank respectively, the arranged outside water inlet of one of them header tank, another header tank arranged outside delivery port, the inner side of two header tanks is connected with the interior light pipe of finned condensation pipe, the inner side of two header tanks arranges annular space bobbin carriage, two annular space bobbin carriages arrange charging aperture respectively, the inner side of two annular space bobbin carriages is connected with the annular space passage of finned condensation pipe respectively.
2. cooling tower air cooling auxiliary equipment according to claim 1, is characterized in that, described finned condensation pipe is set with by an external finned tube and one or more interior light pipe and forms, and arranges some gripper shoes between external finned tube and interior light pipe.
3. cooling tower air cooling auxiliary equipment according to claim 1, is characterized in that, described air-introduced machine is 1-4 platform.
CN201520081794.9U 2015-02-05 2015-02-05 Cooling tower air cooling auxiliary equipment Active CN204438840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520081794.9U CN204438840U (en) 2015-02-05 2015-02-05 Cooling tower air cooling auxiliary equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520081794.9U CN204438840U (en) 2015-02-05 2015-02-05 Cooling tower air cooling auxiliary equipment

Publications (1)

Publication Number Publication Date
CN204438840U true CN204438840U (en) 2015-07-01

Family

ID=53606694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520081794.9U Active CN204438840U (en) 2015-02-05 2015-02-05 Cooling tower air cooling auxiliary equipment

Country Status (1)

Country Link
CN (1) CN204438840U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111256492A (en) * 2020-01-17 2020-06-09 南通理工学院 Dedicated air cooler in industry

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111256492A (en) * 2020-01-17 2020-06-09 南通理工学院 Dedicated air cooler in industry

Similar Documents

Publication Publication Date Title
CN106498106B (en) Modified blast furnace soft water closed circulation system and method
CN204438840U (en) Cooling tower air cooling auxiliary equipment
CN107653999B (en) Heat exchanger tube implanted heat exchange wall
CN218787757U (en) Lean-rich liquid heat exchanger
CN203731885U (en) Condenser with internal drainage expansion device
CN204420978U (en) A kind of energy saving drainage system of boiler hydrophobic development unit
CN205037807U (en) Utilize steam heat transfer system of steam ejector exhaust steam recovery
CN204255146U (en) Sleeve pipe for heat exchange is restrained
CN204928483U (en) Electric machine cooling device
CN104560584A (en) Energy-saving tube nest heat exchanger for steaming grains and energy-saving white spirit brewing system
CN203911671U (en) Hydropower station unit energy conservation and environment protection phase change cooling device
CN104949555B (en) Three-in-one gas chiller
CN204064014U (en) A kind of novel cylindricality condenser
CN204142027U (en) Dry wet association type air cooling compressor
CN106594703A (en) Waste heat utilization system and waste heat utilization method adopting heat exchange between drained water of heating network and main condensed water in thermal power plant
CN204007234U (en) A kind of chemical industry hot gas cooler
CN203755013U (en) Built-in heat exchanger of rotating cage type garment dyeing machine
CN203479046U (en) Device for recycling condensate steam in process of production
CN207203778U (en) Process tower tail gas condensation device in a kind of production of polyester
CN107726878B (en) Natural ventilation direct air cooling system
CN203999451U (en) 10000 tons of adjacent first heat reclaim units
CN204555495U (en) A kind of low energy consumption circulating water cooling system
CN203148267U (en) Formic acid cooling water circulation system
CN104329959A (en) Dry-wet combined type air cooling tower
CN204438864U (en) Subtend admission heat-exchanging tube bundle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210222

Address after: 253000 No. 3228, Chongde 1st Avenue, songguantun sub district office, Dezhou Economic and Technological Development Zone, Shandong Province

Patentee after: Shandong beno cooling equipment Co.,Ltd.

Address before: 253000 No. 3, No. 135, Zi Qiang street, Decheng District, Dezhou, Shandong.

Patentee before: Li Jinpeng