CN204435563U - A kind of building beam column node connecting structure - Google Patents
A kind of building beam column node connecting structure Download PDFInfo
- Publication number
- CN204435563U CN204435563U CN201520021614.8U CN201520021614U CN204435563U CN 204435563 U CN204435563 U CN 204435563U CN 201520021614 U CN201520021614 U CN 201520021614U CN 204435563 U CN204435563 U CN 204435563U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe column
- overlap joint
- installing port
- precast concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to a kind of building beam column node connecting structure.Building beam column node connecting structure comprises: steel pipe column, and this steel pipe column is provided with installing port, and the border of installing port is fixedly connected with backplate; Sheath, sheath is vertically fixedly connected on inside backplate; Precast concrete beam, the two ends of described precast concrete beam are projected with overlap joint reinforcing bar; Wherein, to stretch into steel pipe column by installing port inner and affixed with cast-in-situ concrete in steel pipe column for described overlap joint reinforcing bar.Connected node provided by the utility model, has fabrication and installation simple, and speed of application is fast, short construction period, the rational advantage of structure stress.
Description
Technical field
The utility model relates to building field, specifically, relates to a kind of building beam column node connecting structure.
Background technology
Along with the development of China's economy, the concept of housing construction industrialization relies by country and society are glad gradually, and fast-developing.Compared with cast-in-place building operations in the past, prefabricated costruction building site wet trade amount reduces, speed of application is fast, artificial demand is few, reliable product quality, can effectively enhance productivity, and shortens the construction period, decreasing pollution reduces noise, meets the policy that country promotes housing construction industrialization.
The key issue that fabricated construction engineering design exists comprises node and connects design, and the globality of fabricated construction connected node, rigidity and supporting capacity are the key factors of restriction fabricated construction always.At present, building beam column node mainly contains cast in situs and prefabricated connection, and cast in situs connection has on-the-spot formwork and reinforcing bar binding technique is complicated, the shortcoming of at substantial manpower and long construction period; Prefabricated type of attachment is varied, has that production efficiency is high, a short construction period etc., but adjoint be the globality of fabricated construction node and the problem of supporting capacity.
Application number be 201410151216.8 Chinese patent literature describe a kind of prestressing force and connect precast concrete beam square steel tube concrete column reinforcing joint.The program comprises square steel tube concrete column, reinforced concrete beam, presstressed reinforcing steel, steel plate, channel-section steel.Square steel tube concrete column and reinforced concrete beam are prefabricated; Apertured road is stayed in the position of the corresponding beam section of precast reinforced concrete beam, square steel tube concrete column, and in duct built-in metal bellows; Square steel tube concrete column is connected section welding steel with reinforced concrete beam; Channel-section steel is welded on square steel tube; Presstressed reinforcing steel is worn, tensioned prestressing bar after in metal bellows; Duct grouting is completed within 48h after stretch-draw completes, thus by overall for beam column composition.The program can increase the shear-carrying capacity of node, strengthen its switching performance, but also there is more deficiency, this utility model element precast relative complex, and need stretch-draw prestressing force and duct grouting, construction technology is more complicated, and technical requirements is higher, is unfavorable for improving efficiency of construction, shortening construction period.
Therefore, how designing a kind of brand-new building beam column node connected mode, is the problem that those skilled in the art need solution badly.
Utility model content
The purpose of this utility model is for overcoming above-mentioned the deficiencies in the prior art, provides a kind of building beam column node connecting structure.This connected node significantly can improve speed of application, shortens construction period, has the advantages such as structure stress is reasonable, fabrication and installation simple, good stability.
The utility model adopts following technical scheme.
A kind of building beam column node connecting structure, comprising:
Steel pipe column, this steel pipe column is provided with installing port, and the border of installing port is fixedly connected with backplate;
Sheath, sheath is vertically fixed on inside backplate;
Precast concrete beam, the two ends of described precast concrete beam are projected with overlap joint reinforcing bar; It is inner and affixed with cast-in-situ concrete in steel pipe column that described overlap joint reinforcing bar stretches into steel pipe column by installing port.
Preferably, the steel plate that described sheath closes connection by four limits forms, and the aperture area of sheath is greater than the sectional area of precast concrete beam.
Preferably, described backplate is the circle steel plate being fixedly connected on erection of steel pipe column mouth surrounded surface.
Preferably, described steel pipe column is rectangular steel pipe or round steel pipe.
Preferably, described overlap joint reinforcing bar is two-layer up and down, upper strata overlap joint reinforcing bar bends anchoring downwards in end, and reinforcing bar bending can increase concrete anchorage length in overlap joint reinforcing bar and steel core concrete column, further strengthens the consolidation of precast concrete beam and steel core concrete column.
Preferably, between described precast concrete beam and sheath, space is filled by expanded material.
Preferably, described installing port is two, and precast concrete beam is two, and the overlap joint reinforcing bar of two precast concrete beams stretches into described steel pipe column overlap joint from the installing port of correspondence respectively, and affixed with cast-in-situ concrete in steel pipe column, forms corner post connected node.
Preferably, described installing port is three, and precast concrete beam is three, and the overlap joint reinforcing bar of three precast concrete beams stretches into described steel pipe column overlap joint from the installing port of correspondence respectively, and affixed with cast-in-situ concrete in steel pipe column, forms side column connecting node.
Preferably, described installing port is four, and precast concrete beam is four, and the overlap joint reinforcing bar of four precast concrete beams stretches into described steel pipe column overlap joint from the installing port of correspondence respectively, and affixed with cast-in-situ concrete in steel pipe column, column jointing gusset in formation.
The utility model additionally provides the construction technology of above-mentioned building beam column node connecting structure, comprises the steps:
A. installing port offered by steel pipe column;
B. installing port periphery is fixedly connected with backplate and sheath;
C. steel pipe column location and installation;
D. hoisting prefabricated concrete beam is to design elevation;
E. beam-ends starter bar stretches into steel pipe column by installing port, completes the overlap joint of different directions reserved steel bar;
F. the gap between shutoff precast concrete beam and sheath;
G. to concrete perfusion in steel pipe column, complete affixed.
The beneficial effects of the utility model are: steel pipe column and concrete beam all can in factory Prefabrication, then be transported to construction plant and carry out Assembling, only need in assembling process to carry out the bar splicing in steel pipe column and concreting, significantly can improve speed of application, reduction of erection time, node connects solid and reliable equally compared with Cast-in-situ Beam Column border node.
Accompanying drawing illustrates:
Fig. 1 is the utility model precast concrete beam front view;
Fig. 2 is the assembly drawing of the utility model steel pipe column and sheath;
Fig. 3 is the connection diagram of the utility model precast concrete beam and steel core concrete column;
Fig. 4 is the utility model corner post node cross sectional plan view;
Fig. 5 is the utility model side column node cross sectional plan view;
Fig. 6 is the utility model king post joint cross sectional plan view;
Fig. 7 is process chart of the present utility model;
Wherein: A-1, precast concrete beam, A-2, upper strata overlap joint reinforcing bar, A-3, lower floor's overlap joint reinforcing bar, B-1, steel pipe column, B-2, backplate, B-3; Sheath, B-4, installing port.
Detailed description of the invention:
For the technical characterstic of this programme can be clearly demonstrated, below in conjunction with accompanying drawing, the utility model is described in detail.
Embodiment 1: a kind of building beam column node connecting structure, its structure as Figure 1-4, comprising:
Steel pipe column B-1, this steel pipe column B-1 is reserved with installing port B-4, and the border of installing port B-4 is welded with backplate B-2;
Be vertically welded with sheath B-3 with described backplate B-2, this sheath is welded by four block plates are closed;
Precast concrete beam A-1, the two ends of described precast concrete beam A-1 are projected with overlap joint reinforcing bar;
It is inner and affixed with cast-in-situ concrete in steel pipe column that described overlap joint reinforcing bar stretches into steel pipe column by installing port.
The steel plate that described sheath B-3 closes welding by four limits forms, and the aperture area of sheath B-3 is greater than the sectional area of precast concrete beam A-1, so that precast concrete beam A-1 can stretch in sheath B-3 smoothly.
Backplate B-2 is the circle steel plate being welded in steel pipe column B-1 installing port surrounded surface.
Steel pipe column B-1 can be rectangular steel pipe or round steel pipe according to actual selection.
Overlap joint reinforcing bar is two-layer up and down, and comprise upper strata overlap joint reinforcing bar A-2 and lower floor overlap joint reinforcing bar A-3, upper strata overlap joint reinforcing bar A-2 bends anchoring downwards in end.
Between precast concrete beam A-1 and sheath B-3, fill gaps has expanded material, (because sheath B-3 size is larger than precast concrete beam A-1 sectional dimension, install between the back rest and sheath and leave space, fill with expanded material, produce spillage when preventing from building steel pipe column interior concrete, expanded material can select foam or other existingly can play foam filled material).
Wherein, installing port B-4 is two, and precast concrete beam A-1 is two, and the overlap joint reinforcing bar of two precast concrete beam A-1 stretches into steel pipe column B-1 and affixed with cast-in-situ concrete in steel pipe column from the installing port B-4 of correspondence respectively, forms corner post node and connects.
As shown in Figure 7, this programme additionally provides the construction technology of above-mentioned building beam column node connecting structure, comprises the steps:
The both sides of steel pipe column B-1 offer installing port B-4 respectively; Arbitrary installing port B-4 periphery welding backplate B-2 and sheath B-3; Steel pipe column B-1 location and installation; Hoisting prefabricated concrete beam A-1 is to design elevation; Overlap joint reinforcing bar stretches into steel pipe column B-1 by installing port B-4, completes the overlap joint of different directions reserved steel bar; Precast concrete beam is supported in steel work sheath; Gap between shutoff precast concrete beam A-1 and sheath B-3; Concrete perfusion in steel pipe column B-1, completes affixed.
After have employed said structure, the steel pipe column in this programme and concrete beam all can in factory Prefabrication, be then transported to construction plant and carry out Assembling, only need in assembling process to carry out the bar splicing in steel pipe column and concreting.Compared with prior art, significantly can improve speed of application, the reduction of erection time, and stabilized structure is reliable.
Embodiment 2: a kind of building beam column node connecting structure, its structure as shown in Figure 1, Figure 2, shown in Fig. 3 and Fig. 5, comprising:
Steel pipe column B-1, this steel pipe column B-1 is reserved with installing port B-4, and the border of installing port B-4 is welded with backplate B-2;
Be vertically welded with sheath B-3 with described backplate B-2, this sheath is welded by four block plates are closed;
Precast concrete beam A-1, the two ends of described precast concrete beam A-1 are projected with overlap joint reinforcing bar;
It is inner and affixed with cast-in-situ concrete in steel pipe column that described overlap joint reinforcing bar stretches into steel pipe column B-1 by installing port.
The steel plate that described sheath B-3 closes welding by four limits forms, and the aperture area of sheath B-3 is greater than the sectional area of precast concrete beam A-1, so that precast concrete beam A-1 can stretch in sheath B-3 smoothly.
Backplate B-2 is the circle steel plate being welded in steel pipe column B-1 installing port surrounded surface.
Steel pipe column B-1 can be rectangular steel pipe or round steel pipe according to actual selection.
Overlap joint reinforcing bar is two-layer up and down, and comprise upper strata overlap joint reinforcing bar A-2 and lower floor overlap joint reinforcing bar A-3, upper strata overlap joint reinforcing bar A-2 bends anchoring downwards in end.
Between precast concrete beam A-1 and sheath B-3, fill gaps has expanded material.
Wherein, installing port B-4 is three, and precast concrete beam A-1 is three, and the overlap joint reinforcing bar of three precast concrete beam A-1 stretches into steel pipe column B-1 and affixed with cast-in-situ concrete in steel pipe column from the installing port B-4 of correspondence respectively, forms side column node and connects.
As shown in Figure 7, this programme additionally provides the construction technology of above-mentioned building beam column node connecting structure, comprises the steps:
Offer installing port B-4 respectively for three of steel pipe column B-1; Arbitrary installing port B-4 periphery welding backplate B-2 and sheath B-3; Steel pipe column B-1 location and installation; Hoisting prefabricated concrete beam A-1 is to design elevation; Overlap joint reinforcing bar stretches into steel pipe column B-1 by installing port B-4, completes the overlap joint of different directions reserved steel bar; Precast concrete beam is supported in steel work sheath; Gap between shutoff precast concrete beam A-1 and sheath B-3; Concrete perfusion in steel pipe column B-1, completes affixed.
Embodiment 3: a kind of building beam column node connecting structure, its structure as shown in Figure 1, Figure 2, shown in Fig. 3 and Fig. 6, comprising:
Steel pipe column B-1, this steel pipe column B-1 is reserved with installing port B-4, and the border of installing port B-4 is welded with backplate B-2;
Be vertically welded with sheath B-3 with described backplate B-2, this sheath is welded by four block plates are closed;
Precast concrete beam A-1, the two ends of described precast concrete beam A-1 are projected with overlap joint reinforcing bar;
It is inner and affixed with cast-in-situ concrete in steel pipe column that described overlap joint reinforcing bar stretches into steel pipe column B-1 by installing port.
The steel plate that described sheath B-3 closes welding by four limits forms, and the aperture area of sheath B-3 is greater than the sectional area of precast concrete beam A-1, so that precast concrete beam A-1 can stretch in sheath B-3 smoothly.
Backplate B-2 is the circle steel plate being welded in steel pipe column B-1 installing port surrounded surface.
Steel pipe column B-1 can be rectangular steel pipe or round steel pipe according to actual selection.
Overlap joint reinforcing bar is two-layer up and down, and comprise upper strata overlap joint reinforcing bar A-2 and lower floor overlap joint reinforcing bar A-3, upper strata overlap joint reinforcing bar A-2 bends anchoring downwards in end.
Between precast concrete beam A-1 and sheath B-3, fill gaps has expanded material.
Wherein, installing port B-4 is four, and precast concrete beam A-1 is four, and the overlap joint reinforcing bar of four precast concrete beam A-1 stretches into steel pipe column B-1 and affixed with cast-in-situ concrete in steel pipe column from the installing port B-4 of correspondence respectively, forms king post joint and connects.
As shown in Figure 7, this programme additionally provides the technique of above-mentioned building beam column node connecting structure, comprises the steps:
Installing port B-4 is offered at the four sides of steel pipe column B-1 respectively; Arbitrary installing port B-4 periphery welding backplate B-2 and sheath B-3; Steel pipe column B-1 location and installation; Hoisting prefabricated concrete beam A-1 is to design elevation; Overlap joint reinforcing bar stretches into steel pipe column B-1 by installing port B-4, completes the overlap joint of different directions reserved steel bar; Precast concrete beam is supported in steel work sheath; Gap between shutoff precast concrete beam A-1 and sheath B-3; Concrete perfusion in steel pipe column B-1, completes affixed.
In this manual, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the utility model.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from spirit or scope of the present utility model, can realize in other embodiments.Therefore, the utility model can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.
Claims (9)
1. a building beam column node connecting structure, is characterized in that, comprising:
Steel pipe column, this steel pipe column is provided with installing port, and the border of installing port is fixedly connected with backplate;
Sheath, sheath is vertically fixedly connected on inside backplate;
Precast concrete beam, the two ends of described precast concrete beam are projected with overlap joint reinforcing bar;
Wherein, to stretch into steel pipe column by installing port inner and affixed with cast-in-situ concrete in steel pipe column for described overlap joint reinforcing bar.
2. building beam column node connecting structure according to claim 1, is characterized in that, the steel plate that described sheath closes connection by four limits forms, and the aperture area of sheath is greater than the sectional area of precast concrete beam.
3. building beam column node connecting structure according to claim 1, is characterized in that, described backplate is the circle steel plate being fixedly connected on erection of steel pipe column mouth surrounded surface.
4. building beam column node connecting structure according to claim 1, is characterized in that, described steel pipe column is rectangular steel pipe or round steel pipe.
5. building beam column node connecting structure according to claim 1, is characterized in that, described overlap joint reinforcing bar is two-layer up and down, and upper strata overlap joint reinforcing bar bends anchoring downwards in end.
6. building beam column node connecting structure according to claim 1, is characterized in that, is filled with expanded material between described precast concrete beam and sheath.
7. the building beam column node connecting structure according to any one of claim 1-6, it is characterized in that, described installing port is two, precast concrete beam is two, the overlap joint reinforcing bar of two precast concrete beams stretches into described steel pipe column overlap joint from the installing port of correspondence respectively, and affixed with cast-in-situ concrete in steel pipe column, form corner post node and connect.
8. the building beam column node connecting structure according to any one of claim 1-6, it is characterized in that, described installing port is three, precast concrete beam is three, the overlap joint reinforcing bar of three precast concrete beams stretches into described steel pipe column overlap joint from the installing port of correspondence respectively, and affixed with cast-in-situ concrete in steel pipe column, form side column node and connect.
9. the building beam column node connecting structure according to any one of claim 1-6, it is characterized in that, described installing port is four, precast concrete beam is four, the overlap joint reinforcing bar of four precast concrete beams stretches into described steel pipe column overlap joint from the installing port of correspondence respectively, and affixed with cast-in-situ concrete in steel pipe column, form king post joint and connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520021614.8U CN204435563U (en) | 2015-01-13 | 2015-01-13 | A kind of building beam column node connecting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520021614.8U CN204435563U (en) | 2015-01-13 | 2015-01-13 | A kind of building beam column node connecting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204435563U true CN204435563U (en) | 2015-07-01 |
Family
ID=53603448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520021614.8U Active CN204435563U (en) | 2015-01-13 | 2015-01-13 | A kind of building beam column node connecting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204435563U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104532964A (en) * | 2015-01-13 | 2015-04-22 | 济南轨道交通集团有限公司 | Building beam-column joint connecting structure and process |
-
2015
- 2015-01-13 CN CN201520021614.8U patent/CN204435563U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104532964A (en) * | 2015-01-13 | 2015-04-22 | 济南轨道交通集团有限公司 | Building beam-column joint connecting structure and process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104532964B (en) | A kind of building beam column node connecting structure and technique | |
CN103741812A (en) | Connection joint of steel reinforced concrete superposed beams and middle column | |
CN102635177A (en) | Un-bonded concealed bracing type shear wall for reinforced concrete frame and construction method thereof | |
CN203603267U (en) | Connecting joint of steel reinforced concrete superposed beams and middle column | |
CN110939212A (en) | Connecting structure and construction method of assembled shear wall structure | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
CN103397700A (en) | Connection structure of building composite floor slab and steel tube shear wall | |
CN203475665U (en) | Connecting structure of steel beam and composite floor slab of building | |
CN204435563U (en) | A kind of building beam column node connecting structure | |
CN109577492A (en) | A kind of steel sections package concrete column and reinforced beam node connecting structure | |
CN112681822A (en) | Double-column-support four-column assembled elevated station | |
CN204645318U (en) | A kind of overlaid plate type shear wall | |
CN204781443U (en) | Device for connecting precast shear wall concatenation about being used for | |
CN108755938B (en) | Steel core area node of assembled concrete frame | |
CN103437349B (en) | The construction method of steel concrete perfusion shaped pile | |
CN203475609U (en) | Connecting structure of composite floor slab and steel tube shear wall of building | |
CN100545387C (en) | A kind of concrete hollow board | |
CN204608975U (en) | A kind of prefabricated assembled profile steel concrete column-steel girder frame structural system | |
CN210483171U (en) | Prestressing force assembled UHPC bicycle shed structure | |
CN100422457C (en) | Hollow component for concrete | |
CN218881701U (en) | Reinforced concrete column's combination increase cross-section reinforced structure | |
CN205576970U (en) | Frame -type integrated configuration utility tunnel | |
CN217998506U (en) | Steel tube vertical connecting piece of steel tube bundle frame shear wall | |
CN204001421U (en) | Self supporting type prestressing force Covered with Angles light aggregate concrete composite beams | |
CN211775107U (en) | Prefabricated post structure of assembled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |