CN204416913U CN201520075755.8U CN201520075755U CN204416913U CN 204416913 U CN204416913 U CN 204416913U CN 201520075755 U CN201520075755 U CN 201520075755U CN 204416913 U CN204416913 U CN 204416913U
Authority
CN
China
Prior art keywords
piece
clamping plate
plate single
pipe link
cleat assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520075755.8U
Other languages
Chinese (zh)
Inventor
易志忠
谭绍明
杨志
徐正浩
张松元
刘勃蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201520075755.8U priority Critical patent/CN204416913U/en
Application granted granted Critical
Publication of CN204416913U publication Critical patent/CN204416913U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a kind of shaped steel stone tongs, comprises the first cleat assembly, the second cleat assembly and adjustment member; The upper end of the first cleat assembly is connected with the movable upper end of the second cleat assembly; First cleat assembly and the second cleat assembly comprise two clamping plate single-pieces being connected by head rod and the second pipe link respectively and upper end has two is flexibly connected points, and two are flexibly connected between point and are connected by attaching parts; Clamping plate single-piece is respectively equipped with the draw-in groove be oppositely arranged; Adjustment member comprises the adjusting screw(rod) connecting head rod and the second pipe link and the regulating handle being arranged on adjusting screw(rod) one end, adjusting screw(rod) comprises and is respectively used to regulate head rod position and for regulating two sections of thread segments of the second pipe link position, and two sections of thread segments are provided with the nut matched with it.Shaped steel stone tongs integral structure of the present utility model is simplified, and convenient adjustment, can not cause any damage to shaped steel, and Assembly &Disassembly is convenient.

Description

A kind of shaped steel stone tongs
Technical field
The utility model relates to hanging device field, especially, relates to a kind of shaped steel stone tongs.
Background technology
Large-scale combined bracket for the heavier-weight of steel I-beam, H profile steel beam, pipeline or shaped steel composition lifts or transport is general adopts welding hanger extension cucurbit mode, lift rear oxyacetylene metal-cutting and hanger has been cut off process, such method work capacity is large, steel I-beam, H profile steel beam paint damages, and the stress that welding produces causes the defects such as beam body deformability, and lifting efficiency is low, hoisting cost is large, and the feature of environmental protection is poor.
Due to traditional having some limitations property of hanging method and weak point, for avoiding realizing zero damage to steel I-beam, H profile steel beam in hoisting process, reduce environmental pollution, therefore, design a kind of structure to simplify, to dismantle and the shaped steel stone tongs of easy for installation and applicable various shaped steel lifting has great importance.
Utility model content
The utility model object is to provide a kind of structure to simplify, dismantle and easy for installation, can not cause shaped steel and damage and be applicable to the shaped steel stone tongs of various shaped steel lifting, concrete technical scheme is as follows:
A kind of shaped steel stone tongs, comprises the first cleat assembly, the second cleat assembly that upper end is connected with the movable upper end of described first cleat assembly and for regulating the adjustment member of the spacing of described first cleat assembly free end and described second cleat assembly free end;
Described first cleat assembly comprise be arranged in parallel, spacing is 5.0-10 centimetre and the clamping plate single-piece A connected by head rod and clamping plate single-piece B, described second cleat assembly comprise be arranged in parallel, spacing is 5.0-10 centimetre and the clamping plate single-piece C connected by the second pipe link and clamping plate single-piece D; Described clamping plate single-piece A is close to described clamping plate single-piece C setting and both upper ends have flexible connection point, described clamping plate single-piece B is close to described clamping plate single-piece D setting and both upper ends have flexible connection point, connected by attaching parts between two described flexible connection points, and described stone tongs is suspended on the suspension position on hook when the middle part of described attaching parts is provided with for lifting; The lower end inside of described clamping plate single-piece A and the lower end inside of described clamping plate single-piece C be respectively equipped be oppositely arranged and all with the draw-in groove waited to lift workpiece size and match, the lower end inside of described clamping plate single-piece B and the lower end inside of described clamping plate single-piece D be respectively equipped be oppositely arranged and all with the draw-in groove waited to lift workpiece size and match, described head rod and described second pipe link are all positioned at the top of described draw-in groove;
Described adjustment member comprises the adjusting screw(rod) connecting described head rod and described second pipe link and the regulating handle being arranged on described adjusting screw(rod) one end, described adjusting screw(rod) comprises for regulating the first thread segment of described head rod position and for regulating the second thread segment of described second pipe link position, described first thread segment and described second thread segment being provided with the nut matched with it.
Preferred in above technical scheme, the structure of described clamping plate single-piece A, clamping plate single-piece B, clamping plate single-piece C and clamping plate single-piece D is all identical; Described head rod is identical with the structure of described second pipe link.
In order to reach better technique effect, also comprise the two first auxiliary pipe links for connecting cleat single-piece A and clamping plate single-piece B and the two second auxiliary pipe links for connecting cleat single-piece C and clamping plate single-piece D, described first auxiliary pipe link and the described second auxiliary pipe link are all positioned at below described draw-in groove, and described head rod, two described first auxiliary point of connection between pipe link and described clamping plate single-piece A or clamping plate single-piece B and described second pipe link, two described second auxiliary point of connection distributions triangular in shape between pipe link and described clamping plate single-piece C or clamping plate single-piece D.
In order to reach better technique effect, the end of described adjusting screw(rod) is provided with the short tube vertically arranged, and described regulating handle comprises and runs through described short tube and the bolt vertically arranged, be arranged on the handheld component of end, described bolt one end and arrange the limiting component of the described bolt other end.
Preferred in above technical scheme, described attaching parts is stainless rod-like structure, and described suspension position is provided with the through hole matched with hook dimensions.
Preferred in above technical scheme, the material of described clamping plate single-piece A, clamping plate single-piece B, clamping plate single-piece C and clamping plate single-piece D is corrosion-resistant steel, and its thickness is 2.0-10.0 centimetre.
Application the technical solution of the utility model, has following beneficial effect:
(1) the second cleat assembly that the utility model shaped steel stone tongs comprises the first cleat assembly, upper end is connected with the movable upper end of described first cleat assembly and for regulating the adjustment member of the spacing of described first cleat assembly free end and described second cleat assembly free end, integral structure is simplified; First cleat assembly and the second cleat assembly include two groups of single-pieces, firmly and resistance to overturning is good; The setting of attaching parts and the combination of employing adjusting screw(rod) and regulating handle, adjustment member is facilitated to regulate distance between the first cleat assembly free end and the second cleat assembly free end, namely the length direction of the first cleat assembly and the length direction of the second cleat assembly is made can to form the angle of 0 ~ 180 ° thus meet the lifting of different shaped steel, practical; The convenient fixing shaped steel of design of draw-in groove, without the need to welding before lifting, without the need to cutting off annex after lifting, can not cause any damage to shaped steel.
(2) structure of the single-piece A of clamping plate described in the utility model, clamping plate single-piece B, clamping plate single-piece C and clamping plate single-piece D is all identical; Described head rod is identical with the structure of described second pipe link conveniently to be produced, and reduces costs.
(3) the first auxiliary pipe link and the second auxiliary design of pipe link and selection of position thereof in the utility model, makes the stability of the first cleat assembly and the second cleat assembly itself and whole shaped steel stone tongs better.
(4) in the utility model, the end of adjusting screw(rod) is provided with the short tube vertically arranged, described regulating handle comprises and runs through described short tube and the bolt vertically arranged, be arranged on the handheld component of end, described bolt one end and arrange the limiting component of the described bolt other end, and integral structure is simplified and handled easily.
(5) in the utility model, attaching parts is stainless rod-like structure, and described suspension position is provided with the through hole matched with hook dimensions, reaches the effect of hook and its assembling when extending its service life and convenient lifting; The material of described clamping plate single-piece A, clamping plate single-piece B, clamping plate single-piece C and clamping plate single-piece D is corrosion-resistant steel, and its thickness is 2.0-10.0 centimetre, and parts easily obtain and extend the service life of whole shaped steel stone tongs, reduce costs.
Except object described above, feature and advantage, the utility model also has other object, feature and advantage.Below with reference to figure, the utility model is described in further detail.
Accompanying drawing explanation
The accompanying drawing forming a application's part is used to provide further understanding of the present utility model, and schematic description and description of the present utility model, for explaining the utility model, is not formed improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the Facad structure schematic diagram of shaped steel stone tongs when lifting in the utility model preferred embodiment 1;
Fig. 2 is the H direction view of the shaped steel stone tongs of Fig. 1;
Fig. 3 is the structural representation of adjustment member in Fig. 1;
11-first cleat assembly, 12-second cleat assembly, E-draw-in groove, 13-adjustment member, 131-adjusting screw(rod), O1-first thread segment, O2-second thread segment, O3-nut, A1-short tube, 132-regulating handle, F1-bolt, F2-handheld component, F3-limiting component, 14-attaching parts, 141-hangs position, 1411-through hole, 15-head rod, 16-second pipe link, 17-first assists pipe link, 18-second assists pipe link, and 01-links up with, and 02-waits to lift workpiece.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in detail, but the multitude of different ways that the utility model can limit according to claim and cover is implemented.
Embodiment 1:
A kind of shaped steel stone tongs being applicable to various shaped steel (waiting to lift workpiece 02), refer to Fig. 1 and Fig. 2, specifically comprise the first cleat assembly 11, the second cleat assembly 12 that upper end is connected with the movable upper end of described first cleat assembly 11 and for regulating the adjustment member 13 of described first cleat assembly 11 and the spacing of described second cleat assembly 12, integral structure is simplified.
Described first cleat assembly 11 comprise be arranged in parallel, spacing is 5.0-10 centimetre and the clamping plate single-piece A connected by head rod 15 and clamping plate single-piece B; Described second cleat assembly 12 comprise be arranged in parallel, spacing be 5.0-10 centimetre and by second pipe link 16 connect clamping plate single-piece C and clamping plate single-piece D; Described clamping plate single-piece A is close to described clamping plate single-piece C setting and both upper ends have flexible connection point, described clamping plate single-piece B is close to described clamping plate single-piece D setting and both upper ends have flexible connection point, the material of described clamping plate single-piece A, clamping plate single-piece B, clamping plate single-piece C and clamping plate single-piece D is corrosion-resistant steel, and its thickness is 2.0-10.0 centimetre, preferably 8.0 centimetres, parts easily obtain and extend the service life of whole shaped steel stone tongs, convenient production, reduce costs, and safety can be guaranteed and meet the demand of reality.
Two described flexible connections between point connect by stainless steel and for the attaching parts 14 of rod-like structure, and described stone tongs is suspended on the suspension position 141 on hook 01 when being provided with for lifting by the middle part of described attaching parts 14, described suspension position 141 is provided with and the through hole 1411 linked up with 01 size and match, between during lifting by hook through through hole 1411, easy to operate.
The lower end inside of described clamping plate single-piece A and the lower end inside of described clamping plate single-piece C be respectively equipped be oppositely arranged and all with the draw-in groove E waiting to lift workpiece 02 size and match, the lower end inside of described clamping plate single-piece B and the lower end inside of described clamping plate single-piece D be respectively equipped be oppositely arranged and all with the draw-in groove E waiting to lift workpiece 02 size and match, described head rod 15 and described second pipe link 16 are all positioned at the top of described draw-in groove E, the design of draw-in groove E, treat lifting workpiece 02 when being convenient to lifting to be fixed, without the need to welding hanger and without the need to amputating hanger, lifting workpiece 02 can not be treated and cause any damage.
Described adjustment member 13 comprise connect described head rod 15 and described second pipe link 16 adjusting screw(rod) 131 (preferably: head rod 15 and the second pipe link 16 are provided with manhole that is corresponding and that match with described adjusting screw(rod) 131, described adjusting screw(rod) 131 runs through described manhole and arranges) and the regulating handle 132 that is arranged on described adjusting screw(rod) 131 one end (be specially: the end of described adjusting screw(rod) 131 is provided with the short tube A1 vertically arranged, described regulating handle 132 comprises and runs through described short tube A1 and the bolt F1 vertically arranged, be arranged on the handheld component F2 of end, described bolt F1 one end and the limiting component F3 of the described bolt F1 other end is set), described adjusting screw(rod) 131 comprises for regulating the first thread segment O1 of described head rod 15 position and for regulating the second thread segment O2 of described second pipe link 16 position, described first thread segment O1 and described second thread segment O2 is provided with the nut O3 matched with it.By nut O3 respectively with the combination of the first thread segment O1 and the second thread segment O2 and in conjunction with the design of adjustment member and the selection of position thereof, make the length direction of the length direction of the first cleat assembly and the second cleat assembly can form the angle of 0 ~ 180 °, meet real demand and good stability.
Shaped steel stone tongs of the present utility model also comprises the two first auxiliary pipe links 17 for connecting cleat single-piece A and clamping plate single-piece B and the two second auxiliary pipe links 18 for connecting cleat single-piece C and clamping plate single-piece D, described first auxiliary pipe link 17 and the described second auxiliary pipe link 18 are all positioned at below described draw-in groove E, and described head rod 15, two described first auxiliary point of connection between pipe link 17 and described clamping plate single-piece A or clamping plate single-piece B and described second pipe link 16, two described second auxiliary point of connection distributions triangular in shape between pipe link 18 and described clamping plate single-piece C or clamping plate single-piece D, first auxiliary pipe link and the second auxiliary design of pipe link and selection of position thereof, make the stability of the first cleat assembly and the second cleat assembly itself and whole shaped steel stone tongs better.
The specific operation process applied when shaped steel stone tongs of the present utility model lifts is as follows: each parts in the good shaped steel stone tongs of (1) site assembly; Or the shaped steel stone tongs that direct employing has assembled; (2) by the regulating handle 132 on the described adjusting screw(rod) of adjustment and nut O3, make the distance between the free end of the free end of the first cleat assembly 11 and the second cleat assembly 12 slightly larger than the size waiting to lift workpiece 02, to wait that the position to be fixed lifting workpiece 02 is relative with draw-in groove E, then regulate regulating handle 132 and nut O3 to reach distance between the free end of reduction first cleat assembly 11 and the free end of the second cleat assembly 12 (distance meet the demands after fastening nut O3 be fixed), thus realize will waiting that lifting workpiece 02 is fixed; By hook 01 through the through hole 1411 on attaching parts 14, move to assigned address by the upper end of driven by motor hook 01, complete the lifting waiting to lift workpiece 02.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (6)

1. a shaped steel stone tongs, is characterized in that: comprise the first cleat assembly (11), the second cleat assembly (12) that upper end is connected with the movable upper end of described first cleat assembly (11) and for regulating the adjustment member (13) of the spacing of described first cleat assembly (11) free end and described second cleat assembly (12) free end;
Described first cleat assembly (11) comprise be arranged in parallel, spacing is 5.0-10 centimetre and the clamping plate single-piece A connected by head rod (15) and clamping plate single-piece B, described second cleat assembly (12) comprise be arranged in parallel, spacing is 5.0-10 centimetre and the clamping plate single-piece C connected by the second pipe link (16) and clamping plate single-piece D; Described clamping plate single-piece A is close to described clamping plate single-piece C setting and both upper ends have flexible connection point, described clamping plate single-piece B is close to described clamping plate single-piece D setting and both upper ends have flexible connection point, connected by attaching parts (14) between two described flexible connection points, and when the middle part of described attaching parts (14) is provided with for lifting, described stone tongs is suspended on the suspension position (141) on hook (01); The lower end inside of described clamping plate single-piece A and the lower end inside of described clamping plate single-piece C be respectively equipped be oppositely arranged and all with the draw-in groove (E) waited to lift workpiece (02) size and match, the lower end inside of described clamping plate single-piece B and the lower end inside of described clamping plate single-piece D be respectively equipped be oppositely arranged and all with the draw-in groove (E) waited to lift workpiece (02) size and match, described head rod (15) and described second pipe link (16) are all positioned at the top of described draw-in groove (E);
Described adjustment member (13) comprises the adjusting screw(rod) (131) connecting described head rod (15) and described second pipe link (16) and the regulating handle (132) being arranged on described adjusting screw(rod) (131) one end, described adjusting screw(rod) (131) comprises for regulating first thread segment (O1) of described head rod (15) position and for regulating second thread segment (O2) of described second pipe link (16) position, described first thread segment (O1) and described second thread segment (O2) being provided with the nut (O3) matched with it.
2. shaped steel stone tongs according to claim 1, is characterized in that: the structure of described clamping plate single-piece A, clamping plate single-piece B, clamping plate single-piece C and clamping plate single-piece D is all identical; Described head rod (15) is identical with the structure of described second pipe link (16).
3. the shaped steel stone tongs according to claim 1-2 any one, it is characterized in that: also comprise the two first auxiliary pipe links (17) for connecting cleat single-piece A and clamping plate single-piece B and the two second auxiliary pipe links (18) for connecting cleat single-piece C and clamping plate single-piece D, described first auxiliary pipe link (17) and the described second auxiliary pipe link (18) are all positioned at described draw-in groove (E) below, and described head rod (15), two described first auxiliary point of connection between pipe link (17) and described clamping plate single-piece A or clamping plate single-piece B and described second pipe link (16), two described second auxiliary point of connection distributions triangular in shape between pipe link (18) and described clamping plate single-piece C or clamping plate single-piece D.
4. shaped steel stone tongs according to claim 3, it is characterized in that: the end of described adjusting screw(rod) (131) is provided with the short tube (A1) vertically arranged, described regulating handle (132) comprises and runs through described short tube (A1) and the bolt (F1) vertically arranged, be arranged on the handheld component (F2) of described bolt (F1) end, one end and arrange the limiting component (F3) of described bolt (F1) other end.
5. shaped steel stone tongs according to claim 3, it is characterized in that: described attaching parts (14) is stainless rod-like structure, described suspension position (141) is provided with and the through hole (1411) linked up with (01) size and match.
6. shaped steel stone tongs according to claim 3, is characterized in that: the material of described clamping plate single-piece A, clamping plate single-piece B, clamping plate single-piece C and clamping plate single-piece D is corrosion-resistant steel, and its thickness is 2.0-10.0 centimetre.
CN201520075755.8U 2015-02-03 2015-02-03 A kind of shaped steel stone tongs Expired - Fee Related CN204416913U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520075755.8U CN204416913U (en) 2015-02-03 2015-02-03 A kind of shaped steel stone tongs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520075755.8U CN204416913U (en) 2015-02-03 2015-02-03 A kind of shaped steel stone tongs

Publications (1)

Publication Number Publication Date
CN204416913U true CN204416913U (en) 2015-06-24

Family

ID=53467302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520075755.8U Expired - Fee Related CN204416913U (en) 2015-02-03 2015-02-03 A kind of shaped steel stone tongs

Country Status (1)

Country Link
CN (1) CN204416913U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105480850A (en) * 2015-12-30 2016-04-13 苏州安特实业有限公司 Special fixture for I-shaped steel
CN107217553A (en) * 2017-06-01 2017-09-29 芜湖中铁科吉富轨道有限公司 One kind suspention tongue flat-nose pliers
CN109066452A (en) * 2018-07-03 2018-12-21 云南电网有限责任公司曲靖供电局 A kind of insulator clamp apparatus
CN110550546A (en) * 2019-10-10 2019-12-10 河南宾康智能装备有限公司 Light wear-resisting H-shaped track of hanging of sign indicating number brick machine
CN112093648A (en) * 2020-07-31 2020-12-18 六安长城钢结构有限公司 Hoist for H-shaped heavy steel member
CN112591664A (en) * 2020-11-16 2021-04-02 宜兴市鸿雁电器有限公司 Hoisting accessory is used in mould installation maintenance

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105480850A (en) * 2015-12-30 2016-04-13 苏州安特实业有限公司 Special fixture for I-shaped steel
CN107217553A (en) * 2017-06-01 2017-09-29 芜湖中铁科吉富轨道有限公司 One kind suspention tongue flat-nose pliers
CN109066452A (en) * 2018-07-03 2018-12-21 云南电网有限责任公司曲靖供电局 A kind of insulator clamp apparatus
CN109066452B (en) * 2018-07-03 2024-07-09 云南电网有限责任公司曲靖供电局 Insulator fixture
CN110550546A (en) * 2019-10-10 2019-12-10 河南宾康智能装备有限公司 Light wear-resisting H-shaped track of hanging of sign indicating number brick machine
CN112093648A (en) * 2020-07-31 2020-12-18 六安长城钢结构有限公司 Hoist for H-shaped heavy steel member
CN112591664A (en) * 2020-11-16 2021-04-02 宜兴市鸿雁电器有限公司 Hoisting accessory is used in mould installation maintenance

Similar Documents

Publication Publication Date Title
CN204416913U (en) A kind of shaped steel stone tongs
CN202137546U (en) Opening-to-opening centralizer for welding of pipelines
CN207048062U (en) A kind of Novel free drilling steel construction Quick Connect Kit
CN204387992U (en) A kind of light weight steel structure spool lays and lamp installation hanger
CN204164502U (en) Piping foundation fixture
CN203998604U (en) The be threaded vertical reinforcement erecting equipment of form of employing
CN204186055U (en) For the simple and easy cage that section steel beam is installed
CN204006613U (en) A kind of collector lifting fixed support
CN203624808U (en) Detachable steel structure hanger
CN202578001U (en) Movable reinforced steel bar binding mold applicable to movable mold frame
CN204676756U (en) The fastener of top board furred ceiling
CN202625653U (en) Lifting frame for radiating fin of transformer
CN203939245U (en) A kind of string girder tensioning frock
CN203531350U (en) U-shaped pull ring for steel beam fixing of cantilever outer frame
CN204265232U (en) A kind of I-beam section uses stressed suspension rod
CN110615349A (en) Round steel holding clamp
CN202729581U (en) Jaw mouth clamp for pipeline hoisting
CN206090825U (en) Steel construction girder steel connection structure
CN205034999U (en) Electric lifting device
CN202556295U (en) Lengthened wrench
CN204748525U (en) Y type transmission line iron tower bolt assembly and disassembly tools
CN202493027U (en) Template suspending device
CN204386031U (en) The crossbeam of bar and triangle gusset taken by a kind of band
CN204079243U (en) A kind of suspender of jack
CN201245406Y (en) Hoisting tong for clamping arc wall panel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150624

Termination date: 20190203