CN204401999U - With the climbing type scaffold of discharging platform - Google Patents
With the climbing type scaffold of discharging platform Download PDFInfo
- Publication number
- CN204401999U CN204401999U CN201520017274.1U CN201520017274U CN204401999U CN 204401999 U CN204401999 U CN 204401999U CN 201520017274 U CN201520017274 U CN 201520017274U CN 204401999 U CN204401999 U CN 204401999U
- Authority
- CN
- China
- Prior art keywords
- discharging platform
- building
- crossbeam
- scaffold
- climbing type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model relates to the climbing type scaffold of band discharging platform, comprise scaffold body, heavy frame and outrigger, heavy frame and outrigger is dismountable is arranged on building, scaffold body lower part is supported on heavy frame, outrigger is connected with lifting appliance, and the end that draws high of lifting appliance is connected with scaffold body; Also comprise interconnective discharging platform and discharging platform crossbeam, discharging platform cross beam support lives discharging platform, and discharging platform and/or the connection of discharging platform crossbeam are arranged on scaffold body, and discharging platform crossbeam is dismountable to be fixed on building.The utility model, after being dismantled by the tie point of discharging platform and building, can move up and down at building sidewall with climbing type scaffold, assist without the need to tower crane; Climb after preset height Deng climbing type scaffold, discharging platform and this layer of building can be connected and fixed again, realize the function of discharging platform, thus improve efficiency of construction, reduce construction cost.
Description
Technical field
The utility model relates to construction implement, particularly a kind of climbing type scaffold with discharging platform.
Background technology
When high-building construction, usually all discharging platform and climbing type scaffold can be used.Discharging platform sets up a kind of temporary operating platform in highrise building periphery, its role is to deposit the constructional materials that tower crane is sent here temporarily.Such as, when constructional materials is risen to preset height by tower crane, constructional materials can leave in discharging platform by fast transfer, and then transfers to from discharging platform and need position in building, thus reduces tower crane holding time.Climbing type scaffold is the scaffold that can be anchored at building outer wall and successively upwards climb.
During existing high-building construction, need first to be climbed to by climbing type scaffold the preset height of building, then utilizing tower crane discharging platform to be risen to the corresponding floor of scaffold installs fixing, after this layer of construction completes, discharging platform is needed again to dismantle from buildingsurface, and with tower crane handling to ground, scaffold then could be allowed again upwards to climb.
The operation repeatedly promoting and unload discharging platform like this, makes work progress become more loaded down with trivial details, and engineering cost rises.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of climbing type scaffold with discharging platform, and without the need to by tower crane, discharging platform can move up and down at building sidewall with climbing type scaffold.
The utility model solves the technical scheme that its technical problem adopts:
With the climbing type scaffold of discharging platform, comprise scaffold body, heavy frame and outrigger, described heavy frame and outrigger is dismountable is arranged on building, and outrigger position is higher than heavy frame, described scaffold body lower part is supported on heavy frame, described outrigger is connected with lifting appliance, and the end that draws high of described lifting appliance is connected with scaffold body; Also comprise interconnective discharging platform and discharging platform crossbeam, described discharging platform cross beam support lives discharging platform, and discharging platform and/or the connection of discharging platform crossbeam are arranged on scaffold body, and described discharging platform crossbeam is dismountable to be fixed on building.
Further, also comprise the discharging platform bracing frame be mounted on building, and discharging platform crossbeam is connected with discharging platform bracing frame is dismountable.
Further, also comprise oblique pull parts, described oblique pull parts one end is connected with discharging platform crossbeam, and the oblique pull parts other end is connected with the building sidewall higher than discharging platform.
Further, the position that described oblique pull parts are connected with discharging platform crossbeam is the one end away from discharging platform bracing frame.
Further, described oblique pull parts are wire rope.
Further, described lifting appliance is Lever Blocks, described in draw high end for the hook of Lever Blocks bottom, described hook hooks scaffold body.
Further, also comprise the junction steel plate for connecting described discharging platform crossbeam and discharging platform bracing frame, one end of described junction steel plate is connected with discharging platform transom bolt, and the other end of junction steel plate is connected with discharging platform bracing frame bolt.
The beneficial effects of the utility model are: the climbing type scaffold of band discharging platform of the present utility model, after being dismantled by the tie point of discharging platform and building, can move up and down, assist without the need to tower crane with climbing type scaffold at building sidewall; Climb after preset height Deng climbing type scaffold, discharging platform and this layer of building can be connected and fixed again, realize the function of discharging platform, thus improve efficiency of construction, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of a kind of embodiment of climbing type scaffold of band discharging platform of the present utility model, also show the different floors of building in figure;
Fig. 2 is the discharging platform crossbeam of Fig. 1 embodiment and the schematic diagram of discharging platform bracing frame junction;
In figure, Reference numeral is: scaffold body 1, heavy frame 11, outrigger 12, lifting appliance 13, draw high end 131, discharging platform 2, discharging platform crossbeam 21, oblique pull parts 22, discharging platform bracing frame 23, junction steel plate 24.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated:
With the climbing type scaffold of discharging platform, comprise scaffold body 1, heavy frame 11 and outrigger 12, described heavy frame 11 and outrigger 12 is dismountable is arranged on building, and outrigger 12 position is higher than heavy frame 11, described scaffold body 1 lower support is on heavy frame 11, described outrigger 12 is connected with lifting appliance 13, and the end 131 that draws high of described lifting appliance 13 is connected with scaffold body 1; Also comprise interconnective discharging platform 2 and discharging platform crossbeam 21, described discharging platform crossbeam 21 supports discharging platform 2, discharging platform 2 and/or discharging platform crossbeam 21 connection are arranged on scaffold, and described discharging platform crossbeam 21 is dismountable to be fixed on building.
As shown in Figure 1: heavy frame 11 is scaffold body 1 from lower support, outrigger 12 is upwards held from top by scaffold body 1 by lifting appliance 13.Lifting appliance 13 can be any device or equipment that can realize upwards enhanced feature, such as electric block or other similar boom hoistings, also can be preferably the Lever Blocks of compact structure.Lifting end 131 refers to and is connected the movable end that lifting appliance 13 moves up and down for lifting heavy lifting end 131 with scaffold body 1, can operate lifting appliance 13 and upwards be promoted by scaffold body 1.Such as described lifting end 131 can be the hook of Lever Blocks, hook is hooked scaffold body 1 and namely realizes temporarily being connected with scaffold body 1.
Discharging platform crossbeam 21 is equivalent to the main framing of discharging platform 2, for supporting the weight of discharging platform 2, discharging platform 2 and/or discharging platform crossbeam 21 connection are arranged on scaffold body 1, can be that discharging platform 2 is connected to scaffold body 1, also can be that discharging platform crossbeam 21 is connected on scaffold body 1, can also be that discharging platform 2 is all connected with discharging platform crossbeam 21 and is arranged on scaffold body 1, realize discharging platform 2 and follow scaffold body 1 together in the function that building sidewall moves up and down.
Described discharging platform crossbeam 21 is dismountable to be fixed on building, can be in the direct dismountable installation fixed buildings of discharging platform crossbeam 21, such as, with setscrew, discharging platform crossbeam 21 is fixed on architecture enclosing; Can also be that discharging platform crossbeam 21 is dismountable to be connected with certain fixed part on building, can be such as also comprise the discharging platform bracing frame 23 be mounted on building, and discharging platform crossbeam 21 be connected with discharging platform bracing frame 23 is dismountable.
Discharging platform bracing frame 23 can be embedded in fabric structure, or adopts the conventional fasteners such as expansion bolt to be fixedly mounted on building.After discharging platform crossbeam 21 is connected with discharging platform bracing frame 23, fabric structure can be utilized to bear discharging platform 2 weight, also can carry the interim constructional materials stacked on discharging platform 2.
Discharging platform crossbeam 21 can adopt any dismountable component with sufficient intensity with the connected mode of discharging platform bracing frame 23, such as, together with discharging platform crossbeam 21 is bolted with discharging platform bracing frame 23, or metal clasp is utilized to link together.It can be preferably the junction steel plate 24 also comprised for connecting described discharging platform crossbeam 21 and discharging platform bracing frame 23, one end and the discharging platform crossbeam 21 of described junction steel plate 24 are bolted, and junction steel plate 24 other end and discharging platform bracing frame 23 are bolted.
Such as, in embodiment illustrated in fig. 1, the concrete using method of climbing type scaffold of this band discharging platform can be, heavy frame 11 is arranged on building first floor 31, outrigger 12 is arranged on building third layer 33, scaffold body 1 lower support is on heavy frame 11, scaffold body 1 top is hooked by the hook of Lever Blocks, and Lever Blocks top is connected with outrigger 12.Discharging platform crossbeam 21 is connected with discharging platform bracing frame 23 pre-buried on the building second layer 32.Tower crane now can be utilized to transport the height of constructional materials to the building second layer 32, and constructional materials is quickly transferred on discharging platform 2, and then is transported to the place of needs, and aforesaid operations can not take the tower crane too many working time.
After this layer of construction complete, first discharging platform crossbeam 21 and discharging platform bracing frame 23 are dismantled, then take heavy frame 11 apart, allow the Lever Blocks of outrigger 12 carry the weight of scaffold body 1.Then operate Lever Blocks scaffold body 1 is upwards promoted, reach the building second layer 32 height bottom scaffold body 1 after, at the building second layer 32, heavy frame is installed again, loosen the weight bearing of Lever Blocks by scaffold body 1 on the heavy frame of the building second layer 32, the now outrigger 12 of demolition of buildings third layer 33, then again outrigger is installed in the position that building is higher, and again on outrigger, Lever Blocks is installed, hook scaffold body 1 with Lever Blocks.Now the discharging platform bracing frame of discharging platform crossbeam 21 with building third layer 33 is fixed.Said process achieves scaffold and to climb and discharging platform climbs, and does not need as traditional approach, to assist discharging platform installing/dismounting with tower crane, raising efficiency of construction.
In order to strengthen the stable connection of discharging platform 2 and building, preferably, can be also comprise oblique pull parts 22, described oblique pull parts 22 one end be connected with discharging platform crossbeam 21, and oblique pull parts 22 other end is connected with the building sidewall higher than discharging platform 2.
Preferred further, the position that described oblique pull parts 22 are connected with discharging platform crossbeam 21 is the one end away from discharging platform bracing frame 23.Described oblique pull parts 22 can be the parts that steel pipe or wire rope etc. have sufficient intensity, and after installing oblique pull parts 22, one end of discharging platform crossbeam 21 obtains discharging platform bracing frame 23 and supports, and the other end is held by oblique pull parts 22, increase platform steadiness.
Claims (7)
1. be with the climbing type scaffold of discharging platform, it is characterized in that, comprise scaffold body (1), heavy frame (11) and outrigger (12), described heavy frame (11) and outrigger (12) is dismountable is arranged on building, and outrigger (12) position is higher than heavy frame (11), described scaffold body (1) lower support is on heavy frame (11), described outrigger (12) is connected with lifting appliance (13), and the end (131) that draws high of described lifting appliance (13) is connected with scaffold body (1); Also comprise interconnective discharging platform (2) and discharging platform crossbeam (21), described discharging platform crossbeam (21) supports discharging platform (2), discharging platform (2) and/or discharging platform crossbeam (21) connection are arranged on scaffold body (1), and described discharging platform crossbeam (21) is dismountable to be fixed on building.
2. the climbing type scaffold of band discharging platform as claimed in claim 1, it is characterized in that, also comprise the discharging platform bracing frame (23) be mounted on building, and discharging platform crossbeam (21) is connected with discharging platform bracing frame (23) is dismountable.
3. the climbing type scaffold of band discharging platform as claimed in claim 1 or 2, it is characterized in that, also comprise oblique pull parts (22), described oblique pull parts (22) one end is connected with discharging platform crossbeam (21), and oblique pull parts (22) other end is connected with the building sidewall higher than discharging platform (2).
4. the climbing type scaffold of band discharging platform as claimed in claim 3, it is characterized in that, the position that described oblique pull parts (22) are connected with discharging platform crossbeam (21) is the one end away from discharging platform bracing frame (23).
5. the climbing type scaffold of band discharging platform as claimed in claim 3, it is characterized in that, described oblique pull parts (22) are wire rope.
6. the climbing type scaffold of band discharging platform as claimed in claim 1 or 2, it is characterized in that, described lifting appliance (13) is Lever Blocks, described in draw high the hook that end (131) is Lever Blocks bottom, described hook hooks scaffold body (1).
7. the climbing type scaffold of band discharging platform as claimed in claim 2, it is characterized in that, also comprise the junction steel plate (24) for connecting described discharging platform crossbeam (21) and discharging platform bracing frame (23), one end of described junction steel plate (24) is connected with discharging platform crossbeam (21) bolt, and the other end of junction steel plate (24) is connected with discharging platform bracing frame (23) bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520017274.1U CN204401999U (en) | 2015-01-09 | 2015-01-09 | With the climbing type scaffold of discharging platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520017274.1U CN204401999U (en) | 2015-01-09 | 2015-01-09 | With the climbing type scaffold of discharging platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204401999U true CN204401999U (en) | 2015-06-17 |
Family
ID=53425872
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520017274.1U Active CN204401999U (en) | 2015-01-09 | 2015-01-09 | With the climbing type scaffold of discharging platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204401999U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760566A (en) * | 2016-12-28 | 2017-05-31 | 中国冶集团有限公司 | A kind of alterable height type input and output material platform construction method |
CN106737519A (en) * | 2017-01-09 | 2017-05-31 | 甘肃中水电水工机械有限公司 | A kind of workshop steel plate classification storage rack |
CN107795133A (en) * | 2017-11-30 | 2018-03-13 | 中建四局第六建筑工程有限公司 | A kind of monoblock type shielded frame platform and its construction method |
CN109162439A (en) * | 2018-10-30 | 2019-01-08 | 中国十七冶集团有限公司 | A kind of discharging platform and its application method based on attachment type raise scaffold |
-
2015
- 2015-01-09 CN CN201520017274.1U patent/CN204401999U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760566A (en) * | 2016-12-28 | 2017-05-31 | 中国冶集团有限公司 | A kind of alterable height type input and output material platform construction method |
CN106760566B (en) * | 2016-12-28 | 2022-07-15 | 中国一冶集团有限公司 | Construction method of height-variable feeding and discharging platform |
CN106737519A (en) * | 2017-01-09 | 2017-05-31 | 甘肃中水电水工机械有限公司 | A kind of workshop steel plate classification storage rack |
CN107795133A (en) * | 2017-11-30 | 2018-03-13 | 中建四局第六建筑工程有限公司 | A kind of monoblock type shielded frame platform and its construction method |
CN107795133B (en) * | 2017-11-30 | 2024-03-22 | 中建四局第六建筑工程有限公司 | Integral protective frame platform and construction method thereof |
CN109162439A (en) * | 2018-10-30 | 2019-01-08 | 中国十七冶集团有限公司 | A kind of discharging platform and its application method based on attachment type raise scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204401999U (en) | With the climbing type scaffold of discharging platform | |
CN101177959A (en) | Curtain wall unit hanging equipment and construction method thereof | |
CN204899238U (en) | Unitized curtain wall plate hoist device | |
CN104727545A (en) | Large water tower cylinder hydraulic slip-form vertical-transportation system and method | |
CN202401769U (en) | Detachable concrete cloth machine for self-elevating creeping formwork system | |
CN204626998U (en) | A kind of attached lift scaffold discharging platform | |
CN210483094U (en) | Inverted triangular pipe truss lifting device | |
CN102677907A (en) | Method for manually installing steel beam at top of silo | |
CN105003070A (en) | Bilayer extensible unloading platform for building construction | |
CN204401995U (en) | Encorbelment support system in a kind of center of installing for dome structure | |
CN103016843B (en) | Pipeline mounting machine and construction method thereof | |
CN103552937B (en) | A kind of tower crane with distributor booms | |
CN103982046A (en) | Lifting and installation method of buckling restrained braces | |
CN105350698A (en) | Large-span dome installation construction method | |
CN115583584A (en) | Unequal-height double-fulcrum full-rotation type light truss hoisting device and construction method | |
CN105370027A (en) | Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure | |
CN213204913U (en) | Modular prefabricated staircase operation platform | |
CN210620081U (en) | Cantilever crane device suitable for dismantling external scaffold of assembled high-rise residence | |
CN213059778U (en) | Crane for civil engineering | |
CN204402001U (en) | For the mobile operating platform system that structure for steel structure roof inner slab is installed | |
CN211597658U (en) | Movable overhanging scaffold | |
CN102900099A (en) | Drop-slab construction process for underground concrete structures | |
CN107237515A (en) | The support meanss and its application method of circular steel truss structure | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN203320922U (en) | Supporting device for forming of elevator shaft template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |