CN204383737U - A kind of arranging device of coastal ocean monitoring platform - Google Patents

A kind of arranging device of coastal ocean monitoring platform Download PDF

Info

Publication number
CN204383737U
CN204383737U CN201420629577.4U CN201420629577U CN204383737U CN 204383737 U CN204383737 U CN 204383737U CN 201420629577 U CN201420629577 U CN 201420629577U CN 204383737 U CN204383737 U CN 204383737U
Authority
CN
China
Prior art keywords
rope
relations
pulling force
noose
arranging device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420629577.4U
Other languages
Chinese (zh)
Inventor
倪晓波
曾定勇
黄大吉
张涛
周锋
宣基亮
李佳
冯旭文
林其良
沈辉
尹文彬
李志远
何宇晴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Institute of Oceanography SOA
Original Assignee
Second Institute of Oceanography SOA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Institute of Oceanography SOA filed Critical Second Institute of Oceanography SOA
Priority to CN201420629577.4U priority Critical patent/CN204383737U/en
Application granted granted Critical
Publication of CN204383737U publication Critical patent/CN204383737U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ropes Or Cables (AREA)

Abstract

The utility model relates to marine monitoring technology field, aim to provide a kind of arranging device of coastal ocean monitoring platform, the utility model comprises 3 upper rope hose tools, 1 break off relations rope, 1 pulling force rope and 1 shackle, the two ends of described upper rope hose tool are equipped with the connection collar weaving one with upper rope hose tool rope body, and described pulling force rope, rope one end of breaking off relations are respectively equipped with and weave the connection collar integrally with pulling force rope rope body, the body of restricting of breaking off relations; Described rope rope body doubling of breaking off relations is inserted in this unhook and is restricted in the connection collar that one end is provided with and form the first noose, the doubling of residue unhook rope rope body is inserted in the first noose and is formed the second noose, successively repeatedly, until form M noose, the wherein natural number of M > 2.The utility model is simple for structure, draws materials simple and easy, economical, anti-fishery trawlnet monitoring platform safety and steady cloth can be made to put into seabed, and reclaim whole arranging device, can not produce potential threat to working platform by ingehious design.

Description

A kind of arranging device of coastal ocean monitoring platform
Technical field
The utility model relates to marine monitoring technology field, is specifically related to a kind of arranging device of coastal ocean monitoring platform.
Background technology
Ship observation, remote sensing observations and submarine observation are three large platforms of ocean observation, and coastal ocean monitoring platform is easily subject to fishery trawlnet action attacks, and can prevent the platform of fishery trawlnet from monitoring is the important process that current coastal ocean is monitored.
According to the Zhang Tao of the Second Institute of Oceanograghy,SOA, " anti-trawl sea bottom floating body observation platform " (patent No.: 201020195674.9) known of the development such as Ni Xiaobo, due to the platform of fishery trawlnet (i.e. ocean bottom floating body observation platform or be called coastal ocean monitoring platform) surface smoothing can be prevented, without any thrust, and platform is generally heavier, so just can not be subject to the winding of fishing net and seabed can be positioned at by pulsation-free, so its suspension hook laid generally is designed to embedded structure, safety while but bring higher requirement to laying.
At present, what have two kinds comparatively to commonly use lays method, one is that platform is directly thrown away seawater from research vessel deck, allow its free fall to seabed, the shortcoming of this method is that platform falling speed is fast, and platform and instrument easily damage, and platform such as the attitude after water cannot ensure, likely put upside down in seabed, thus bring very large negative effect to work.Another kind first hangs in sea again to seabed by rope from ship, then untied by rope to seabed by under diver, and the shortcoming of this method is costly, and production time is long, and diver has higher operating risk.
Utility model content
The technical problems to be solved in the utility model is, overcome deficiency of the prior art, provide a kind of arranging device of coastal ocean monitoring platform, it possesses the function laid safely from sea by monitoring platform to seabed, arranging device all reclaims simultaneously, thus does not affect safety and the work of platform.
For technical solution problem, solution of the present utility model is:
A kind of arranging device of coastal ocean monitoring platform is provided, comprise 3 upper rope hose tools, 1 break off relations rope, 1 pulling force rope and 1 shackle, the two ends of described upper rope hose tool are equipped with the connection collar weaving one with upper rope hose tool rope body, and described pulling force rope, rope one end of breaking off relations are respectively equipped with and weave the connection collar integrally with pulling force rope rope body, the body of restricting of breaking off relations; Described rope rope body doubling of breaking off relations is inserted in this unhook and is restricted in the connection collar that one end is provided with and form the first noose, the doubling of residue unhook rope rope body is inserted in the first noose and is formed the second noose, successively repeatedly, until form M noose, the wherein natural number of M > 2;
The connection collar that described pulling force rope is provided with by its end is connected with latch closure mutual between shackle, described 3 upper rope hose tool rope bodies run through by 3 equally spaced embedded suspension hooks in marine monitoring platform respectively, and 3 of these 3 upper rope hose tool one end connect the common latch closures of the collar and are connected to unload and buckle, 3 of its other end connect the collars and are connected with the mutual latch closure of the first noose that unhook is restricted.
In the utility model, described pulling force rope place extended line and the angle of restricting between the extended line of place that breaks off relations are greater than 30 °.
In the utility model, the connection collar that described upper rope hose tool, the rope that breaks off relations, pulling force rope are provided with is all in ellipticity.
In the utility model, the connection collar semi-major axis of described upper rope hose tool is 5 ~ 8 times of the cross-sectional diameter of upper rope hose tool, and upper rope hose tool length is 2 ~ 5 times of adjacent two embedded suspension hook spacing in marine monitoring platform.
In the utility model, the described connection collar semi-major axis breaking off relations rope is break off relations 5 ~ 8 times of cross-sectional diameter, the cross-sectional diameter 3 ~ 5 times for upper rope hose tool of rope, 4 ~ 5 times of the length of the rope that breaks off relations lay the to by marine monitoring platform sea area depth of water.
In the utility model, the connection collar semi-major axis of described pulling force rope is 5 ~ 8 times of the cross-sectional diameter of pulling force rope, and the length of pulling force rope is 1.5 ~ 2 times that marine monitoring platform lays the sea area depth of water.
In the utility model, the internal diameter size of described M the noose broken off relations on rope is 4 ~ 6 times of the cross-sectional diameter of this unhook rope.
In the utility model, described marine monitoring platform is anti-trawl sea bottom floating body observation platform.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is simple for structure, draws materials simple and easy, economical, anti-fishery trawlnet monitoring platform safety and steady cloth can be made to put into seabed, and reclaim whole arranging device, can not produce potential threat to working platform by ingehious design.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the schematic cross-section of rope section structure of rising to the bait;
Fig. 3 is the schematic cross-section of unhook rope section structure;
Description of reference numerals: pulling force rope 1, shackle 2, upper rope hose tool 3, rope body 31, connects the collar 32, marine monitoring platform 4, connects the collar 5, and rope body 6, first noose 61, second noose the 62, three noose 63, remains the rope rope body 7 that breaks off relations.
Detailed description of the invention
Following embodiment can make the technical personnel of this professional skill field more fully understand the utility model, but limits the utility model never in any form.
By reference to the accompanying drawings, detailed description of the invention of the present utility model is described.
As Fig. 1, the utility model provides a kind of specific embodiment of coastal ocean monitoring platform 4 arranging device, wherein this arranging device comprises 3 upper rope hose tools 3,1 unhook ropes, 1 pulling force rope 1 and 1 shackle 2, the two ends of described upper rope hose tool 3 are equipped with the connection collar 32 weaving one with upper rope hose tool rope body 31, and described pulling force rope 1, rope one end of breaking off relations be respectively equipped with body of restricting with pulling force rope 1, the body 6 of restricting of breaking off relations weaves the connection collar 5 integrally; Described rope rope body 6 doubling of breaking off relations is inserted in this unhook and is restricted in the connection collar 5 that one end is provided with and form the first noose 61, the doubling of residue unhook rope rope body 7 is inserted in the first noose 61 and is formed the second noose 62, the doubling of residue unhook rope rope body 7 is inserted in the second noose 62 and is formed the 3rd noose 63, successively repeatedly, until form M noose, the wherein natural number of M > 2;
The connection collar that described pulling force rope 1 is provided with by its end is connected with latch closure mutual between shackle 2, described 3 upper rope hose tool rope bodies 31 run through by 3 equally spaced embedded suspension hooks in marine monitoring platform 4 respectively, and 3 of these 3 upper rope hose tool 3 one end connect the common latch closures of the collars 32 and are connected in shackle 2,3 of its other end connect the collars 32 and are connected with the mutual latch closure of the first noose 61 of restricting that breaks off relations.
Wherein: described pulling force rope 1 place extended line and the angle of restricting between the extended line of place that breaks off relations are greater than 30 °, the connection collar that described upper rope hose tool 3, the rope that breaks off relations, pulling force rope 1 are provided with is all in the ellipticity collar.
As Fig. 2, described 3 upper rope hose tools 3 all select common nylon rope, nylon material economy and durability, smooth surface, and be easy to pull in the collar, two ends are woven into the ellipticity collar, and surrounding is smooth, are easy to pull; The connection collar 32 semi-major axis of upper rope hose tool 3 is 6 times of the cross-sectional diameter of upper rope hose tool 3, and upper rope hose tool 3 length is 3 times of adjacent two embedded suspension hook spacing in marine monitoring platform 4, and upper rope hose tool 3 breaking force is 1 times of monitoring platform weight.
As Fig. 3, unhook rope selects Di Nima to restrict, and its diameter under identical breaking force condition is less than nylon rope 3-5 times, is easy to operation.One end is woven into the ellipticity collar, and surrounding is smooth, is easy to pull; The described connection collar 5 semi-major axis breaking off relations rope is the break off relations cross-sectional diameter 6 times of rope, the cross-sectional diameter 4 times for upper rope hose tool 3, the rope breaking force that breaks off relations is 1 times of monitoring platform weight, and the length of the rope that breaks off relations lays by marine monitoring platform 44 ~ 5 times of the sea area depth of water.
The connection collar semi-major axis of described pulling force rope 1 is 7 times of the cross-sectional diameter of pulling force rope 1, and the length of pulling force rope 1 is 1.5 times that marine monitoring platform 4 lays the sea area depth of water.
The breaking force of described pulling force rope 1 and shackle 2 is 5 times of marine monitoring platform 4 weight.
The internal diameter size of described M the noose broken off relations on rope is 5 times of the cross-sectional diameter of this unhook rope.
Therefore, actual range of the present utility model not only comprises the disclosed embodiments, be also included under claims implement or perform all equivalents of the present utility model.

Claims (7)

1. the arranging device of a coastal ocean monitoring platform, comprise 3 upper rope hose tools, 1 break off relations rope, 1 pulling force rope and 1 shackle, it is characterized in that, the two ends of described upper rope hose tool are equipped with the connection collar weaving one with upper rope hose tool rope body, and described pulling force rope, rope one end of breaking off relations are respectively equipped with and weave the connection collar integrally with pulling force rope rope body, the body of restricting of breaking off relations; Described rope rope body doubling of breaking off relations is inserted in this unhook and is restricted in the connection collar that one end is provided with and form the first noose, the doubling of residue unhook rope rope body is inserted in the first noose and is formed the second noose, successively repeatedly, until form M noose, the wherein natural number of M > 2;
The connection collar that described pulling force rope is provided with by its end is connected with latch closure mutual between shackle, described 3 upper rope hose tool rope bodies run through by 3 equally spaced embedded suspension hooks in marine monitoring platform respectively, and 3 of these 3 upper rope hose tool one end connect the common latch closures of the collar and are connected to unload and buckle, 3 of its other end connect the collars and are connected with the mutual latch closure of the first noose that unhook is restricted.
2. arranging device according to claim 1, is characterized in that, described pulling force rope place extended line and the angle of restricting between the extended line of place that breaks off relations are greater than 30 °.
3. arranging device according to claim 1, is characterized in that, the connection collar that described upper rope hose tool, the rope that breaks off relations, pulling force rope are provided with is all in ellipticity.
4. arranging device according to claim 3, is characterized in that, the connection collar semi-major axis of described upper rope hose tool is 5 ~ 8 times of the cross-sectional diameter of upper rope hose tool, and upper rope hose tool length is 2 ~ 5 times of adjacent two embedded suspension hook spacing in marine monitoring platform.
5. arranging device according to claim 3, it is characterized in that, the described connection collar semi-major axis breaking off relations rope is break off relations 5 ~ 8 times of cross-sectional diameter, the cross-sectional diameter 3 ~ 5 times for upper rope hose tool of rope, 4 ~ 5 times of the length of the rope that breaks off relations lay the to by marine monitoring platform sea area depth of water.
6. arranging device according to claim 3, is characterized in that, the connection collar semi-major axis of described pulling force rope is 5 ~ 8 times of the cross-sectional diameter of pulling force rope, and the length of pulling force rope is 1.5 ~ 2 times that marine monitoring platform lays the sea area depth of water.
7. arranging device according to claim 1, is characterized in that, the internal diameter size of described M the noose broken off relations on rope is 4 ~ 6 times of the cross-sectional diameter of this unhook rope.
CN201420629577.4U 2014-10-28 2014-10-28 A kind of arranging device of coastal ocean monitoring platform Expired - Fee Related CN204383737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420629577.4U CN204383737U (en) 2014-10-28 2014-10-28 A kind of arranging device of coastal ocean monitoring platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420629577.4U CN204383737U (en) 2014-10-28 2014-10-28 A kind of arranging device of coastal ocean monitoring platform

Publications (1)

Publication Number Publication Date
CN204383737U true CN204383737U (en) 2015-06-10

Family

ID=53356476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420629577.4U Expired - Fee Related CN204383737U (en) 2014-10-28 2014-10-28 A kind of arranging device of coastal ocean monitoring platform

Country Status (1)

Country Link
CN (1) CN204383737U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114633958A (en) * 2022-01-14 2022-06-17 枣庄市三维技术有限公司 Ton bag winding roller for winding ton bags and winding method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114633958A (en) * 2022-01-14 2022-06-17 枣庄市三维技术有限公司 Ton bag winding roller for winding ton bags and winding method thereof

Similar Documents

Publication Publication Date Title
CN210761225U (en) Fishing device for seabed observation system
NO334957B1 (en) Aquaculture system.
AU2020100787A4 (en) Recovery Device for Seabed Based Environment Monitoring System without Release Function and Recovery Method Thereof
JP6406665B2 (en) Floating fish reef collection device and collection method
CN204383737U (en) A kind of arranging device of coastal ocean monitoring platform
KR101276361B1 (en) Recovery net
JP5881484B2 (en) Underwater floating fish reef and its recovery method
CN106348154B (en) A kind of suspension hook and application method for lifting artificial marine habitat
JP5255078B2 (en) Collection method of middle-floating floating reef
CN104290881B (en) A kind of coastal ocean monitoring platform lay method
CN208149572U (en) A kind of fire-fighting and rescue marine salvage equipment
TR201808748T4 (en) Reservoir-cage immersion system for culture and / or conservation of hydrobiological species.
CN204443749U (en) A kind of dual-purpose fishing net
CN204432990U (en) Hoisting crane in water
NO337394B1 (en) Mooring System
KR20130061159A (en) Artificial reefs to prevent fishing of low-tether fishing boats for protecting fish stocks at sea
NO339200B1 (en) Mooring system
CN104092153A (en) Method for allowing plurality of submarine cables to penetrate through same J-shaped pipe
CN203946254U (en) A kind of seabed multi-type drags for cable anchor
JP5684220B2 (en) How to install a buoy
JP2012034627A (en) Floating fish reef device
CN106818656B (en) Conveniently-operated large mesh net and net hauling method for offshore operation of large mesh net
CN206203658U (en) A kind of suspension hook for lifting artificial marine habitat
CN202115691U (en) Salvage device of marine mooring system
CN204512294U (en) Platform hawser rapid fixing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150610

Termination date: 20171028