CN204326499U - A kind of attachment anchor device for building operations elevator - Google Patents

A kind of attachment anchor device for building operations elevator Download PDF

Info

Publication number
CN204326499U
CN204326499U CN201420784950.3U CN201420784950U CN204326499U CN 204326499 U CN204326499 U CN 204326499U CN 201420784950 U CN201420784950 U CN 201420784950U CN 204326499 U CN204326499 U CN 204326499U
Authority
CN
China
Prior art keywords
connecting rod
quadrilateral frame
building operations
anchor slab
anchor device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420784950.3U
Other languages
Chinese (zh)
Inventor
王大磊
余流
石伟
樊云鹏
胡锋
张倩
朱芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201420784950.3U priority Critical patent/CN204326499U/en
Application granted granted Critical
Publication of CN204326499U publication Critical patent/CN204326499U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of attachment anchor device for building operations elevator, comprise the built-in fitting be arranged in floor, described built-in fitting is made up of quadrilateral frame and the connecting rod being fixedly installed on quadrilateral frame four interior angles, the upper surface of described quadrilateral frame is connected with upper anchor slab by connecting rod, the lower surface of described quadrilateral frame is connected with lower anchor slab by connecting rod, and the plate face of described upper anchor slab is welded with Cantilever Beams.The advantages such as the utility model has is convenient to installation and removal, shortens construction speed, time saving and energy saving, safe and reliable.

Description

A kind of attachment anchor device for building operations elevator
Technical field
The utility model relates to a kind of architectural furniture, in particular, relates to a kind of attachment anchor device for building operations elevator.
Background technology
At present, construction elevator attachment anchor structure usually for be the highrise building of profile rule, do specially treated before construction is needed for irregular highrise building, very inconvenient; Existing anchor structure generally needs to do built-in fitting at inside concrete in advance, and some meetings affect original reinforcement placement, and for irregular highrise building, built-in fitting size, position are not identical, and very bad assurance, brings difficulty to construction; Existing construction elevator attachment anchor structure generally needs to shift to an earlier date placing embedded parts in concrete, removes difficulty, affect construction speed after construction completes; Irregular high-rise buildings construction elevator attachment is different in size, and existing attachment anchor structure is inconvenient to adjust length, and construction safety is difficult to ensure.
Utility model content
The purpose of this utility model is to overcome deficiency of the prior art, there is provided one according to building shape adjust size at any time, installation and removal can be convenient to, shorten construction speed, time saving and energy saving, safe and reliable a kind of attachment anchor device for building operations elevator.
The purpose of this utility model is achieved through the following technical solutions:
A kind of attachment anchor device for building operations elevator, comprise the built-in fitting be arranged in floor, described built-in fitting is made up of quadrilateral frame and the connecting rod being fixedly installed on quadrilateral frame four interior angles, the upper surface of described quadrilateral frame is connected with upper anchor slab by connecting rod, the lower surface of described quadrilateral frame is connected with lower anchor slab by connecting rod, and the plate face of described upper anchor slab is welded with Cantilever Beams.
Described built-in fitting is set at least 2 groups, and often group is configured to by two described quadrilateral frames.
Described quadrilateral frame is mutually permanently connected by angle steel and forms.
Described connecting rod is that screw rod is made.
Described Cantilever Beams is steel I-beam.
Described anchor slab is made up of steel plate.
Compared with prior art, the beneficial effect that the technical solution of the utility model is brought is:
In device of the present utility model, Cantilever Beams is fixedly connected with anchor slab, anchor slab is connected with connecting rod by fixture, therefore in work progress, when encountering the irregular building of profile, the length of Cantilever Beams can be changed at any time as required, thus ensure that the construction elevator arranged by Cantilever Beams remains on reliable and stable vertical direction, convenient and practical; In addition the connecting rod be embedded in floor is fixed by quadrilateral frame, ensure that these connecting rods can not be out of shape in the concrete placement of floor, simultaneously after construction completes, the projection of connecting rod is removed, existing building structure can not be damaged, safe and reliable.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the plan structure schematic diagram in Fig. 1.
Reference numeral: 1-floor 2-connecting rod 3-quadrilateral frame 4-anchor slab 5-Cantilever Beams 6-nut
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model will be further described.
As shown in Figure 1 to Figure 2, a kind of attachment anchor device for building operations elevator, comprise the built-in fitting be symmetricly set in floor 1, described built-in fitting is made up of connecting rod 2, connecting rod 2 is screw rod, built-in fitting is set to two groups, often organize built-in fitting and include four connecting rods 2 and two quadrilateral frames 3, connecting rod 2 is fixed on four interior angles of quadrilateral frame 3, to ensure that the built-in fitting that connecting rod 2 is formed can not be out of shape in work progress, quadrilateral frame 3 is welded by angle steel head and the tail, the two ends up and down of connecting rod 2 are connected with anchor slab 4 respectively by the connecting hole that anchor slab 4 is offered, namely anchor slab 4 also lays respectively at the upper and lower of quadrilateral frame 3, pass through nut 6 again by fastening for anchor slab 4, anchor slab 4 is made up of steel plate, the horizontal direction being positioned at the anchor slab 4 of connecting rod 2 upper end is welded with Cantilever Beams 5, Cantilever Beams 5 is H profile steel.
The specific operation process of the utility model device is as follows:
(1) before concreting, connecting rod 2 is welded to the corner of quadrilateral frame 3, forms one is fixed four connecting rods 2 built-in fitting by two quadrilateral frames 3.
(2), during concreting, pre-buried 4 built-in fittings in every floor same position place adhering to construction elevator are being needed.
(3) after hardening of concrete, place anchor slab 4 respectively on the top of connecting rod 2, then at anchor slab 4 top tightening fastener parts 6 i.e. nut, as above step is by the anchor slab 4 also fixation of connecting rod 2 bottom.
(5) two Cantilever Beams 5 are welded on respectively anchor slab 4 upper surface on floor top, the length of H profile steel Cantilever Beams 5 end can regulate as required.
(6) after the external construction elevator of H profile steel Cantilever Beams 5 end is removed, available electrogas welding cuts open the pad of Cantilever Beams 5 and anchor slab 4, take off H profile steel Cantilever Beams 5, then take off securing member 6, anchor slab 4 successively, last electricity consumption gas welding slices off the exposed parts of connecting rod 2.

Claims (6)

1. the attachment anchor device for building operations elevator, comprise the built-in fitting be arranged in floor, it is characterized in that, described built-in fitting is made up of quadrilateral frame and the connecting rod being fixedly installed on quadrilateral frame four interior angles, the upper surface of described quadrilateral frame is connected with upper anchor slab by connecting rod, the lower surface of described quadrilateral frame is connected with lower anchor slab by connecting rod, and the plate face of described upper anchor slab is fixedly connected with Cantilever Beams.
2. a kind of attachment anchor device for building operations elevator according to claim 1, it is characterized in that, described built-in fitting is set at least 2 groups, and often group is configured to by two described quadrilateral frames.
3. a kind of attachment anchor device for building operations elevator according to claim 1 and 2, it is characterized in that, described quadrilateral frame is mutually permanently connected by angle steel and forms.
4. a kind of attachment anchor device for building operations elevator according to claim 1, is characterized in that, described connecting rod is that screw rod is made.
5. a kind of attachment anchor device for building operations elevator according to claim 1, it is characterized in that, described Cantilever Beams is steel I-beam.
6. a kind of attachment anchor device for building operations elevator according to claim 1, it is characterized in that, described anchor slab is made up of steel plate.
CN201420784950.3U 2014-12-10 2014-12-10 A kind of attachment anchor device for building operations elevator Expired - Fee Related CN204326499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420784950.3U CN204326499U (en) 2014-12-10 2014-12-10 A kind of attachment anchor device for building operations elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420784950.3U CN204326499U (en) 2014-12-10 2014-12-10 A kind of attachment anchor device for building operations elevator

Publications (1)

Publication Number Publication Date
CN204326499U true CN204326499U (en) 2015-05-13

Family

ID=53162872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420784950.3U Expired - Fee Related CN204326499U (en) 2014-12-10 2014-12-10 A kind of attachment anchor device for building operations elevator

Country Status (1)

Country Link
CN (1) CN204326499U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152097A (en) * 2017-05-12 2017-09-12 东南大学 Band attached prestressing force assembled outside plate framework of encorbelmenting consumes energy the structure of frame strengthening

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152097A (en) * 2017-05-12 2017-09-12 东南大学 Band attached prestressing force assembled outside plate framework of encorbelmenting consumes energy the structure of frame strengthening

Similar Documents

Publication Publication Date Title
CN201981670U (en) Connection piece for composite prefabricated concrete wallboard
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN103122696B (en) Cast-in-place concrete floor gage controller and method thereof
CN203403674U (en) Adjustable stair steel form of instrument formula
CN204781970U (en) Template fixing device with adjustable
CN204645570U (en) One can have enough to meet the need elevator shaft protective platform
CN206562761U (en) Floor post-cast strip boatswain chair mould
CN204326499U (en) A kind of attachment anchor device for building operations elevator
CN204212447U (en) Door and window concrete arch lintel strengthening construction device
CN206512866U (en) Concealed installation Fire Hose backing apparatus
CN107447975A (en) Exterior wall scaffold tapered cup nut wall-connecting piece
CN203701596U (en) Scissor-type connecting-rod keel-supporting system
CN201447862U (en) Instrumental operating platform used for elevator shaft shear wall shuttering erection
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN205134546U (en) But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization
CN204983722U (en) Steel structural member consolidates interim spelling positioner
CN203846655U (en) Short-cantilever dry-hanging device of stone curtain wall
CN204343682U (en) Bed die bracing or strutting arrangement outside shear wall
CN206784960U (en) Lower supporting type overhanging unloading platform
CN204850420U (en) Intelligent building templates support frame
CN204826220U (en) Location built -in fitting with U type groove
CN205918142U (en) Aligning device is assembled to shear force wall
CN204357132U (en) Packaged type building shear wall and floor concrete casting separating device
CN204174906U (en) A kind of builder's jack anchor ring
CN103848320B (en) A kind of attachment node of skyscraper external elevator guide rail and attachment construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150513

Termination date: 20191210