CN204311331U - Highway waste asphalt rejects regeneration integrated construction device - Google Patents

Highway waste asphalt rejects regeneration integrated construction device Download PDF

Info

Publication number
CN204311331U
CN204311331U CN201420752409.4U CN201420752409U CN204311331U CN 204311331 U CN204311331 U CN 204311331U CN 201420752409 U CN201420752409 U CN 201420752409U CN 204311331 U CN204311331 U CN 204311331U
Authority
CN
China
Prior art keywords
waste asphalt
construction device
integrated construction
cutter sweep
hydraulic cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420752409.4U
Other languages
Chinese (zh)
Inventor
杨松涛
侯宏伟
熊达煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420752409.4U priority Critical patent/CN204311331U/en
Application granted granted Critical
Publication of CN204311331U publication Critical patent/CN204311331U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)
  • Road Repair (AREA)

Abstract

The utility model discloses highway waste asphalt and reject regeneration integrated construction device, it is characterized in that, comprise car body, be arranged on the coil heating apparatus in haulage vehicle front; Cutter sweep is arranged on coil heating apparatus rear, described cutter sweep comprises the hydraulic cylinder be fixed on above railway carriage, track installation is at hydraulic cylinder side, described track is provided with and is connected removable coaster with hydraulic cylinder, expansion link is connected to below movable block, and its bottom is provided with the rotatable cutting knife passing into ground; Compared with prior art, the utility model has the advantages that: in disclosed documents, it needs plurality of devices collaborative work simultaneously in work progress, occupied ground is comparatively large, and cost is high, and the utility model possesses heating simultaneously, excision, pulverize batch mixing, discharge several function of virgin material, the cost of equipment is lowered greatly.

Description

Highway waste asphalt rejects regeneration integrated construction device
Technical field
The invention belongs to highway construction technical field, be specifically related to a kind of highway waste asphalt and reject regeneration integrated construction device and construction method thereof.
Background technology
When the reparation etc. of asphalt pavement road is constructed, as the method peeling off asphalt pavement body, known employing manpower multitude cuts a hole technique and water spray craft.
The Chinese invention patent application method for removing asphalt pavement of publication number CN101415886A, removing asphalt pavement system, electromagnetic induction coil unit, so a kind of method for removing asphalt pavement is disclosed in the stripping means of removing asphalt pavement device and asphalt pavement body, it is for peel off the asphalt pavement body be laid on steel plate from steel plate, and the method for removing asphalt pavement removed is carried out as the asphalt blocks with prescribed level, it is characterized in that, comprise: by carrying out electromagnetic induction heating to described steel plate, the soften layer contacted with described steel plate is formed at the soften layer formation process of described asphalt pavement body below, formed described soften layer is peeled off from the described steel plate contacted with described soften layer, blocks described asphalt pavement body and the removal process of taking out as asphalt blocks, and the described asphalt blocks taken out by described removal process are carried out the mobile process of movement.
The document and the application belong to same technical field, the problem solved is identical, the more complicated but it is constructed, in work progress, the construction equipment used is a lot, each construction cell is all independent individual, be not integrated device, its construction and construction cost higher, if there is a kind of equipment can reach the function of several distinct device in above-mentioned open file, cost can be made so greatly to reduce, also can reduce construction cost simultaneously.
Summary of the invention
The present invention is directed to above shortcoming, the equipment executing man-hour requirement based on the existing removing asphalt pavement of solution is many, the problem that cost is high.Propose a kind of highway waste asphalt and reject regeneration integrated construction device and construction method thereof, this equipment integrating possesses heating simultaneously, and excision, pulverizes batch mixing, discharges several function of virgin material, the cost of equipment is lowered greatly.
For realizing object of the present invention, the technical solution used in the present invention is:
Highway waste asphalt rejects regeneration integrated construction device, it is characterized in that, comprises car body, be arranged on the coil heating apparatus in haulage vehicle front;
Cutter sweep is arranged on coil heating apparatus rear, described cutter sweep comprises the hydraulic cylinder be fixed on above railway carriage, track installation is at hydraulic cylinder side, described track is provided with and is connected removable coaster with hydraulic cylinder, expansion link is connected to below movable block, and its bottom is provided with the rotatable cutting knife passing into ground;
Conveyer is arranged on cutter sweep rear, and described conveyer comprises and is arranged on lifting pulley unit above railway carriage and conveyer belt, and described conveyer belt feed end is provided with shovel board, is connected with spring-backed quill between shovel board and pulley unit;
Regeneration construction equipment, described regenerating unit comprises virgin material adding set and heating cabinet, is connected with feed pipe between described virgin material adding set and heating cabinet, is provided with the opening receiving conveyer belt charging bottom heating cabinet, agitator tank is arranged on below heating cabinet, and its bottom is provided with discharging opening.
Preferentially, heating cabinet is coil heats case, is provided with filter screen bottom it, is arranged on above filter screen by the rod that pulverizes moved around in passageway of driven by motor.
Preferentially, spring-backed quill is divided into outer tube and interior pipe, is provided with limited block in described outer tube, and interior pipe to penetrate in outer tube and is provided with spring between its top and limited block; Wirerope-winding on wheel unit, and penetrates outer tube and is connected with interior pipe.
Preferentially, conveyer belt discharge end is also provided with weighing device.
Preferentially, also comprise virgin material storage bin and generator, both are arranged on car body, and described generator is with cutter sweep, be connected electric power system respectively between conveyer and regeneration construction equipment.
Preferentially, described car body is electricity energy driven vehicle.
Based on said structure, the present invention also provides a kind of highway waste asphalt to reject regeneration integrated construction device construction method, it is characterized in that, comprises the following steps,
(1) starter-generator, starts to power to cutter sweep, conveyer and regeneration construction equipment, setting body movement program;
(2) car body starts to move on road, and coil heating apparatus drops to above roadbed, and carries out thermoplastic to it, makes its roadbed temperature between 60 DEG C-80 degrees Celsius;
(3) based on step (2), cutter sweep starts to cut thermoplastic roadbed, is advanced and retreats, cutting knife is cut anyhow, forms rectangular block by PLC programme-control car body;
(4) based on step (3), rectangular block is scooped up feeding conveyer belt by shovel board, and rectangular block is sent in heating cabinet by the opening bottom heating cabinet and heated by conveyer belt; Before feeding, weighing device takes rectangular block weight;
(5) based on step (4), heating cabinet starts to heat rectangular block, and in the process, driven by motor is pulverized rod and moved in passageway and to be pulverized by rectangular block, falls in agitator tank after rectangular block is pulverized by filter screen;
(6) based on step (5), virgin material adding set (503) utilizes feed pipe to be sent into by virgin material in agitator tank by the weight taking rectangular block in advance to carry out virgin material and old material mix and blend in proportion, and pours road surface into by discharging opening;
(7) constantly repeat step (2)-step (6), constantly road is constructed;
(8) based on step (7), road roller is immediately following car body, and material discharging opening being poured into road surface flattens and forms new roadbed.
Compared with prior art, advantage of the present invention is: in disclosed documents, it needs plurality of devices collaborative work simultaneously in work progress, occupied ground is comparatively large, and cost is high, and the present invention possesses heating simultaneously, excision, pulverize batch mixing, discharge several function of virgin material, the cost of equipment is lowered greatly.
Accompanying drawing explanation
The following accompanying drawing by means of embodiment carries out brief description to the present invention now.In accompanying drawing:
Fig. 1 shows the structural representation that highway waste asphalt rejects regeneration integrated construction device;
Fig. 2 shows the face upwarding assumption diagram of Fig. 1;
Fig. 3 shows the structural layout plan of conveyer and regeneration construction equipment;
Fig. 4 shows the structural configuration detail drawing of regeneration construction equipment;
Fig. 5 shows the structural configuration detail drawing of spring-backed quill;
Fig. 6 shows construction plan of the present invention;
Fig. 7 shows the present invention and to construct side view;
Fig. 8 shows the schematic diagram that shovel board of the present invention scoops up rectangular block.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.Following examples will contribute to those skilled in the art and understand the present invention further, but not limit the present invention in any form.It should be pointed out that to those skilled in the art, without departing from the inventive concept of the premise, some distortion and improvement can also be made.These all belong to protection scope of the present invention.
Embodiment 1
Highway waste asphalt rejects regeneration integrated construction device, comprises car body 1, is arranged on the coil heating apparatus 9 in haulage vehicle 1 front; Coil heating apparatus 9 shape is circular or square, and its heating surface (area) (HS is greater than cutting area.Car body 1 is electricity energy driven vehicle, adopts electrical energy drive can fuel saving, and vehicle, in work progress, can pause for a long time, and as adopted fuel oil to drive, then car can not stop working again, causes waste, adopts electrical energy drive then to there will not be situation about wasting energy.
Cutter sweep 2 is arranged on coil heating apparatus 9 rear, and it mainly cuts the road surface after thermoplastic.Cutter sweep 2 comprises the hydraulic cylinder 202 be fixed on above railway carriage, track 203 is arranged on hydraulic cylinder 202 side, described track 203 is provided with and is connected removable coaster 205 with hydraulic cylinder 202, expansion link 204 is connected to below movable block 205, and its bottom is provided with the rotatable cutting knife 201 passing into ground.Cutting knife 201 does transverse cuts by the flexible of hydraulic cylinder 202, does vertical cutting by the advance of car body 1 and retrogressing.
Conveyer 3 is arranged on cutter sweep 2 rear, described conveyer 3 comprises and is arranged on lifting pulley unit 304 above railway carriage and conveyer belt 305, described conveyer belt 305 feed end is provided with shovel board 301, is connected with spring-backed quill 303 between shovel board 301 and pulley unit 304.Conveyer belt 305 discharge end is also provided with weighing device, can take the weight that rectangular block 10 got by shovel like this, for follow-up auto feed provides data.
Get in rectangular block 10 process at shovel board 301 shovel, on rugged roadbed, road surface is close in order to make shovel board 301, spring-backed quill 303 is divided into outer tube 3032 and interior pipe 3035, be provided with limited block 3033 in described outer tube 3032, interior pipe 3035 to penetrate in outer tube 3032 and is provided with spring 3034 between its top and limited block 3033; Wire rope 3031 is wrapped in above wheel unit 304, and penetrates outer tube 3032 and be connected with interior pipe 3035.Spring 3034 is in and is in the state of upspringing always, can be close to road surface like this, and when shovel board 301 runs into rugged roadbed, spring 3034 is compressed and keeps elastic force always, guarantees that it accurately scoops up rectangular block 10.
Regeneration construction equipment 5, described regenerating unit 5 comprises virgin material adding set 503 and heating cabinet 501, feed pipe 502 is connected with between described virgin material adding set 503 and heating cabinet 501, the opening receiving conveyer belt 305 charging is provided with bottom heating cabinet 501, agitator tank 507 is arranged on below heating cabinet 501, and its bottom is provided with discharging opening 508.
The heating cabinet 501 of regeneration construction equipment 5 is coil heats case, is provided with filter screen 507 bottom it, and the rod 505 that pulverizes moved around in passageway 506 driven by motor 504 is arranged on above filter screen 507.
In addition, further comprises virgin material storage bin 8, both are arranged on car body 1, and virgin material storage bin 8 is used for the material that stores for future use, and supplement material in time when virgin material adding set 503 materials inside is finished.Construction equipment on car body 1, electric power system is necessary, therefore further comprises generator 4, generator 4 and cutter sweep 2, conveyer 3 and regenerate and be connected electric power system respectively between construction equipment 5 and make each equipment work, in addition, car body 1 supply of electric power also can use generator 4.
Based on said structure, when the present invention constructs, comprise the following steps,
(1) starter-generator 4, starts to power to cutter sweep 2, conveyer 3 and regeneration construction equipment 5, setting car body 1 motor program;
(2) car body 1 starts to move on road, and coil heating apparatus 9 drops to above roadbed, and carries out thermoplastic to it, makes its roadbed temperature between 60 DEG C-80 degrees Celsius;
(3) based on step (2), cutter sweep 2 starts to cut thermoplastic roadbed, is advanced and retreats, cutting knife 201 is cut anyhow, forms rectangular block 10 by PLC programme-control car body 1;
(4) based on step (3), rectangular block 10 scoops up by shovel board 301 sends into conveyer belt 305, and rectangular block 10 is sent in heating cabinet 501 by the opening bottom heating cabinet 501 and heated by conveyer belt 305; Before feeding, weighing device takes rectangular block 10 weight;
(5) based on step (4), heating cabinet 501 starts to heat rectangular block 10, and in the process, motor 504 drives and pulverizes rod 505 and move in passageway 506 and pulverized by rectangular block 10, falls in agitator tank 507 after rectangular block 10 is pulverized by filter screen 507;
(6) based on step (5), virgin material adding set 503 utilizes feed pipe 502 to be sent into by virgin material in agitator tank 507 by the weight taking rectangular block 10 in advance to carry out virgin material and old material mix and blend in proportion, and pours road surface into by discharging opening 508;
(7) constantly repeat step (2)-step (6), constantly road is constructed;
(8) based on step (7), road roller is immediately following car body 1, and material discharging opening 508 being poured into road surface flattens and forms new roadbed 11.

Claims (6)

1. highway waste asphalt rejects regeneration integrated construction device, it is characterized in that, comprises car body (1), be arranged on the coil heating apparatus (9) in haulage vehicle (1) front;
Cutter sweep (2) is arranged on coil heating apparatus (9) rear, described cutter sweep (2) comprises the hydraulic cylinder (202) be fixed on above railway carriage, track (203) is arranged on hydraulic cylinder (202) side, described track (203) is provided with and is connected removable coaster (205) with hydraulic cylinder (202), expansion link (204) is connected to movable block (205) below, and its bottom is provided with the rotatable cutting knife (201) passing into ground;
Conveyer (3) is arranged on cutter sweep (2) rear, described conveyer (3) comprises and is arranged on lifting pulley unit (304) above railway carriage and conveyer belt (305), described conveyer belt (305) feed end is provided with shovel board (301), is connected with spring-backed quill (303) between shovel board (301) and pulley unit (304);
Regeneration construction equipment (5), described regenerating unit (5) comprises virgin material adding set (503) and heating cabinet (501), feed pipe (502) is connected with between described virgin material adding set (503) and heating cabinet (501), heating cabinet (501) bottom is provided with the opening receiving conveyer belt (305) charging, agitator tank (507) is arranged on heating cabinet (501) below, and its bottom is provided with discharging opening (508).
2. highway waste asphalt according to claim 1 rejects regeneration integrated construction device, it is characterized in that, described heating cabinet (501) is coil heats case, be provided with filter screen (507) bottom it, the rod (505) that pulverizes moved around in passageway (506) driven by motor (504) is arranged on filter screen (507) top.
3. highway waste asphalt according to claim 1 rejects regeneration integrated construction device, it is characterized in that, described spring-backed quill (303) is divided into outer tube (3032) and interior pipe (3035), be provided with limited block (3033) in described outer tube (3032), interior pipe (3035) to penetrate in outer tube (3032) and is provided with spring (3034) between its top and limited block (3033); Wire rope (3031) is wrapped in above wheel unit (304), and penetrates outer tube (3032) and be connected with interior pipe (3035).
4. highway waste asphalt according to claim 1 rejects regeneration integrated construction device, and it is characterized in that, described conveyer belt (305) discharge end is also provided with weighing device.
5. highway waste asphalt according to claim 1 rejects regeneration integrated construction device, it is characterized in that, also comprise virgin material storage bin (8) and generator (4), both are arranged on car body (1), described generator (4) and cutter sweep (2), conveyer (3) and regenerate between construction equipment (5) and be connected electric power system respectively.
6. reject regeneration integrated construction device according to the highway waste asphalt in claim 1-5 described in any one, it is characterized in that, described car body (1) is electricity energy driven vehicle.
CN201420752409.4U 2014-12-05 2014-12-05 Highway waste asphalt rejects regeneration integrated construction device Expired - Fee Related CN204311331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420752409.4U CN204311331U (en) 2014-12-05 2014-12-05 Highway waste asphalt rejects regeneration integrated construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420752409.4U CN204311331U (en) 2014-12-05 2014-12-05 Highway waste asphalt rejects regeneration integrated construction device

Publications (1)

Publication Number Publication Date
CN204311331U true CN204311331U (en) 2015-05-06

Family

ID=53133655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420752409.4U Expired - Fee Related CN204311331U (en) 2014-12-05 2014-12-05 Highway waste asphalt rejects regeneration integrated construction device

Country Status (1)

Country Link
CN (1) CN204311331U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480842A (en) * 2014-12-05 2015-04-01 熊达煜 Highway waste asphalt removing and regenerating construction integrated device and construction method thereof
CN108103891A (en) * 2017-12-15 2018-06-01 佛山市万良商贸有限公司 A kind of pitch regenerating unit for highway construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480842A (en) * 2014-12-05 2015-04-01 熊达煜 Highway waste asphalt removing and regenerating construction integrated device and construction method thereof
CN108103891A (en) * 2017-12-15 2018-06-01 佛山市万良商贸有限公司 A kind of pitch regenerating unit for highway construction

Similar Documents

Publication Publication Date Title
CN104480842B (en) Highway waste asphalt is rejected regeneration integrated construction device and construction method thereof
CN106238159B (en) A kind of stable type electrokinetic cell disintegrating machine
CN105696448A (en) Integrated asphalt road surface planing and milling repair vehicle
CN204311331U (en) Highway waste asphalt rejects regeneration integrated construction device
CN201864013U (en) Garbage collection device of garbage salvage ship
CN105714660B (en) Highway waste asphalt rejects regeneration integrated construction device and its construction method
CN105672107B (en) Highway waste asphalt rejects regeneration integrated construction device and its construction method
CN105714651B (en) Highway waste asphalt rejects regeneration integrated construction device and its construction method
CN201605514U (en) Sand heating spreading vehicle
CN108166369A (en) A kind of highway discards pitch and rejects regeneration constructing device
CN103435285B (en) A kind of concrete recycle recycling integrated vehicle
CN105696439B (en) Highway waste asphalt rejects regeneration integrated construction device and its construction method
CN107685407A (en) A kind of pretreatment unit for junked tire recovery
CN204294717U (en) A kind of lithium battery pole piece die-cutting device
CN204160660U (en) Huge waste and used rubber tyre dicer
CN207711169U (en) A kind of rainwater water storage module burr removing device
CN203188168U (en) Microwave ice removing vehicle
CN204435192U (en) A kind of highway asphalt is removed and is repaved dress construction equipment
CN204308133U (en) Cast used sand reclaims screening plant
CN204753338U (en) Bituminous paving paver
CN205100076U (en) Hand -held PLC control multichannel face hybrid machine of repairing roads
CN202626795U (en) In-situ heat regenerating vehicle for bituminous pavement
CN109537424A (en) A kind of municipal works asphalt surface repair apparatus
CN204251990U (en) A kind of squash type flexible pavement milling material crushing and screening device
CN214423117U (en) Asphalt tank for hot in-place recycling milling machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150506

Termination date: 20171205

CF01 Termination of patent right due to non-payment of annual fee