- CN204298722U CN204298722U CN201420748981.3U CN201420748981U CN204298722U CN 204298722 U CN204298722 U CN 204298722U CN 201420748981 U CN201420748981 U CN 201420748981U CN 204298722 U CN204298722 U CN 204298722U
- Authority
- CN
- China
- Prior art keywords
- access bridge
- floating platform
- pontic
- platform
- bank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of floating platform access bridge, it comprises: access bridge pontic, the first end of described access bridge pontic is articulated with bank platform, and the second end of described access bridge pontic is provided with roller, and the second end of described access bridge pontic is erected on floating platform by described roller.The access bridge pontic being articulated with bank platform can rotate along with the lifting of floating platform.The rotation of access bridge pontic can guarantee that its second end is erected on floating platform.Access bridge pontic can be made like this to adapt to the height of different bank platforms.
Description
Technical field
The utility model relates to a kind of building structure, especially a kind of floating platform access bridge.
Background technology
Usually need in the prior art to set up floating platform at the water surface, such as small boat harbour, small-sized pontoon bridge.These floating platforms need to be connected with land so that personnel climb up bank platform usually, but due to the water bodys such as rivers and lakes near bank time the usual depth of water more shallow, floating platform directly cannot be extended to bank.Therefore conveniently people-to-people contacts, need between floating platform and bank, to set up springboard as syndeton.In prior art, springboard is erected on bank and floating platform usually, when floating platform with water level rise floating moving up and down time springboard have the hidden danger of landing.
Utility model content
The utility model provides a kind of floating platform access bridge, and this floating platform access bridge can avoid the syndeton between existing suspension and bank platform cannot provide the problem of stable support when floating platform fluctuates.
The technical solution of the utility model comprises a kind of floating platform access bridge, it comprises: access bridge pontic, the first end of described access bridge pontic is articulated with bank platform, and the second end of described access bridge pontic is provided with roller, and the second end of described access bridge pontic is erected on floating platform by described roller.
The utility model floating platform access bridge improves further and is: the bridge floor of described access bridge pontic is equipped with checkered steel plate.
The utility model floating platform access bridge improves further and is: described floating platform is provided with the sliding support for described sliding with rolling wheels.
The utility model floating platform access bridge improves further and is: described sliding support is the gathering sill matched with described roller.
The utility model floating platform access bridge improves further and is: the first end of described access bridge pontic is hinged with First Transition cover plate, and the edge of described First Transition cover plate is erected on the upper surface of described bank platform.
The utility model floating platform access bridge improves further and is: the second end of described access bridge pontic is hinged with the second transition cover plate, and the edge of described second transition cover plate is erected on the upper surface of described floating platform.
The utility model floating platform access bridge improves further and is: the flat edge of table in described bank is recessed to form pivoting support installed surface downwards, described pivoting support installed surface is lower than the upper surface of described bank platform, described pivoting support installed surface is provided with pivoting support, and described access bridge pontic is articulated with described bank platform by described pivoting support.
The utility model floating platform access bridge improves further and is: described access bridge pontic both sides are provided with guardrail.
The technical solution of the utility model has following technique effect: the access bridge pontic being articulated with bank platform can rotate along with the lifting of floating platform.The rotation of access bridge pontic can guarantee that its second end is erected on floating platform.Access bridge pontic can be made like this to adapt to the height of different bank platforms.
Accompanying drawing explanation
Fig. 1 is the side view of the utility model floating platform access bridge;
Fig. 2 is the side view of the sliding support of the utility model floating platform access bridge.
Detailed description of the invention
Below by way of specific instantiation, embodiment of the present utility model is described, those skilled in the art the content disclosed by this description can understand other advantages of the present utility model and effect easily.The utility model can also be implemented or be applied by detailed description of the invention different in addition, and the every details in this description also can based on different viewpoints and application, carries out various modification or change not deviating under spirit of the present utility model.
It should be noted that, structure, ratio, size etc. that this description institute accompanying drawings illustrates, content all only in order to coordinate description to disclose, understand for person skilled in the art scholar and read, and be not used to limit the enforceable qualifications of the utility model, therefore the not technical essential meaning of tool, the adjustment of the modification of any structure, the change of proportionate relationship or size, do not affecting under effect that the utility model can produce and the object that can reach, all should still drop in scope that technology contents that the utility model discloses contains.Simultaneously, quote in this description as " on ", D score, "left", "right", " centre " and " one " etc. term, also only for ease of understanding of describing, and be not used to limit the enforceable scope of the utility model, the change of its relativeness or adjustment, under changing technology contents without essence, when being also considered as the enforceable category of the utility model.
Fig. 1 is the utility model floating platform access bridge side view in a first embodiment.As shown in Figure 1, floating platform access bridge of the present utility model comprises: access bridge pontic 10.The first end 11 of access bridge pontic 10 is articulated with bank platform 20.Second end 12 of access bridge pontic 10 is provided with roller 13, and access bridge pontic 10 is erected on floating platform 30 by roller 13.
Access bridge pontic 10 is made up of steel construction.The bridge floor of access bridge pontic 10 is equipped with checkered steel plate, and the laying of checkered steel plate can improve the non-skid property of access bridge pontic 10.In the both sides of access bridge pontic 10 upper surface, guardrail is installed.
The edge of bank platform 20 is recessed to form pivoting support installed surface 21 downwards, and pivoting support installed surface 21 is lower than the upper surface of bank platform 20.Pivoting support installed surface 21 is provided with pivoting support 22, and the first end 11 of access bridge pontic 10 is articulated with bank platform 20 by pivoting support 22.Also be hinged with First Transition cover plate 14 at the first end 11 of access bridge pontic 10, the edge of First Transition cover plate 14 is erected on the upper surface of bank platform 20.First Transition cover plate 14 is for covering the junction between access bridge pontic 10 and bank platform 20.
Figure 2 shows that the side view of the sliding support of the utility model floating platform access bridge.As shown in the figures 1 and 2, roller 13 is installed on the bottom of the second end 12 of access bridge pontic 10, and in the present embodiment, the number of roller 13 is two.Access bridge pontic 10 is erected on the sliding support 31 of the upper surface of floating platform 30 by roller 13.The gathering sill made for channel-section steel of sliding support 31 in the present embodiment.
When floating platform 30 with water level rise floating and move up and down time, the access bridge pontic 10 being articulated with bank platform 20 rotates along pivoting support 22.Along with access bridge pontic 10 rotates around pivoting support 22, the second end 12 of access bridge pontic 10 is slided along sliding support 31 by roller 13.Such access bridge pontic 10 automatically can adjust angle of inclination in floating platform 30 is along with fluctuation in stage change procedure.
The upper surface of floating platform 30 is erected at the edge that the second end 12 of access bridge pontic 10 is also hinged with the second transition cover plate 15, second transition cover plate 15.Arranging of second transition cover plate 15 can block First Transition cover plate 14 for covering the junction between access bridge pontic 10 and floating platform 30.
The technical solution of the utility model has following technique effect: the access bridge pontic being articulated with bank platform can rotate along with the lifting of floating platform.The rotation of access bridge pontic can guarantee that its second end is erected on floating platform.Access bridge pontic can be made like this to adapt to the height of different bank platforms.
The above is only preferred embodiment of the present utility model, not any pro forma restriction is done to the utility model, although the utility model discloses as above with preferred embodiment, but and be not used to limit the utility model, any those skilled in the art, not departing from the scope of technical solutions of the utility model, make a little change when the technology contents of above-mentioned announcement can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be the content not departing from technical solutions of the utility model, according to any simple modification that technical spirit of the present utility model is done above embodiment, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.
Claims (8)
1. a floating platform access bridge, is characterized in that, comprising: access bridge pontic, and the first end of described access bridge pontic is articulated with bank platform, and the second end of described access bridge pontic is provided with roller, and the second end of described access bridge pontic is erected on floating platform by described roller.
2. floating platform access bridge as claimed in claim 1, is characterized in that: the bridge floor of described access bridge pontic is equipped with checkered steel plate.
3. floating platform access bridge as claimed in claim 1, is characterized in that: described floating platform is provided with the sliding support for described sliding with rolling wheels.
4. floating platform access bridge as claimed in claim 3, is characterized in that: described sliding support is the gathering sill matched with described roller.
5. floating platform access bridge as claimed in claim 1, it is characterized in that: the first end of described access bridge pontic is hinged with First Transition cover plate, the edge of described First Transition cover plate is erected on the upper surface of described bank platform.
6. floating platform access bridge as claimed in claim 1, it is characterized in that: the second end of described access bridge pontic is hinged with the second transition cover plate, the edge of described second transition cover plate is erected on the upper surface of described floating platform.
7. floating platform access bridge as claimed in claim 1, it is characterized in that: the flat edge of table in described bank is recessed to form pivoting support installed surface downwards, described pivoting support installed surface is lower than the upper surface of described bank platform, described pivoting support installed surface is provided with pivoting support, and described access bridge pontic is articulated with described bank platform by described pivoting support.
8. floating platform access bridge as claimed in claim 1, is characterized in that: described access bridge pontic both sides are provided with guardrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420748981.3U CN204298722U (en) | 2014-12-03 | 2014-12-03 | Floating platform access bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420748981.3U CN204298722U (en) | 2014-12-03 | 2014-12-03 | Floating platform access bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204298722U true CN204298722U (en) | 2015-04-29 |
Family
ID=53104277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420748981.3U Expired - Fee Related CN204298722U (en) | 2014-12-03 | 2014-12-03 | Floating platform access bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204298722U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104773264A (en) * | 2015-05-06 | 2015-07-15 | 李立群 | Erecting plate for allowing goods to board ship |
CN106835941A (en) * | 2016-12-19 | 2017-06-13 | 中国船舶工业集团公司第七0八研究所 | A kind of springboard structure for connecting pontoon bridge and floating platform |
CN108425316A (en) * | 2018-05-24 | 2018-08-21 | 广州船舶及海洋工程设计研究院(中国船舶工业集团公司第六0五研究院) | Water front edge channel device |
CN109371812A (en) * | 2018-06-22 | 2019-02-22 | 九江精密测试技术研究所 | A kind of new trestle is hooked device |
CN114179972A (en) * | 2021-12-13 | 2022-03-15 | 平湖市华海造船有限公司 | Large-drop reservoir movable wharf boat system |
-
2014
- 2014-12-03 CN CN201420748981.3U patent/CN204298722U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104773264A (en) * | 2015-05-06 | 2015-07-15 | 李立群 | Erecting plate for allowing goods to board ship |
CN106835941A (en) * | 2016-12-19 | 2017-06-13 | 中国船舶工业集团公司第七0八研究所 | A kind of springboard structure for connecting pontoon bridge and floating platform |
CN106835941B (en) * | 2016-12-19 | 2019-07-26 | 中国船舶工业集团公司第七0八研究所 | A kind of springboard structure connecting pontoon bridge and floating platform |
CN108425316A (en) * | 2018-05-24 | 2018-08-21 | 广州船舶及海洋工程设计研究院(中国船舶工业集团公司第六0五研究院) | Water front edge channel device |
CN109371812A (en) * | 2018-06-22 | 2019-02-22 | 九江精密测试技术研究所 | A kind of new trestle is hooked device |
CN109371812B (en) * | 2018-06-22 | 2023-10-20 | 九江精密测试技术研究所 | Novel landing stage is taken and is leaned on device |
CN114179972A (en) * | 2021-12-13 | 2022-03-15 | 平湖市华海造船有限公司 | Large-drop reservoir movable wharf boat system |
CN114179972B (en) * | 2021-12-13 | 2024-04-02 | 平湖市华海造船有限公司 | Movable wharfboat system of large-drop reservoir |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204298722U (en) | Floating platform access bridge | |
CN102191759B (en) | Novel breakwater and design method thereof | |
CN104527935A (en) | Suspension platform with approach bridge and construction method of suspension platform | |
CN204527545U (en) | Floating platform | |
BR112015025577A2 (en) | floating offshore platform, with pontoon-coupled extension plates, for reduced pitching motion | |
CN205711698U (en) | A kind of pontoon bridge | |
CN206384362U (en) | The packaging structure of outdoor machine of air-conditioner | |
CN105292385A (en) | Movable dock boarding ladder | |
CN207958965U (en) | With can folding and unfolding seat garden landscape bridge | |
CN203113850U (en) | Aerial parking space enabling user to park above green belt and being capable of being hidden in off working state | |
CN205076646U (en) | Safe type automatic escalator | |
CN204626330U (en) | A kind of combined type frontier defense bank structure | |
CN205368994U (en) | Asymmetric shelter bridge of building on public road bridge both sides | |
CN203729260U (en) | Large-waterhead passenger terminal structure | |
CN204282158U (en) | Water drainage skid wood floor bolck | |
CN203255941U (en) | Rapid construction special vehicle for large-span overhead working | |
CN206261170U (en) | The collapsible loft shelf of staircase | |
CN206466932U (en) | A kind of elevator lifting device | |
CN204527539U (en) | Rotary boarding ladder | |
CN204567664U (en) | The semi-underground station of platform open type | |
CN203960832U (en) | A kind of 6 leg jacket wellhead platforms | |
CN205743098U (en) | A kind of it is easy to draining and firm durable security personnel sentry box, community | |
CN205894592U (en) | Carwash magic cube ceramic tile | |
CN205819951U (en) | A kind of plank rack | |
CN205475072U (en) | Ecological retaining wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150429 Termination date: 20201203 |