CN204266439U - Based on the novel compositions girder construction of steel-ultra-high performance concrete - Google Patents

Based on the novel compositions girder construction of steel-ultra-high performance concrete Download PDF

Info

Publication number
CN204266439U
CN204266439U CN201420648957.2U CN201420648957U CN204266439U CN 204266439 U CN204266439 U CN 204266439U CN 201420648957 U CN201420648957 U CN 201420648957U CN 204266439 U CN204266439 U CN 204266439U
Authority
CN
China
Prior art keywords
ultra
steel
high performance
concrete
performance concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420648957.2U
Other languages
Chinese (zh)
Inventor
陈宝春
刘君平
徐帅
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201420648957.2U priority Critical patent/CN204266439U/en
Application granted granted Critical
Publication of CN204266439U publication Critical patent/CN204266439U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a kind of novel compositions girder construction based on steel-ultra-high performance concrete, and comprise some girder steels arranged side by side, the top of described girder steel is provided with concrete frange plate.Compound beam frange plate problem of Cracking should effectively can be solved based on the novel compositions girder construction of steel-ultra-high performance concrete, improve the durability of combined beam structure, novel and the good mechanical properties of structure simple structure, material, has good mechanical property and economic benefit.

Description

Based on the novel compositions girder construction of steel-ultra-high performance concrete
Technical field
The utility model relates to technical field of civil, is a kind of novel compositions girder construction based on steel-ultra-high performance concrete.
Background technology
Conventional steel-concrete composite beam is by the structure exposing girder steel or steel truss girder and combined by connector (shear connector) and armored concrete slab, the type bridge is fast with its speed of application, building height is little, the advantages such as anti-seismic performance is good, are widely used in building construction and highway and Urban Bridge Construction.Due to the continuous increase of the traffic volume and heavy vehicle, add the impact of environment, shortly there is the disease problems such as steel concrete wing plate longitudinal cracking, reinforced concrete bridge deck plate Transverse Cracks, bridge deck partial fracture or the corrosion of burn into girder steel in operation in conventional steel-concrete composite beam, has a strong impact on the application life of bridge.Main cause is that common steel concrete (NRC) plate intensity is low, poor toughness, porosity are high, easily occurs damaging, reduce application life under load and environmental activity.Ultra-high performance concrete (UHPC) take fine sand as aggregate, mix a large amount of silicon ash and wait mineral admixture, high efficiency water reducing agent and micro steel fiber, a kind of high strength, high-durability, high tenacity, the closely knit concrete material that are formed, compared with common concrete, eliminate coarse aggregate (stone), be the high performance concrete that fines dense material and fiber reinforced material are composited, compressive strength and tensile strength all will exceed much than common concrete.Although UHPC performance is fine, cost is higher than common concrete a lot, and bridge deck entirely can be very uneconomical with UHPC.
Utility model content
The purpose of this utility model is for above weak point, provide a kind of novel compositions girder construction based on steel-ultra-high performance concrete, improve the durability of compound beam, the novel and good mechanical properties of structure simple structure, material, has good mechanical property and economic benefit.
The scheme that the utility model technical solution problem adopts is, a kind of novel compositions girder construction based on steel-ultra-high performance concrete, is characterized in that: comprise some girder steels arranged side by side, the top of described girder steel is provided with concrete frange plate.
Further, described concrete frange plate comprises the some ordinary concrete precast plates born between two adjacent girder steel tops, the girder steel of the seam crossing between described ordinary concrete precast plate is welded with shear connector, all built ultra-high performance concrete or ordinary concrete in seam between described ordinary concrete precast plate, ultra-high performance concrete surface layer A has been built on described ordinary concrete precast plate top.
Further, described concrete frange plate comprises the some ultra-high performance concrete precast plates born between two adjacent girder steel tops, the girder steel of the seam crossing between described ultra-high performance concrete precast plate is welded with shear connector, all built ordinary concrete layer in the top of described ultra-high performance concrete precast plate and seam, ultra-high performance concrete surface layer B has been built on described ordinary concrete layer top.
Further, described girder steel is regular tenacity steel, high strength steel or superhigh intensity steel.
Further, configuration reinforcement or not configuration reinforcement in described ultra-high performance concrete.
Compared with prior art, the utility model has following beneficial effect: should based on the durability that novel compositions girder construction utilizes the high strength of ultra-high performance concrete, high tenacity significantly improves frange plate of steel-ultra-high performance concrete, effectively can solve steel-concrete composite beam frange plate problem of Cracking, alleviate deadweight, and be combined with ordinary concrete, reach good mechanical property and economic benefit, have a very wide range of applications in the little bridge deck field across footpath bridge and Longspan Bridge prospect especially.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model patent is further illustrated.
Fig. 1 is a kind of example structure schematic diagram of this utility model;
Fig. 2 is the another kind of example structure schematic diagram of this utility model;
In figure:
1-girder steel; 2-ordinary concrete precast plate; 3-ultra-high performance concrete surface layer A; 4-shear connector; 5-ultra-high performance concrete precast plate; 6-ordinary concrete layer; 7-ultra-high performance concrete surface layer B.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is further illustrated.
As shown in Fig. 1 ~ 2, a kind of novel compositions girder construction based on steel-ultra-high performance concrete, is characterized in that: comprise some girder steels 1 arranged side by side, the top of described girder steel 1 is provided with concrete frange plate.
In the present embodiment, described concrete frange plate comprises the some ordinary concrete precast plates 2 born between two adjacent girder steel 1 tops, the girder steel 1 of the seam crossing between described ordinary concrete precast plate 2 is welded with shear connector 4, all built ultra-high performance concrete or ordinary concrete in seam between described ordinary concrete precast plate 2, ultra-high performance concrete surface layer A3 has been built on described ordinary concrete precast plate 2 top.
In the present embodiment, described concrete frange plate comprises the some ultra-high performance concrete precast plates 5 born between two adjacent girder steel 1 tops, the girder steel 1 of the seam crossing between described ultra-high performance concrete precast plate 5 is welded with shear connector 4, all built ordinary concrete layer 6 in the top of described ultra-high performance concrete precast plate 5 and seam, ultra-high performance concrete surface layer B7 has been built on described ordinary concrete layer 6 top.
In the present embodiment, described girder steel 1 is regular tenacity steel, high strength steel or superhigh intensity steel.
In the present embodiment, configuration reinforcement or not configuration reinforcement in described ultra-high performance concrete.
Specific implementation process: first, ordinary concrete precast plate 2 first placed by some two adjacent girder steels 1 side by side, the girder steel 1 upper weld shear connector 4 of the seam crossing then between ordinary concrete precast plate 2, all build one deck ultra-high performance concrete or ordinary concrete in seam again between ordinary concrete precast plate 2, finally build one deck ultra-high performance concrete surface layer A3 on the top of ordinary concrete precast plate 2.Another kind of combined beam structure is first place ultra-high performance concrete precast plate 5 on some two adjacent girder steels 1 side by side, the girder steel 1 upper weld shear connector 4 of the seam crossing then between ultra-high performance concrete precast plate 5, ordinary concrete layer 6 is all built again, finally cast-in-place one deck ultra-high performance concrete surface layer B on ordinary concrete layer 6 in the top and seam of ultra-high performance concrete precast plate 5.
Above-listed preferred embodiment; the purpose of this utility model, technical scheme and advantage are further described; be understood that; the foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (5)

1. based on a novel compositions girder construction for steel-ultra-high performance concrete, it is characterized in that: comprise some girder steels arranged side by side, the top of described girder steel is provided with concrete frange plate.
2. the novel compositions girder construction based on steel-ultra-high performance concrete according to claim 1, it is characterized in that: described concrete frange plate comprises the some ordinary concrete precast plates born between two adjacent girder steel tops, the girder steel of the seam crossing between described ordinary concrete precast plate is welded with shear connector, all built ultra-high performance concrete or ordinary concrete in seam between described ordinary concrete precast plate, ultra-high performance concrete surface layer A has been built on described ordinary concrete precast plate top.
3. the novel compositions girder construction based on steel-ultra-high performance concrete according to claim 1, it is characterized in that: described concrete frange plate comprises the some ultra-high performance concrete precast plates born between two adjacent girder steel tops, the girder steel of the seam crossing between described ultra-high performance concrete precast plate is welded with shear connector, all built ordinary concrete layer in the top of described ultra-high performance concrete precast plate and seam, ultra-high performance concrete surface layer B has been built on described ordinary concrete layer top.
4. the novel compositions girder construction based on steel-ultra-high performance concrete according to claim 1, is characterized in that: described girder steel is regular tenacity steel, high strength steel or superhigh intensity steel.
5. the novel compositions girder construction based on steel-ultra-high performance concrete according to claim 2,3, is characterized in that: configuration reinforcement or not configuration reinforcement in described ultra-high performance concrete.
CN201420648957.2U 2014-11-04 2014-11-04 Based on the novel compositions girder construction of steel-ultra-high performance concrete Expired - Fee Related CN204266439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420648957.2U CN204266439U (en) 2014-11-04 2014-11-04 Based on the novel compositions girder construction of steel-ultra-high performance concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420648957.2U CN204266439U (en) 2014-11-04 2014-11-04 Based on the novel compositions girder construction of steel-ultra-high performance concrete

Publications (1)

Publication Number Publication Date
CN204266439U true CN204266439U (en) 2015-04-15

Family

ID=52801311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420648957.2U Expired - Fee Related CN204266439U (en) 2014-11-04 2014-11-04 Based on the novel compositions girder construction of steel-ultra-high performance concrete

Country Status (1)

Country Link
CN (1) CN204266439U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104343203A (en) * 2014-11-04 2015-02-11 福州大学 Novel combined beam structure based on steel-ultra-high property concrete
CN106638304A (en) * 2016-12-30 2017-05-10 东南大学 UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof
CN107956205A (en) * 2016-10-17 2018-04-24 重庆大学 A kind of ultra-high performance concrete-normal concrete combined bridge deck
CN114411975A (en) * 2022-02-13 2022-04-29 重庆交通大学 Composite bolt shear key structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104343203A (en) * 2014-11-04 2015-02-11 福州大学 Novel combined beam structure based on steel-ultra-high property concrete
CN107956205A (en) * 2016-10-17 2018-04-24 重庆大学 A kind of ultra-high performance concrete-normal concrete combined bridge deck
CN106638304A (en) * 2016-12-30 2017-05-10 东南大学 UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof
CN106638304B (en) * 2016-12-30 2018-07-17 东南大学 UHPC- normal concretes lamination composite deck plate structure and its construction method
CN114411975A (en) * 2022-02-13 2022-04-29 重庆交通大学 Composite bolt shear key structure
CN114411975B (en) * 2022-02-13 2023-11-07 重庆交通大学 Structure of composite bolting shear key

Similar Documents

Publication Publication Date Title
US10273691B2 (en) Method of constructing a reinforced compound concrete beam containing demolished concrete lumps
CN203768784U (en) Super toughness concrete plate-steel beam light combined bridge structure
CN204266439U (en) Based on the novel compositions girder construction of steel-ultra-high performance concrete
CN104594210A (en) Concrete precast slab and preparation method and application thereof
CN104652210A (en) Assembled concrete traffic pavement and construction method thereof
CN108560419B (en) L-shaped side groove UHPC bridge deck slab in hogging moment area of steel-concrete composite beam and longitudinal connection thereof
CN201635008U (en) Combined bridge floor slab with steel-fiber reinforced composite material and high-strength concrete hollow interlayer
CN101824797A (en) Steel-fiber reinforced composite material high strength concrete hollow interlayer combination bridge deck
CN103086668A (en) Design method for mixing ratio of C60-grade pumping self-compacting steel tube recycled concrete
CN105401519A (en) Anti-knocking steel box beam bridge deck paving structure and paving method
CN104343203A (en) Novel combined beam structure based on steel-ultra-high property concrete
CN112227199B (en) Toughness combined bridge deck plate composed of cold-bending Z-shaped steel
CN112227200B (en) Non-stud toughness combined bridge deck system
CN112195778B (en) Toughness combination bridge deck plate composed of T-shaped steel
CN204703351U (en) A kind of concrete combined beam structure
CN204475099U (en) A kind of assembly concrete traffic
Chen et al. Application of ultra-high performance concrete in bridge engineering in China
CN107620254A (en) Main span span centre region uses the hybrid combining beam bridge of steel lightweight concrete
CN104314001B (en) Regeneration concrete band U rib dumbbell shape columnar piers
CN207958968U (en) A kind of ultra-high performance concrete and regular reinforcement concrete combination beam
CN201212126Y (en) Reinforced concrete lining masonry combined main arch ring bridge
CN208777519U (en) A kind of high-strength profiled sheet-fiber reinforcement regeneration concrete compoboard
CN104328735B (en) Regeneration concrete Z-type pier stud
CN112921802A (en) Profiled steel sheet-ultra-high toughness concrete combined bridge deck
CN104294754B (en) T-shaped section steel pipe regeneration concrete pier shaft

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

Termination date: 20171104