CN204265868U - Electrolyzer installs location tool set - Google Patents

Electrolyzer installs location tool set Download PDF

Info

Publication number
CN204265868U
CN204265868U CN201420671399.1U CN201420671399U CN204265868U CN 204265868 U CN204265868 U CN 204265868U CN 201420671399 U CN201420671399 U CN 201420671399U CN 204265868 U CN204265868 U CN 204265868U
Authority
CN
China
Prior art keywords
electrolyzer
bolt
longitudinal
sidewall
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420671399.1U
Other languages
Chinese (zh)
Inventor
刘洋
丁诚
汪建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TONGLING NONFERROUS METALS GROUP TONGGUAN CONSTRUCTION INSTALLATION Co Ltd
Original Assignee
TONGLING NONFERROUS METALS GROUP TONGGUAN CONSTRUCTION INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TONGLING NONFERROUS METALS GROUP TONGGUAN CONSTRUCTION INSTALLATION Co Ltd filed Critical TONGLING NONFERROUS METALS GROUP TONGGUAN CONSTRUCTION INSTALLATION Co Ltd
Priority to CN201420671399.1U priority Critical patent/CN204265868U/en
Application granted granted Critical
Publication of CN204265868U publication Critical patent/CN204265868U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of electrolyzer and location tool set is installed, comprise concrete bottom beam, described concrete bottom beam is provided with reference starting point mark, altitude scale vertical rod and unwrapping wire scale back timber, described altitude scale bottom of upright rod is provided with the grip slipper coordinating described concrete bottom beam; Strongback mark mould, comprise the sidewall surrounding rectangle, described sidewall is divided into two that arrange in opposite directions and two longitudinal side walls arranged in opposite directions, two described lateral sidewalls is provided with two horizontal marking notches, two described longitudinal side walls is provided with longitudinal center's notches for wire; With stainless steel base plate mark mould, comprise the scribing plate being provided with horizontal setting-out groove and longitudinal setting-out groove, described scribing plate is also provided with two bolt positioning holes.The utility model can be located accurately for providing when building and install the electrolyzer of the larger arranged of number, and ensures the accuracy of electrolyzer strongback installation site.

Description

Electrolyzer installs location tool set
Technical field
The utility model relates to a kind of electrolyzer and installs location tool set, belongs to electrolyzer and installs orientation tool technical field.
Background technology
In Copper making process application, the electrolyzer of a large amount of arranged is installed at potroom usually, be provided with the driving of coding-belt location above electrolyzer, driving fitted underneath in coding-belt location has the frame suspension bracket of band frequency variable synchronous suspension hook in order to capture electrolysis copper bar, to meet the needs of High-efficient Production.Therefore require east-west in every electrolyzer spacing unified, error control is in ± 2 millimeters, and East West must not have progressive error, and total length scale error controls in ± 4 millimeters; Arrest framework because of coding-belt and large carriage walking is all designed to coincide along three-dimensional x, y, z axle weight axial run, therefore also require that north-south cell arrangement is parallel to power house north-south axis, required angle error control is in 2 millimeters.The total area that the construction of above-mentioned electrolyzer matrix not only relates to is large, and require that the position fine height of each electrolyzer is high, once there is deviation in the installation site of indivedual electrolyzer, by the overall operation effect of influence matrix electrolyzer, rework cost is high, therefore need to design a set of effective instrument auxiliary construction, to reduce the probability of constructing and doing over again.
Need, at four angles place of electrolyzer end face, strongback and pilot pin are precisely installed simultaneously, corresponding strongback and pilot pin groove are set in the bottom surface of frame suspension bracket, to ensure the precision capturing operation, usual pilot pin is arranged at the diagonal angle place of electrolyzer end face, and diagonal lines error needs to control within 2 millimeters, therefore need to provide a set of effective technical scheme to ensure the accuracy of electrolyzer strongback installation site.
Utility model content
The utility model is just for the deficiency that prior art exists, there is provided a kind of electrolyzer that location tool set is installed, can locate accurately for providing when building and install the electrolyzer of the larger arranged of number, and ensure the accuracy of electrolyzer strongback installation site, meet actual operation requirements.
For solving the problem, technical solution adopted in the utility model is as follows:
A kind of electrolyzer installs location tool set, comprising:
Be arranged at the concrete bottom beam at electrolyzer two ends, described concrete bottom beam be provided with reference starting point mark;
Be arranged at the pay off rack on described concrete bottom beam, described pay off rack comprises altitude scale vertical rod and unwrapping wire scale back timber, described altitude scale bottom of upright rod is provided with the grip slipper coordinating described concrete bottom beam, described altitude scale vertical rod top is provided with the first vertical screw slideway and the second vertical screw slideway, and the described first vertical screw slideway and the vertical conllinear of the described second vertical screw slideway, described unwrapping wire scale back timber is provided with the level height adjusting bolt coordinating the described first vertical screw slideway, and be provided with strengthening vertical beam bottom unwrapping wire scale back timber, and described strengthening vertical beam is positioned at below described level height adjusting bolt, described strengthening vertical beam is provided with the strengthening vertical bolt coordinating the described second vertical screw slideway,
Strongback mark mould, described strongback mark mould comprises the sidewall surrounding rectangle, described sidewall is divided into two that arrange in opposite directions and two longitudinal side walls arranged in opposite directions, two described lateral sidewalls are provided with two horizontal marking notches, two described longitudinal side walls are provided with longitudinal center's notches for wire;
With stainless steel base plate mark mould, described stainless steel base plate mark mould comprises the scribing plate being provided with horizontal setting-out groove and longitudinal setting-out groove, one lateral sidewalls of described horizontal setting-out groove overlaps with horizontal marking, one longitudinal side wall of described longitudinal setting-out groove overlaps with longitudinal cenlerline, described scribing plate is also provided with two bolt positioning holes, two described bolt positioning hole lateral arrangement.
As the improvement of technique scheme, described grip slipper comprises the mounting base being fixedly welded in described altitude scale bottom of upright rod, fixed clamp sidewall and activity clamp sidewall, described fixed clamp sidewall is fixedly welded on described mounting base, described activity clamping sidewall upper is welded with angle steel, described angle steel one side is provided with horizontal adjustment bolt, another side of described angle steel is provided with position standing bolt, described mounting base is provided with the horizontal adjustment screw slideway coordinating described horizontal adjustment bolt, described activity clamp sidewall is provided with the position fixing threaded hole coordinating described position standing bolt.
Compared with prior art, implementation result of the present utility model is as follows for the utility model:
Electrolyzer described in the utility model installs location tool set, first recorded by instruments such as infrared distance measurements and throw in several reference starting point, refer again to reference starting point accurately to locate with the installation site of pay off rack to single electrolyzer, avoid progressive error, can locate accurately for providing when building and install the electrolyzer of the larger arranged of number, ensure that overall installation quality and improve efficiency, reducing the probability of constructing and doing over again; In addition, unified mould is adopted to carry out graticule installation to strongback, thus reduce the requirement on machining accuracy of strongback and installation component thereof, and avoid the impact of working accuracy error on setting accuracy, reduce processing and the add up error of installing, and be convenient to determine installation site rapidly and accurately, strongback is regulated, thus improve installation exercise efficiency, enable the precision of strongback installation site meet the crawl job requirements of coding-belt location driving.
Accompanying drawing explanation
Fig. 1 is the electrolyzer integral construction structural representation described in specific embodiment;
Fig. 2 is the schematic diagram that electrolyzer and coding-belt locate the frame suspension bracket cooperating of below of driving a vehicle;
Fig. 3 is the structure for amplifying schematic diagram at A place in Fig. 2;
Fig. 4 is the structure for amplifying schematic diagram at B place in Fig. 3;
Fig. 5 is concrete bottom beam described in the utility model and pay off rack one-piece construction schematic diagram;
Fig. 6 is the main TV structure schematic diagram of pay off rack described in the utility model;
Fig. 7 is pay off rack side-looking structural representation described in the utility model;
Fig. 8 is pay off rack plan structure schematic diagram described in the utility model;
Fig. 9 is strongback described in the utility model mark mould structure schematic diagram;
Figure 10 is stainless steel base plate described in the utility model mark mould structure schematic diagram.
Embodiment
Below in conjunction with specific embodiments content of the present utility model is described.
As shown in Figure 1, between matrix cell arrangement Fen Dong, two system regions, west, four row eight row are had to amount to three twelves between each system region interval, each unit interval is arranged side by side with 18 electrolyzers, therefore east, two, west have 64 unit intervals between system region, add up to 1152 electrolyzers; Intelligently encoding band 5 precise positionings of driving a vehicle are adopted to capture electrolysis copper bars between east, system region, two, west respectively.
As shown in Figures 2 to 4, sidewall end face four angles place of electrolyzer 6 is provided with two strongbacks 61 and two pilot pins 62, and two strongbacks 61 and two pilot pins 62 diagonal position all each other, wherein pilot pin 62 can be considered as being provided with the strongback 61 that top is the positioning convex of taper, four angles, bottom place of frame suspension bracket is provided with the strongback 51 corresponding with strongback 61 and pilot pin 62 position and pilot pin groove 52, in order to ensure that the strongback 61 on electrolyzer 6 sidewall end face can be installed exactly, guarantee that coding-belt location driving can operation smoothly, the mounting structure of strongback 61 comprises a pair pre-embedded bolt 63 being arranged at electrolyzer 6 sidewall end face four angles place, electrolyzer 6 sidewall end face four angles place is provided with stainless steel base plate 64, stainless steel base plate 64 is provided with the pre-embedded bolt hole 641 coordinating pre-embedded bolt, and stainless steel base plate 64 is provided with a pair standing bolt 642, strongback 61 is provided with the fixed bolt hole 611 coordinating standing bolt 642, pre-embedded bolt hole 641 and fixed bolt hole 611 are strip slot, stainless steel base plate 64 and strongback 61 is made to have certain activity space, then stainless steel base plate 64 position is made accurately to be installed to electrolyzer 6 end face by following stainless steel base plate mark mould, by strongback mark mould, strongback 61 position is accurately installed on stainless steel base plate 64 again.
As shown in Fig. 5 to Figure 10, for electrolyzer described in the utility model installs the complete tool construction schematic diagram in location.Electrolyzer described in the utility model installs location tool set, comprising:
Be arranged at the concrete bottom beam 1 at electrolyzer two ends, described concrete bottom beam 1 be provided with reference starting point mark;
Be arranged at the pay off rack on described concrete bottom beam 1, described pay off rack comprises altitude scale vertical rod 2 and unwrapping wire scale back timber 3, the grip slipper coordinating described concrete bottom beam 1 is provided with bottom described altitude scale vertical rod 2, described altitude scale vertical rod 2 top is provided with the first vertical screw slideway 21 and the second vertical screw slideway 22, and the described first vertical screw slideway 21 and the described second vertical screw slideway 22 vertically conllinear, described unwrapping wire scale back timber 3 is provided with the level height adjusting bolt 31 coordinating the described first vertical screw slideway 21, and be provided with strengthening vertical beam 32 bottom unwrapping wire scale back timber 3, and described strengthening vertical beam 32 is positioned at below described level height adjusting bolt 31, described strengthening vertical beam 32 is provided with the strengthening vertical bolt 33 coordinating the described second vertical screw slideway 22,
Described grip slipper comprises the mounting base 41 be fixedly welded in bottom described altitude scale vertical rod 2, fixed clamp sidewall 42 and activity clamp sidewall 43, described fixed clamp sidewall 42 is fixedly welded on described mounting base 41, described activity clamp sidewall 43 upper end is welded with angle steel 44, described angle steel 44 1 side is provided with horizontal adjustment bolt 45, described another side of angle steel 44 is provided with position standing bolt 46, described mounting base 41 is provided with the horizontal adjustment screw slideway 411 coordinating described horizontal adjustment bolt 45, described activity clamp sidewall 43 is provided with the position fixing threaded hole 431 coordinating described position standing bolt 46,
Strongback mark mould, described strongback mark mould comprises the sidewall 32 surrounding rectangle, described sidewall 32 is divided into two lateral sidewalls 321 arranged in opposite directions and two longitudinal side walls 322 arranged in opposite directions, two described lateral sidewalls 321 are provided with on two horizontal marking notches, 33, two described longitudinal side walls 322 and are provided with longitudinal center's notches for wire 34;
With stainless steel base plate mark mould, described stainless steel base plate mark mould comprises the scribing plate 41 being provided with horizontal setting-out groove 42 and longitudinal setting-out groove 43, one lateral sidewalls of described horizontal setting-out groove 42 overlaps with horizontal marking 91, one longitudinal side wall of described longitudinal setting-out groove 43 overlaps with longitudinal cenlerline 92, described scribing plate 41 is also provided with described bolt positioning hole 44 lateral arrangement of two bolt positioning holes 44, two.
Pay off rack principle of work described in the utility model is: first recorded by instruments such as infrared distance measurements on concrete bottom beam 1 and throw in several reference starting point, embed stainless steel to identify as reference starting point at reference starting point place, the installation site of each unit interval is accurately fixed, then using the unit interval of four row four lines as one group, pay off rack is installed, the scale initiating terminal of described unwrapping wire scale back timber 3 to be identified with reference starting point by plummet and aligns, the height of unwrapping wire scale back timber 3 is regulated by level height adjusting bolt 31, make it to control within 2 millimeters with the difference of altitude of electrolyzer end face, thus the reading error reduced because sight angle problem causes, then unwrapping wire scale back timber 3 is fixed by strengthening vertical beam 32, and make unwrapping wire scale back timber 3 keep vertical with altitude scale vertical rod 2, draw along the length direction of electrolyzer at the cutting scale mouth place of described unwrapping wire scale back timber 3 and establish steel wire, to ensure that the spacing of each electrolyzer is equal to, and progressive error is minimized.Above-mentioned operation can make often row 144 electrolyzer overall size error amounts control in allowed band, and the angle difference of often row eight electrolyzers is controlled, and ensure that overall installation quality and improves efficiency.
During strongback 61 installation exercise, with reference to the scale of described unwrapping wire scale back timber 3, horizontal marking 91 and longitudinal cenlerline 92 is drawn at electrolyzer 6 end face, then on stainless steel base plate 64, horizontal marking 91 and longitudinal cenlerline 92 is drawn by stainless steel base plate mark mould, the horizontal marking 91 of the horizontal marking 91 on stainless steel base plate 64 and longitudinal cenlerline 92 and electrolyzer 6 end face and longitudinal cenlerline 92 are alignd, and then coordinates pre-embedded bolt 63 to fix stainless steel base plate 64 by pre-embedded bolt hole 641; And then on strongback 61, mark out horizontal marking 91 and longitudinal cenlerline 92 by strongback mark mould, and align with the horizontal marking 91 on stainless steel base plate 64 and longitudinal cenlerline 92, coordinate standing bolt 642 to be installed to exactly on stainless steel base plate 64 strongback 61 position by fixed bolt hole 611.
Above content is in conjunction with specific embodiments to the detailed description that the utility model is done, and can not assert that the utility model is specifically implemented to be only limitted to these explanations.For the utility model person of ordinary skill in the field, without departing from the concept of the premise utility, some simple deduction or replace can also be made, all should be considered as the scope belonging to the utility model protection.

Claims (2)

1. electrolyzer installs a location tool set, it is characterized in that, comprising:
Be arranged at the concrete bottom beam (1) at electrolyzer two ends, described concrete bottom beam (1) be provided with reference starting point mark;
Be arranged at the pay off rack on described concrete bottom beam (1), described pay off rack comprises altitude scale vertical rod (2) and unwrapping wire scale back timber (3), described altitude scale vertical rod (2) bottom is provided with the grip slipper coordinating described concrete bottom beam (1), described altitude scale vertical rod (2) top is provided with the first vertical screw slideway (21) and the second vertical screw slideway (22), and the described first vertical screw slideway (21) and the described second vertical screw slideway (22) vertically conllinear, described unwrapping wire scale back timber (3) is provided with the level height adjusting bolt (31) coordinating the described first vertical screw slideway (21), and unwrapping wire scale back timber (3) bottom is provided with strengthening vertical beam (32), and described strengthening vertical beam (32) is positioned at described level height adjusting bolt (31) below, described strengthening vertical beam (32) is provided with the strengthening vertical bolt (33) coordinating the described second vertical screw slideway (22),
Strongback mark mould, described strongback mark mould comprises the sidewall (32) surrounding rectangle, described sidewall (32) is divided into two lateral sidewalls (321) arranged in opposite directions and two longitudinal side walls (322) arranged in opposite directions, two described lateral sidewalls (321) are provided with two horizontal marking notches (33), two described longitudinal side walls (322) are provided with longitudinal center's notches for wire (34);
With stainless steel base plate mark mould, described stainless steel base plate mark mould comprises the scribing plate (41) being provided with horizontal setting-out groove (42) and longitudinal setting-out groove (43), one lateral sidewalls of described horizontal setting-out groove (42) overlaps with horizontal marking (91), one longitudinal side wall of described longitudinal setting-out groove (43) overlaps with longitudinal cenlerline (92), described scribing plate (41) is also provided with two bolt positioning holes (44), two described bolt positioning hole (44) lateral arrangement.
2. electrolyzer as claimed in claim 1 installs location tool set, it is characterized in that, described grip slipper comprises the mounting base (41) being fixedly welded in described altitude scale vertical rod (2) bottom, fixed clamp sidewall (42) and activity clamp sidewall (43), described fixed clamp sidewall (42) is fixedly welded on described mounting base (41), described activity clamp sidewall (43) upper end is welded with angle steel (44), described angle steel (44) side is provided with horizontal adjustment bolt (45), described angle steel (44) another side is provided with position standing bolt (46), described mounting base (41) is provided with the horizontal adjustment screw slideway (411) coordinating described horizontal adjustment bolt (45), described activity clamp sidewall (43) is provided with the position fixing threaded hole (431) coordinating described position standing bolt (46).
CN201420671399.1U 2014-11-12 2014-11-12 Electrolyzer installs location tool set Expired - Fee Related CN204265868U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420671399.1U CN204265868U (en) 2014-11-12 2014-11-12 Electrolyzer installs location tool set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420671399.1U CN204265868U (en) 2014-11-12 2014-11-12 Electrolyzer installs location tool set

Publications (1)

Publication Number Publication Date
CN204265868U true CN204265868U (en) 2015-04-15

Family

ID=52800746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420671399.1U Expired - Fee Related CN204265868U (en) 2014-11-12 2014-11-12 Electrolyzer installs location tool set

Country Status (1)

Country Link
CN (1) CN204265868U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106975884A (en) * 2017-05-31 2017-07-25 中国十九冶集团有限公司 Welding fixture for electrolytic bath head

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106975884A (en) * 2017-05-31 2017-07-25 中国十九冶集团有限公司 Welding fixture for electrolytic bath head

Similar Documents

Publication Publication Date Title
CN203783165U (en) Multi-directional accurate adjusting device for embedded part
CN105177625B (en) A kind of method that electrolytic cell changes anode
CN208419973U (en) A kind of measuring tool of track installation adjustment
CN201593953U (en) Multifunctional lead box locating rule
CN204024092U (en) Novel shaped steel post locating component
CN110836019A (en) Novel lattice column verticality positioner
CN103737235B (en) Case beam dividing plate positioning tool and localization method
CN103925862A (en) Installation adjustment method for RH finery lifting frame guide rails
CN204265868U (en) Electrolyzer installs location tool set
CN103499275B (en) Automatic detection system for concentricity
CN204263075U (en) Setting-out mould installed by electrolytic cell location-plate
CN204530480U (en) Faulting of slab ends adjusting device
CN204265869U (en) Electrolyzer location and installation pay off rack
CN203180383U (en) Mechanism case installation special device
CN212516334U (en) Electric power warning sign convenient to adjust
CN210440920U (en) Fixing device of electric power undercut tunnel measuring instrument
CN209637163U (en) A kind of out-hung panel keel of assembled architecture
CN208276888U (en) A kind of device for the quick accurate integral marking of transverse and longitudinal beam
CN110306814A (en) A kind of shock isolating pedestal installation locating rack
CN103128474B (en) Tower crane boom tool
CN203066490U (en) Limiting device of steel structure truss
CN203734598U (en) Photovoltaic bracket mounting device
CN207163445U (en) A kind of horizon rule device with accurate measurement perpendicularity function
CN205637632U (en) Special instrument holder is rectified in installation of shaped steel post
CN105397316B (en) A kind of pole positioning device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

Termination date: 20161112