CN204225818U - Novel dredging, scraping wall one operation drift size gauge tool and working string - Google Patents

Novel dredging, scraping wall one operation drift size gauge tool and working string Download PDF

Info

Publication number
CN204225818U
CN204225818U CN201420578297.5U CN201420578297U CN204225818U CN 204225818 U CN204225818 U CN 204225818U CN 201420578297 U CN201420578297 U CN 201420578297U CN 204225818 U CN204225818 U CN 204225818U
Authority
CN
China
Prior art keywords
size gauge
gauge tool
drift size
cylindrical shell
guide shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420578297.5U
Other languages
Chinese (zh)
Inventor
史小平
李军
蔡伟
史军社
唐军刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoji Ruitong Energy Technology Co.,Ltd.
Original Assignee
BAOJI RUITONG OILFIELD MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAOJI RUITONG OILFIELD MACHINERY Co Ltd filed Critical BAOJI RUITONG OILFIELD MACHINERY Co Ltd
Priority to CN201420578297.5U priority Critical patent/CN204225818U/en
Application granted granted Critical
Publication of CN204225818U publication Critical patent/CN204225818U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to novel dredging, scraping wall integrally operation drift size gauge tool and the working string in a kind of petroleum drilling and mining equipment, and it has the cylindrical shell of a top with connecting thread, below opening, and cylindrical shell top is connected with fittings body by connecting thread; A hollow section is housed as guide shoe in the middle of cylindrical shell, and cylindrical shell bottom is enclosed within the step of guide shoe bottom, cylindrical shell top is connected with fittings body.The novel dredging, scraping wall one working string that drift size gauge tool described in utilization is made, it is connected with hydraulic pressure wall scraper by sliding sleeve switch and forms on the fittings body of described novel dredging, scraping wall one operation drift size gauge tool.The utility model, due to the drift size gauge tool with bypass circulation canal of original creation, from the annular circulation between drift size gauge tool external diameter and casing inner diameter, can also form new circulation canal from the annular space between drift size gauge tool and guide shoe.In addition can with All-in-One operation hydraulic pressure wall scraper with the use of, preferably resolve the problem of easy bit freezing common drift size gauge tool combines institutional operation during with wall scraper.

Description

Novel dredging, scraping wall one operation drift size gauge tool and working string
Technical field
The utility model belongs to crude oil and natural gas extraction equipment manufacturing technical field.
Background technology
Drifting is the inspection to hole diameter, by drift size gauge tool drifting, understands pit shaft and whether can enter various downhole tool in smooth unobstructed underground, be one the most directly, pit shaft detection means simply and easily.Drifting not only can remove the solid matter that internal surface of sleeve pipe adheres to, cement etc. as residual in slag, burr, well cementation, can also check run through casing size and distortion, breakage.Conventional drift size gauge tool (structure as shown in Figure 1) is the thin-wall barrel of a top with connecting thread, below opening, due to cylindrical shell external diameter and internal surface of sleeve pipe gap very little, cause the mud circulation situation in drifting process not so good, if use conventional wall scraper and conventional drift size gauge tool to carry out integration of operation, when drift size gauge tool does not verify downhole conditions, wall scraper foreign material scraped in process of going into the well are easy to will be stuck in the narrow gap between drift size gauge tool and sleeve pipe and cause lock of tool drilling.
The fouls such as the iron oxide that casing scraper produces after can be used for removing the cement block remained on internal surface of sleeve pipe, cement sheath, hard wax, various saline crystallization or deposit, perforation burrs and sleeve pipe corrosion, so that unblocked underground enters various downhole tool.
Conventional dredging, scraping wall operation is two kinds of different operation techniques, needs two kinds of instruments to go into the well respectively and once just can complete above two kinds of operation techniques.
Summary of the invention
The utility model object is a kind of novel dredging, scraping wall one operation drift size gauge tool of design and working string, to reduce oil extraction cost, improves operating efficiency.
Specifically, novel dredging, scraping wall one operation drift size gauge tool, have the cylindrical shell of a top with connecting thread, below opening, cylindrical shell top is connected with fittings body by connecting thread; A hollow section is housed as guide shoe in the middle of cylindrical shell, and cylindrical shell bottom is enclosed within the step of guide shoe bottom, cylindrical shell top is connected with fittings body.
The novel dredging, scraping wall one working string that drift size gauge tool described in utilization is made, it is connected with hydraulic pressure wall scraper by sliding sleeve switch and forms on the fittings body of described novel dredging, scraping wall one operation drift size gauge tool.
The drift size gauge tool with bypass circulation canal of the utility model owing to creating, except from the annular circulation between drift size gauge tool external diameter and casing inner diameter, can forming new circulation canal from the annular space between drift size gauge tool and guide shoe.In addition, this drift size gauge tool and All-in-One operation hydraulic pressure wall scraper with the use of, preferably resolve the problem of easy bit freezing common drift size gauge tool combines institutional operation during with wall scraper, thus reduce one trip operation, effectively improve operating efficiency, reduce operating cost.A kind of novel drift size gauge tool thus just two kinds of operation procedures combine.
Accompanying drawing explanation
Fig. 1 is original operation drift size gauge tool structural representation.
Fig. 2 is the utility model dredging, scraping wall one operation drift size gauge tool schematic diagram.
Fig. 3 is the utility model novel dredging, scraping wall one working string schematic diagram.
Detailed description of the invention
As shown in Figure 2, novel dredging, scraping wall one operation drift size gauge tool, have the cylindrical shell 2 of a top with connecting thread, below opening, cylindrical shell 2 top is connected with fittings body 1 by connecting thread; It is characterized in that a hollow section being housed as guide shoe 3 in the middle of cylindrical shell 2, and cylindrical shell 2 bottom is enclosed within the step of guide shoe 3 bottom, cylindrical shell 2 top is connected with fittings body 1.The cavity empty place formed at body upper/lower terminal and the guide shoe 3 of cylindrical shell 2 is processed with duct that a circle circulates for liquid as bypass circulation port 4.Be connected as a single entity by the step on fittings body 1 and fittings body 1 on guide shoe 3 top.
As shown in Figure 3, the novel dredging, scraping wall one working string made with above-mentioned drift size gauge tool, it is connected with hydraulic pressure wall scraper by sliding sleeve switch and forms on the fittings body of described novel dredging, scraping wall one operation drift size gauge tool.
Novel drift size gauge tool adds a hollow guide shoe again in the middle of thin-wall barrel, and urceolus is enclosed within the step of guide shoe bottom, and top is connected with top connection again.The cavity empty place formed at the upper and lower two ends of body and guide shoe processes again the duct of a circle liquid-circulating, well compensate for the problem that between body and sleeve pipe, the cyclic space is little, effectively reduces the generation of lock of tool drilling.And, this novel drift size gauge tool and we research and develop successful novel All-in-One operation hydraulic pressure wall scraper with the use of, in the process of going into the well, drift size gauge tool does not verify downhole conditions, the scraper of wall scraper is not also opened, the foreign material preventing the scraper when downhole conditions is failed to understand to scrape cause the situation of bit freezing to drift size gauge tool, preferably resolve the problem of easy bit freezing common drift size gauge tool combines institutional operation during with wall scraper, thus reduce one trip operation, effectively improve operating efficiency, reduce operating cost.When after drifting operation completes and after verifying the situation of down-hole casing, now tubing string need not be tripped out, and only need drop into sealed steel ball to tubing string internal diameter, when seal drop to be positioned at suppressing on sliding sleeve below wall scraper, above drift size gauge tool time, during by being pressurized to a specific force value in tubing string, scraper is opened, now just by put and put tubing string and carry out scraping wall operation.
Cylindrical shell and the top sub of the novel drift size gauge tool of this novel All-in-One operation are screw connection structure, the below of top sub body relies on screw thread to be connected with guide shoe again, except the normal circulation passage between entire body external diameter and sleeve pipe, in cavity between cylindrical shell and guide shoe, dependence is processed the circulation port in side, cylindrical shell upper and lower two ends and defines the new circulation canal of another one, the cylindrical shell of this special construction and guide shoe structure design not only ensure that the connection reliability of several part, and the function of drifting is identical with drift size gauge tool conventional in the past.The hollow guide shoe structure increased, the connection of cylindrical shell is located more safe and reliable, and the taper structure design of guide shoe front end can also guide tubing string to be positioned at cannula center position, the situation preventing cylindrical shell premature harm He break; Cylindrical shell descends two ends oblique surface machining to have multiple circulation port thereon, to ensure in operation process, except from except the circulation canal between cylindrical shell external diameter and internal surface of sleeve pipe, to add second circulation canal, can well prevent the generation of lock of tool drilling.
This novel All-in-One operation drift size gauge tool, through actual experiment, proves to reach following effect
The novel drift size gauge tool of All-in-One operation and patented product " novel All-in-One operation hydraulic pressure wall scraper " (patent No.: ZL 201220389571.5) with the use of, the feature of two kinds of new tools is performed to best.Thus, play lower tubular column one time and can complete drifting, scrape the several work such as wall, well-flushing, greatly improve workover treatment work efficiency, save the activity duration.Save one time according to 5000m well depth and play lower tubular column Time Calculation, activity duration 20 ~ 30 hours can be saved.
(2) the workover tool integration of operation once cost-saved about 200,000 yuan such as novel drift size gauge tool and patented product " novel All-in-One operation hydraulic pressure wall scraper ".Novel All-in-One operation drift size gauge tool merely add guide shoe part from structure than conventional drift size gauge tool: about 1500 yuan of cost; Add about 150 yuan of cost body punching and increases, add up to about 1650 yuan of the cost because part and processing charges increase/often overlap.But due to other workover tool integration of operation once again cost-saved about 200,000 yuan, both compare, and the increase of tool processes cost is negligible.Only Tarim Oilfield carries out nearly about 100 mouthfuls of the well that dredging, scraping wall connection is done every year, and adopt novel dredging, scraping wall one power tool can reduce expenses about 2,000 ten thousand yuan, economic benefit is considerable.

Claims (4)

1. novel dredging, scraping wall one operation drift size gauge tool, have the cylindrical shell (2) of a top with connecting thread, below opening, cylindrical shell (2) top is connected with fittings body (1) by connecting thread; It is characterized in that a hollow section being housed as guide shoe (3) in the middle of cylindrical shell (2), and cylindrical shell (2) bottom is enclosed within the step of guide shoe (3) bottom, cylindrical shell (2) top is connected with fittings body (1).
2. novel dredging, scraping wall one operation drift size gauge tool according to claim 1, is characterized in that the cavity empty place formed at body upper/lower terminal and the guide shoe (3) of cylindrical shell (2) is processed with duct that a circle circulates for liquid as bypass circulation port (4).
3. novel dredging, scraping wall one operation drift size gauge tool according to claim 1, is characterized in that being connected as a single entity by the step on fittings body (1) and fittings body (1) on guide shoe (3) top.
4. novel dredging, scraping wall one working string, is characterized in that on the fittings body (1) of the drift size gauge tool described in claim 1-3 any one, be connected with hydraulic pressure wall scraper by sliding sleeve switch is formed.
CN201420578297.5U 2014-10-08 2014-10-08 Novel dredging, scraping wall one operation drift size gauge tool and working string Active CN204225818U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420578297.5U CN204225818U (en) 2014-10-08 2014-10-08 Novel dredging, scraping wall one operation drift size gauge tool and working string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420578297.5U CN204225818U (en) 2014-10-08 2014-10-08 Novel dredging, scraping wall one operation drift size gauge tool and working string

Publications (1)

Publication Number Publication Date
CN204225818U true CN204225818U (en) 2015-03-25

Family

ID=52923927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420578297.5U Active CN204225818U (en) 2014-10-08 2014-10-08 Novel dredging, scraping wall one operation drift size gauge tool and working string

Country Status (1)

Country Link
CN (1) CN204225818U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104295258A (en) * 2014-10-08 2015-01-21 宝鸡瑞通石油装备有限公司 Novel drifting-wall scraping integrated operating gauge cutter and operating pipe column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104295258A (en) * 2014-10-08 2015-01-21 宝鸡瑞通石油装备有限公司 Novel drifting-wall scraping integrated operating gauge cutter and operating pipe column
CN104295258B (en) * 2014-10-08 2017-08-29 宝鸡瑞通石油装备有限公司 The integral operation gauguste cutter of new dredging, scraping wall and working string

Similar Documents

Publication Publication Date Title
CN105863544B (en) Fishing tool in a kind of slip-type hydraulic control
CN204703876U (en) A kind of bridge-type concentric separated-injection tubing string
CN103835678A (en) Horizontal well inner-pipe-free drilling-plug-free grading cementing well completion method
CN104295258A (en) Novel drifting-wall scraping integrated operating gauge cutter and operating pipe column
CN104763367A (en) Pigging and pipe scraping integrated tool
CN104499987A (en) Novel full-flow area sliding sleeve switch
CN204225818U (en) Novel dredging, scraping wall one operation drift size gauge tool and working string
CN202228029U (en) Sand bailer for down-hole operation of oil field
CN107542422A (en) The milling method and combined type junk mill and application method of different hole diameters
CN109798078B (en) Coal bed gas horizontal well cave sand-buried well repairing process
CN203603815U (en) Through scraping integration down well equipment
CN204040966U (en) A kind of drilling sampling device
CN207111019U (en) Combined type junk mill for different hole diameters
CN204386546U (en) Novel current global mechanism area sliding sleeve switch
CN203961914U (en) A kind of taper sand washing pipeline scraper
CN203879478U (en) Hydraulic sandblasting volume fracturing pipe column
CN114562199B (en) Cement leaking stoppage bores stopper integrated underground device
CN210460595U (en) Scraper controllable drilling plug-drifting-wall scraping integrated device
CN201544128U (en) Hydraulic sand-blasting cutter
CN204804733U (en) Fusiformis drift size gauge tool instrument
CN204492759U (en) Multifunctional rotary sleeve pipe leads to curette
CN204627487U (en) The pipe integrated instrument of dredging, scraping
CN203783525U (en) Double-grade sealed collision salvageable well completion device for horizontal well
CN218994773U (en) Pipe wall sampler for oil and gas well
CN205063899U (en) Oil -water well is water conservancy whirl washing unit in pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200922

Address after: 721013 room 1203, block a, Star Diamond International, No.63, Gaoxin Avenue, high tech Development Zone, Baoji City, Shaanxi Province

Patentee after: Baoji Ruitong Energy Technology Co.,Ltd.

Address before: 721013 No. 89, hi tech Avenue, Shaanxi, Baoji

Patentee before: BAOJI RUITONG OILFIELD MACHINERY Co.,Ltd.

TR01 Transfer of patent right