CN204224995U - Fortune frame railway D beam one chassis - Google Patents

Fortune frame railway D beam one chassis Download PDF

Info

Publication number
CN204224995U
CN204224995U CN201420551078.8U CN201420551078U CN204224995U CN 204224995 U CN204224995 U CN 204224995U CN 201420551078 U CN201420551078 U CN 201420551078U CN 204224995 U CN204224995 U CN 204224995U
Authority
CN
China
Prior art keywords
chassis
steel pipe
pipe column
crossbeam
railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420551078.8U
Other languages
Chinese (zh)
Inventor
樊俊停
高荣峰
韩士桥
武志华
尹国梁
张晋平
李向宇
***
韩斌峰
王扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201420551078.8U priority Critical patent/CN204224995U/en
Application granted granted Critical
Publication of CN204224995U publication Critical patent/CN204224995U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of fortune frame railway D beam one chassis, and its walking system divides upper strata vehicle frame and lower floor's vehicle frame, and two-layer central frame beam is connected by pin, and vehicle frame is all provided with travelling wheel; Support system is made up of steel pipe column and crossbeam; Wherein steel pipe column comprises two parts, and a part is chassis steel pipe column, is fixed on upper strata central frame beam; Another part is supporting steel tubing string, is located at D beam reinforcing place railway both sides, each 1 of each chassis both sides; Be provided with pin in the middle of crossbeam, pin inserts chassis steel pipe column top end; Lift-on/Lift-off System is made up of Chain block and bracket earrings.Sliding system is made up of slide block and Lever Blocks.Often group beam 2 chassis, a chassis once sets up or removes one group or two panels D beam, can realize " horizontal-vertical-horizontal " slippage of D beam, lift by crane installation or remove D beam in place.

Description

Fortune frame railway D beam one chassis
Technical field
The utility model relates to the Mobile workbench in a kind of railway construction field, specifically, is a kind of chassis transporting frame railway D beam.
Background technology
Along with the high speed development of railway, the requirement of railway operation to construction safety is more and more higher, and undercrossing tunnel carries out bridges and culverts construction, no matter cast-in-place or jacking, and railway D beam is widely used in that railway is built on stilts to be reinforced more and more.
For ensureing existing railway operation and safety, under existing railway when excavation of foundation pit, bridges and culverts cast-in-place construction, adopting railway D beam to make somebody a mere figurehead reinforcing to railway is a kind of conventional construction method, usually adopts mobile crane to carry out installation and the dismounting of D beam.For railway terminal area, station track is many, and contact net power failure influence basin is large, construction " skylight point " time is short, and traditional mobile crane cannot meet that span is large, the requirement of distance, and track crane needs contact net to have a power failure, dials and move cooperation, time is short, complex procedures, cannot meet construction demand.
During the southern station combined test of newly-built high ferro Taiyuan, opening operation, 1-6m synthetic job is increased newly genuine at southern throat, long 220m, under wear 22 station tracks, under the condition not affecting operation, adopt 24m D beam to carry out fixed track usage plan reinforcing to railway, below D beam, then carry out excavation of foundation pit, the genuine cast-in-place construction of synthetic job.Because cross-line station track is many, the lifting of D beam, beyond mobile crane boundary of works area, cannot be carried out vapour and hang construction; Railway electrification track operation car is adopted to carry out lifting construction, contact net is needed to have a power failure, simultaneously operation section need to carrying out bracket dismounting in contact net point, netting twine dials and moves and recover construction, contact net power failure range is large, large on hinge transport impact, " skylight point " time short (1 hour), construction demand cannot be met.If contact net does not need to have a power failure, " skylight point " time can extend to 3 hours, and the engineering time increases greatly.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of fortune frame railway D beam one chassis, and alternative mobile crane, realizes " horizontal-vertical-horizontal " slippage of D beam and D beam lifts in groups.
Hold art problem above for solving, the technical solution adopted in the utility model is:
A kind of fortune frame railway D beam one chassis, comprises walking system, support system, Lift-on/Lift-off System and sliding system,
---walking system, point upper strata vehicle frame and lower floor's vehicle frame, two-layer central frame beam is connected by pin, and vehicle frame is all provided with travelling wheel;
---support system, is made up of steel pipe column and crossbeam;
Wherein steel pipe column comprises two parts, and a part is chassis steel pipe column, is fixed on upper strata central frame beam; Another part is supporting steel tubing string, is located at D beam reinforcing place railway both sides, each 1 of each chassis both sides;
Be provided with pin in the middle of crossbeam, pin inserts chassis steel pipe column top end;
---Lift-on/Lift-off System, is made up of Chain block and bracket earrings;
Each chassis crossbeam is installed 2 groups of Chain blocks, be located at chassis steel pipe column both sides respectively, 1 group, every side;
Bracket earrings is installed on the floor of D beam both sides lifting place, and 4, every sheet beam, is connected with Chain block;
---sliding system, is made up of slide block and Lever Blocks;
Each chassis crossbeam installs two slide blocks, lays respectively at chassis steel pipe column both sides, slide block lower end establishes Chain block suspension centre to connect Chain block,
1 Lever Blocks is installed on each slide block top.
As the preferred scheme of one, the two-layer chock of supporting steel tubing string underlay, establishes 3 steel pipe bearing diagonals outside each supporting steel tubing string, to guarantee supporting steel pipe column stability.
As the preferred scheme of one, establish polyvinyl fluoride plate in slide block, corrosion resistant plate is established on crossbeam top, spreads butter during construction, to reduce frictional resistance.
As the preferred scheme of one, also comprise the accessory system be made up of jack, crossbeam steel tubular handrailing
The utility model be railway D beam portable fortune, frame, tear institutional operation chassis open, often organize beam 2 chassis, a chassis once sets up or removes one group or two panels D beam, " horizontal-vertical-horizontal " slippage of D beam can be realized, lifting is installed (or dismounting), and D beam is in place, cut down the number of intermediate links and operation, reduce D beam and to rise and fall unstable risk of easily toppling over, solve railway D girder span multiply road, terminals and reinforce difficult problem.Have a power failure without the need to contact net, greatly release railway transport capacity, do not limit by station track, reduce constructor, save the engineering time.
The utility model is applicable to field, station D beam strengthening construction, and construct to interval single line same applicable, be particularly useful for station bottleneck district, railway station track is many, and mobile crane cannot complete construction, and contact net has a power failure on transporting the larger construction of impact simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model fortune frame railway D beam one chassis.
Fig. 2 is the A-A sectional view of Fig. 1.
In figure, 1-upper strata vehicle frame, 2-lower floor vehicle frame, 3-pin, 4-travelling wheel, 5-crossbeam, 6-chassis steel pipe column, 7-supporting steel tubing string, 8-Chain block, 9-bracket earrings, 10-slide block, 11-Lever Blocks, 12-bearing diagonal, 13-D beam, 14-chock.
Detailed description of the invention
The technical scheme claimed to the utility model below in conjunction with accompanying drawing does explanation clear, complete further.
Fortune frame railway D beam one chassis described in the utility model, comprises walking system, support system, Lift-on/Lift-off System and sliding system.
One, walking system
Divide upper strata vehicle frame 1 and lower floor's vehicle frame 2, two-layer central frame beam is connected by pin 3, and vehicle frame is all provided with travelling wheel 4.Upper strata vehicle frame 1 is the horizontal running part of vertical railway, long (vertical railway direction) 3m, wide 1.6m.Lower floor's vehicle frame 2 is downline road vertical shift running part, long (rail track direction) 2.4m, wide 1.6m, upper and lower two-layer vehicle frame overall height 0.54m.Upper and lower two-layer central frame beam establishes steel column pin 3 to connect, so that upper and lower two-layer vehicle frame can rotate mutually, according to on-site actual situations adjustment direction at any time.
Travelling wheel 4 adopts single-track to take turns, and the horizontal walking rails wheel on upper strata vehicle frame 1 adopts Φ 325mm, and the longitudinal walking rails wheel on lower floor's vehicle frame 2 adopts Φ 200mm, and axletree is respectively Φ 80mm, Φ 70mm.
Two, support system
Be made up of steel pipe column and crossbeam 5.
Wherein, steel pipe column comprises two parts, and a part is chassis steel pipe column 6, and be fixed in the middle of upper strata vehicle frame 1, adopt flange to be connected with upper strata vehicle frame 1, chassis steel pipe column 6 adopts Φ 320mm, high 1500 mm.Another part is supporting steel tubing string 7, is located at D beam reinforcing place railway both sides, each 1 of each chassis both sides, and totally 4, supporting steel tubing string 7 adopts Φ 320mm, height 2500 mm.The two-layer chock 14 of supporting steel tubing string 7 underlay, establishes 3 Φ 60 steel pipe bearing diagonals 12, with true supporting steel pipe column stability outside each supporting steel tubing string 7.
Crossbeam adopts that 2 I200mm i iron are soldered to be combined, and long 7000mm, wide 300mm, is provided with pin in the middle of crossbeam 5, and pin inserts chassis steel pipe column top end, can all-direction rotation.
Three, Lift-on/Lift-off System
Be made up of Chain block 8 and bracket earrings 9;
Each chassis crossbeam 5 is installed 2 groups of 10T Chain blocks 8, often organize 2, totally 4, be located at chassis steel pipe column 6 both sides respectively, 1 group, every side;
Make 8 lifting bracket earrings 9, bracket earrings 9 is installed on the floor of D beam both sides lifting place, and 4, every sheet beam, is connected with Chain block 8;
Four, sliding system
Be made up of slide block 10 and Lever Blocks 11;
Slide block stainless steel is made, and each chassis crossbeam 5 installs two slide blocks 10, lays respectively at chassis steel pipe column 6 both sides, and slide block 10 lower end establishes Chain block suspension centre to connect Chain block 8, and each slide block installs two Chain blocks 8.Establish polyvinyl fluoride plate in slide block 10, corrosion resistant plate is established on crossbeam 5 top, spreads butter, to reduce frictional resistance during construction.
Each slide block 10 pushes up installation 1 1.5T Lever Blocks 11, by Lever Blocks 11 lateral pull, makes slide block 10 slippage, thus transverse shifting D beam 13.
On the basis of above structure, the utility model is also provided with accessory system.
Five, accessory system
Be made up of hydraulic jack, hand-operated jack and crossbeam steel tubular handrailing.
Hydraulic jack: D beam is placed in after on chassis, chassis is traversing to vertical shift track place, and each chassis need adopt 2 hydraulic jack, and every platform jack is not less than 15T and pushes up power, and jack-up chassis and D beam, to extract or to set up cross slide way.
Hand-operated jack: empty station car laterally into and out of time, each chassis need adopt 4 hand-operated jacks, and every platform top power is not less than 1T, jack-up chassis, to extract (or erection) cross slide way.
Crossbeam steel tubular handrailing: steel tubular handrailing blocks crossbeam i iron base plate, be mainly used in empty station car laterally into and out of time, particularly during hand-operated jack jack-up empty station car, establish for guaranteeing chassis and crossbeam longitudinal stability.
The course of work of the utility model chassis is described below in conjunction with an example.
Southern station, reconstructed railway hinge Taiyuan and south, southern station, correlation engineering Taiyuan throat increase DK219+219(1-6.0m newly) synthetic job is genuine, cross stone too, western greatly two major station fields, amount to 22 station tracks, in construction, adopt 24m D beam hardened link.Below to install D beam 13, be specifically described as follows:
(1) outer preparation
set up cross slide way: outside circuit, utilize sleeper to set up two row's horizontal sliding tracks between spacious place and line, rail adopts 50kg/m, guide rail longitudinal pitch 12.06m.
installation exercise chassis: lay Mobile workbench outside circuit, on cross slide way, the per pass section of track is put a chassis.Chassis installs crossbeam 5, slide block 10 and Chain block 8, Lever Blocks 11.
d beam 13 hangs: adopt a 50T mobile crane, two panels D beam 13 is hung on chassis, two panels D beam 13 lays respectively at chassis steel pipe column 6 both sides, and two panels D beam 13 two ends adopt stringing hoop to reinforce together, and every sheet D beam 13 installs lifting bracket earrings 9 on Hoisting Position place floor.
preparation set up by steel pipe column: reinforce circuit both sides, place at D beam, set up supporting steel tubing string 7 bottom chock 14 in advance, and supporting steel tubing string 7 and bearing diagonal 12 transport put in place.
jack prepares: hydraulic jack is transported to circuit vertical shift place in advance, installs oil pipe and oil pump, hand-operated jack is fixed on chassis in advance.
(2) work flow in
traversing: cross slide way connects, follow closely solid rail → transverse-moving trolley to vertical shift circuit place → rotating lower vehicle frame 2, micro-moving stage car, the urgent horizontal road wheel of adjustment wheel direction → timber wedge, fixed lateral position;
vertical shift: at upper strata vehicle frame 1 outer side-lower, the jack-up chassis of hydraulic jack → is successively installed, extracts cross slide way, return back to top to fall on vertical shift railway → vertical shift chassis kills lengthwise rows travelling wheel, fixing lengthwise position to reinforcing place of D beam, timber wedge;
horizontal sliding, whereabouts D beam 13: swing bolster 5 to horizontal path direction, untie the stringing hoop → reinforcing of D beam 13 two ends, connecting cross beam 5 and circuit supported on both sides steel pipe column 7 → moving slider 10, be connected Chain block 8, bracket earrings 9 → manually pull successively Chain block 8 hoists D beam 13, make D beam 13 end depart from chassis → artificial to pull on crossbeam 5 top successively outside Lever Blocks 11 slippage D beam 13 to steel sleeper → manually draw Chain block 8, whereabouts D beam 13;
travelling backwards chassis: after D beam 13 is in place, travelling backwards slide block 10, swing bolster 5 to parallel circuit direction → fixed cross beam 5, install crossbeam steel tubular handrailing → vertical shift chassis to cross slide way place → establish special messenger to hold up steady crossbeam steel tubular handrailing, utilize artificial jack-up chassis → installations of hand-operated jack, connect cross slide way → fallings jack, make chassis to fall on cross slide way → outside transverse-moving trolley to circuit outside, timber wedge kills, fixes chassis.
(3) key points for operation and points for attention
cross slide way section of track spacing will accurately be fixed, and according to place two, D beam lifting point root distance between plates, determines section of track spacing in advance, and to guarantee that chassis center is corresponding with D beam suspension centre, circuit both sides steel pipe column is corresponding with D beam suspension centre floor.
d beam 13 synchronously, steadily, at a slow speed, will guarantee safety during transverse-moving trolley on chassis.
measure that chassis is traversing, vertical shift position in advance, guaranteed that contraposition is accurate, carry out next procedure fast.
when adopting hydraulic jack jack-up D beam 13, two chassis can not be synchronous, after first will completing a chassis, then carries out jack-up, the falling of another chassis, guarantees that D beam 13 is steady, safety.
because between cross slide way and vertical line, angle is uncertain, therefore, each transverse-moving trolley is located in after on vertical shift circuit, and chassis makes a check mark, and determines the relative position relation of upper and lower chassis, to guarantee rapid-aligning during travelling backwards chassis.
when empty wagons vertical shift, traversing, jack-up, falling, chassis both sides must establish special messenger to buttress crossbeam steel tubular handrailing, guarantee that chassis is steady.
d beam 13 promotes, slippage, in dropping process, special messenger be established to check, and whether the steel pipe column bearing diagonal 12 of circuit both sides is firm, guarantees that supporting steel tubing string 7 is firm.
d beam 13 promotes, will assume unified command of, act in agreement in slippage, whereabouts, arranges special messenger two ends to hold up steady D beam 13 simultaneously, rocks amplitude, guarantee safety to reduce D beam 13.
check Chain block 8, Lever Blocks 11 before construction, guaranteed intact, carry out emergent spare unit simultaneously.
In the construction of southern station, Taiyuan synthetic job tunnel, this device security successfully completes the installation and removal of 8 groups of D beams, and each engineering time basic controlling is in the 1.5-2 little time.

Claims (4)

1. transport a frame railway D beam one chassis, comprise walking system, support system, Lift-on/Lift-off System and sliding system,
---walking system, point upper strata vehicle frame (1) and lower floor's vehicle frame (2), two-layer central frame beam is connected by pin (3), vehicle frame is all provided with travelling wheel (4);
---support system, is made up of steel pipe column and crossbeam (5);
Wherein steel pipe column comprises two parts, and a part is chassis steel pipe column (6), is fixed in the middle of upper strata vehicle frame (1); Another part is supporting steel tubing string (7), is located at D beam reinforcing place railway both sides, each 1 of each chassis both sides;
Be provided with pin in the middle of crossbeam (5), pin inserts chassis steel pipe column top end;
---Lift-on/Lift-off System, is made up of Chain block (8) and bracket earrings (9);
The upper installation 2 groups of Chain blocks (8) of each chassis crossbeam (5), are located at chassis steel pipe column (6) both sides, 1 group, every side respectively;
Bracket earrings (9) is installed on the floor of D beam both sides lifting place, 4, every sheet beam, is connected with Chain block (8);
---sliding system, is made up of slide block (10) and Lever Blocks (11);
Upper installation two slide blocks (10) of each chassis crossbeam (5), lay respectively at chassis steel pipe column (6) both sides, and slide block (10) lower end establishes Chain block suspension centre to connect Chain block (8),
1 Lever Blocks (11) is installed on each slide block top.
2. fortune frame railway D beam one chassis according to claim 1, is characterized in that: the two-layer chock of supporting steel tubing string (7) underlay (14), and 3 steel pipe bearing diagonals (12) are established in each supporting steel tubing string (7) outside.
3. fortune frame railway D beam one chassis according to claim 1 and 2, it is characterized in that: slide block establishes polyvinyl fluoride plate in (10), corrosion resistant plate is established on crossbeam (5) top.
4. fortune frame railway D beam one chassis according to claim 1, is characterized in that: also comprise the accessory system be made up of jack and crossbeam steel tubular handrailing.
CN201420551078.8U 2014-09-24 2014-09-24 Fortune frame railway D beam one chassis Expired - Fee Related CN204224995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420551078.8U CN204224995U (en) 2014-09-24 2014-09-24 Fortune frame railway D beam one chassis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420551078.8U CN204224995U (en) 2014-09-24 2014-09-24 Fortune frame railway D beam one chassis

Publications (1)

Publication Number Publication Date
CN204224995U true CN204224995U (en) 2015-03-25

Family

ID=52923111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420551078.8U Expired - Fee Related CN204224995U (en) 2014-09-24 2014-09-24 Fortune frame railway D beam one chassis

Country Status (1)

Country Link
CN (1) CN204224995U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213512A (en) * 2014-09-24 2014-12-17 中铁六局集团有限公司 Integrated trolley for transporting and erecting D beams of railway and method for mounting D beams
CN107893381A (en) * 2017-11-30 2018-04-10 中铁大桥局集团第二工程有限公司 A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213512A (en) * 2014-09-24 2014-12-17 中铁六局集团有限公司 Integrated trolley for transporting and erecting D beams of railway and method for mounting D beams
CN104213512B (en) * 2014-09-24 2016-06-08 中铁六局集团有限公司 Fortune frame railway D beam one chassis and D beam installation method
CN107893381A (en) * 2017-11-30 2018-04-10 中铁大桥局集团第二工程有限公司 A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform

Similar Documents

Publication Publication Date Title
CN100441779C (en) Space-precasting translation-emplacing method for bridge construction
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN108374296A (en) The construction method of straddle type monorail rail tracks installation
CN102797227A (en) Construction method adopting inverted triangular obliquely-crawling hanging basket
CN111778857B (en) Process for synchronously erecting upper and lower beams of double-layer overhead bridge of urban public rail
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN103669217A (en) Hanging basket with rear fulcrum and transverse moving method for integral range replacement of hanging basket with rear fulcrum
CN108221711A (en) Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
JP3711355B2 (en) Bridge erection method
CN204224995U (en) Fortune frame railway D beam one chassis
CN111576248A (en) Dismantling method for cantilever cast-in-situ beam hanging basket system
JP4559370B2 (en) Girder erection method by erection gutter from the side of bridge
CN105019357B (en) The installation method of abnormity prefabricated bridge on a kind of arch bridge uncovered lattice girder steel
CN208009277U (en) A kind of short sliding installation system of land-based area large-tonnage steel box beam
CN104213512B (en) Fortune frame railway D beam one chassis and D beam installation method
CN207987749U (en) Ride cable-styled erection crane
CN105714691B (en) A kind of curve low-pylon cable-stayed bridge Hanging Basket interlaced arrangement and traversing construction method
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN105544406A (en) Sliding-type Bailey beam dismantling device and dismantling method thereof
KR101234090B1 (en) Method for changing girder of railway plate girder bridge
CN111705682A (en) Construction method and equipment for removing and rebuilding superstructure of widened bridge across electrified railway
CN106677076A (en) Simple and rapid method and device for mounting box girder at the top of adjacent bent cap by using span pier gantry crane
CN204715212U (en) A kind of guiding device for mobile formwork girder whole lateral moving

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150325

Termination date: 20160924