A kind of waste-skip Gua Tong mechanism and waste-skip Download PDFInfo
- Publication number
- CN204223599U CN204223599U CN201420644729.8U CN201420644729U CN204223599U CN 204223599 U CN204223599 U CN 204223599U CN 201420644729 U CN201420644729 U CN 201420644729U CN 204223599 U CN204223599 U CN 204223599U
- Authority
- CN
- China
- Prior art keywords
- skip
- waste
- tong mechanism
- driver train
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
This application discloses a kind of waste-skip Gua Tong mechanism, comprise pedestal (1), first driver train (2) and the second driver train (3), described pedestal (1) is provided with pressing plate (4), described pressing plate (4) is fixedly mounted on described pedestal (1) by guide rail bracket (5), described guide rail bracket (5) is provided with link plate (6) slidably, described link plate (6) for by the top, edge of sewage disposer (7) to edge under described pressing plate (4), described first driver train (2) drives described link plate (6) upper mobile at described guide rail bracket (5), described pedestal (1) is provided with Bao Tong mechanism, described second driver train (3) drives described Bao Tong mechanism to embrace described sewage disposer (7) to make described Bao Tong mechanism.Waste-skip Gua Tong mechanism provided by the utility model, avoids waste-skip when collecting rubbish, and sewage disposer for fulcrum overturns and cause sewage disposer upper edge to be torn the generation of phenomenon, extends the service life of sewage disposer with its edge and pressing plate.
Description
Technical field
The application relates to refuse treatment plant preparation field, particularly relates to a kind of waste-skip Gua Tong mechanism.
Background technology
Waste-skip is the vehicle transporting various house refuse for municipal environmental sanitation.Traditional waste-skip only comprises an airtight envelope, for collecting and transport the rubbish in city in each sewage disposer, collection mainly artificial envelope rubbish in sewage disposer being poured into waste-skip of its rubbish, this rubbish to topple over mode cost of labor large.
Market there is a kind of waste-skip, by sewage disposer is fixed on waste-skip when rubbish transports and collects, the operation utilizing the Mechanical course structure of waste-skip to realize the upset of sewage disposer and rubbish to topple over.This mode, sewage disposer is in toppling process, and sewage disposer can overturn for fulcrum with upper edge and pressing plate, causes tearing of sewage disposer upper edge, sewage disposer is damaged, and the service life of sewage disposer is shortened greatly.
Therefore, how designing a kind of waste-skip Gua Tong mechanism, in garbage collection process, how to extend the service life of sewage disposer, is those skilled in the art's problem demanding prompt solutions.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of waste-skip Gua Tong mechanism, this waste-skip Gua Tong mechanism avoids waste-skip when collecting rubbish, sewage disposer for fulcrum overturns and cause sewage disposer upper limb to be torn the generation of phenomenon, extends the service life of sewage disposer with its edge and pressing plate.
The technical scheme that the utility model provides is as follows:
A kind of waste-skip Gua Tong mechanism, it is characterized in that, comprise pedestal, first driver train and the second driver train, described pedestal is provided with pressing plate, described pressing plate is vertically fixedly mounted on described pedestal by guide rail bracket, described link plate be slidably mounted on described guide rail bracket for by the top, edge of sewage disposer to edge under described pressing plate, described first driver train drives described link plate to move on described guide rail bracket, described pedestal is provided with Bao Tong mechanism, described second driver train drives described Bao Tong mechanism to embrace described sewage disposer by under the top, edge of described sewage disposer to described pressing plate behind edge at described link plate to make described Bao Tong mechanism.
Preferably, described Bao Tong mechanism comprises the arm that two are hinged on described pedestal both sides respectively, described arm is provided with drag board away from one end of described pedestal, described drag board is fixedly connected with one end of flexible-belt away from one end of described arm, and the other end of described flexible-belt is fixedly mounted on the one end near described pedestal in described arm.
Preferably, described second driver train drives described Bao Tong mechanism to be specially, the one end being hinged on described pedestal in described arm is provided with sprocket wheel, described arm is connected on described pedestal by the center hinge of described sprocket wheel, two described sprocket wheels are arranged with chain to make two described sprocket wheel counter-rotation, a sprocket wheel is wherein fixedly connected with attaching parts, and telescopic end and the described attaching parts of described second driver train are hinged.
Preferably, described guide rail bracket is provided with link plate slidably and is specially, described guide rail bracket is slidably provided with raising legs, and described link plate is fixedly mounted on described raising legs.
Preferably, the link plate be arranged on described raising legs is at least one.
Preferably, described link plate is fixedly mounted on described raising legs by bolt and nut, and described raising legs is horizontally arranged with position-limited trough, and the head of described bolt is placed in described position-limited trough.
Preferably, described first driver train drives described link plate to move on described guide rail bracket and is specially, the below of described link plate is arranged at described first driver train, and described first driver train is fixedly mounted on described pedestal, the telescopic end of described first driver train is fixedly connected with described raising legs.
The utility model additionally provides a kind of waste-skip, and described waste-skip have employed the waste-skip Gua Tong mechanism described in above-mentioned any one.
A kind of waste-skip Gua Tong mechanism disclosed in the utility model, compared with prior art, waste-skip Gua Tong mechanism provided by the utility model, owing to being provided with pressing plate on pedestal, pressing plate is fixedly mounted on pedestal by guide rail bracket, guide rail bracket is provided with link plate slidably, link plate withstands sewage disposer edge and pushes up to edge under pressing plate, fixation is risen to sewage disposer, pedestal is provided with Bao Tong mechanism, when sewage disposer lower edge by link plate top to pressing plate lower along time, sewage disposer is embraced by Bao Tong mechanism, when pouring sewage disposer into waste-skip, be that fulcrum rotates with pedestal, avoid in prior art, with sewage disposer edge and pressing plate for the sewage disposer edge that fulcrum overturns and cause is torn the generation of phenomenon, extend the service life of sewage disposer.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, the accompanying drawing that the following describes is only some embodiments recorded in the application, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is that waste-skip hangs bucket mechanism structure schematic diagram;
Fig. 2 is the birds-eye view of waste-skip Gua Tong mechanism;
Fig. 3 is the lateral plan of waste-skip Gua Tong mechanism;
Fig. 4 is the lateral plan of raising legs;
Fig. 5 is for embracing bucket mechanism structure schematic diagram;
Fig. 6 is for embracing the in-house structural representation of bucket;
Fig. 7 is the schematic diagram that waste-skip Gua Tong mechanism hangs before bucket;
Fig. 8 is the schematic diagram that waste-skip Gua Tong mechanism hangs after bucket.
Detailed description of the invention
Technical scheme in the application is understood better in order to make those skilled in the art person, below in conjunction with the accompanying drawing in the embodiment of the present application, technical scheme in the embodiment of the present application is clearly and completely described, obviously, described embodiment is only some embodiments of the present application, instead of whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all should belong to the scope of the application's protection.
As shown in Figures 1 to 8, the present embodiment provides a kind of waste-skip Gua Tong mechanism, this waste-skip Gua Tong mechanism comprises pedestal 1, first driver train 2 and the second driver train 3, pedestal 1 is provided with pressing plate 4, pressing plate 4 is fixedly mounted on pedestal 1 by guide rail bracket 5, guide rail bracket 5 is provided with link plate 6 slidably, link plate 6 for by the top, edge of sewage disposer 7 to pressing plate 4 times edges, first driver train 2 drives link plate 6 to move on guide rail bracket 5, pedestal 1 is provided with Bao Tong mechanism, second driver train 3 drives Bao Tong mechanism at link plate 6, sewage disposer 7 to be embraced in the top, edge of sewage disposer 7 with Shi Baotong mechanism to pressing plate 4 times edges.
The waste-skip Gua Tong mechanism that the present embodiment provides, compared with prior art, owing to being provided with pressing plate 4 on pedestal 1, pressing plate 4 is fixedly mounted on pedestal 1 by guide rail bracket 5, guide rail bracket 5 is provided with link plate 6 slidably, link plate 6 withstands sewage disposer 7 edge and pushes up to pressing plate 4 times edges, fixation is risen to sewage disposer, pedestal 1 is provided with Bao Tong mechanism, when sewage disposer 7 lower edge by link plate 6 push up to pressing plate 4 lower along time, sewage disposer 7 is embraced by Bao Tong mechanism, when pouring sewage disposer 7 into waste-skip, with pedestal 1 for fulcrum rotates, avoid in prior art, with sewage disposer 7 edge and pressing plate for the sewage disposer edge that fulcrum overturns and cause is torn the generation of phenomenon, extend the service life of sewage disposer.
Bao Tong mechanism in the present embodiment comprises the arm 9 that two are hinged on pedestal 1 both sides respectively, arm 9 is provided with drag board 10 away from one end of pedestal 1, drag board 10 is fixedly connected with away from one end with flexible-belt 11, one end of arm 9, and the other end of flexible-belt 11 is fixedly mounted on the one end near pedestal 1 in arm 9.Installation tension plate 10 in arm 9, drag board 10 is installed flexible-belt 11 and Shi Baotong mechanism can be applicable to the sewage disposer of all size, and can not cause damage to sewage disposer surface, and can Shi Baotong mechanism to embrace the effect of bucket better.
In the present embodiment, second driver train 3 drives Bao Tong mechanism to be specifically preferably, one end that arm 9 is hinged on pedestal 1 is provided with sprocket wheel 12, arm 9 is connected on pedestal 1 by the center hinge of sprocket wheel 12, the sprocket wheel 12 of two arms 9 is arranged with chain 13 to make two sprocket wheels 12 can counter-rotation, thus realizes the opening and closing of two arms 9, wherein, a sprocket wheel 12 is fixedly connected with attaching parts 14 wherein, telescopic end and the attaching parts 14 of the second driver train 3 are hinged.When needs arm 9 embraces sewage disposer 7, the telescopic end of the second driver train 3 stretches out, due to the telescopic end of the second driver train 3 and attaching parts 14 hinged, therefore, in the process that the telescopic end of the second driver train 3 stretches out, make the sprocket rotation hinged with the second driver train 3 telescopic end, owing to two sprocket wheels 12 being arranged with chain 13 to make two sprocket wheel energy counter-rotation, therefore in the process that the telescopic end of the second driver train 3 stretches out, two sprocket wheel counter-rotation, thus it is closed to realize two arms 9, embraces sewage disposer.
In the present embodiment, guide rail bracket 5 is provided with link plate 6 slidably and is specifically preferably, guide rail bracket 5 is slidably provided with raising legs 15, and link plate 6 is fixedly mounted on raising legs 15.
Wherein, the link plate 6 on raising legs 15 is at least one.
Of a great variety due to sewage disposer, the position of the reinforced rib of different sewage disposer is different, therefore, various sewage disposer is applicable in order to enable waste-skip Gua Tong mechanism, in the present embodiment, link plate 6 is fixedly mounted on raising legs 15 by bolt and nut 16, and raising legs 15 is horizontally arranged with position-limited trough 8, and the head of bolt is placed in position-limited trough 8.For the sewage disposer that reinforced rib position is different, unclamp nut, make the head of bolt mobile in position-limited trough 8, thus realize the adjustment of link plate 6 position, thus enable the waste-skip Gua Tong mechanism in the present embodiment be applicable to various sewage disposer.
In the present embodiment, first driver train 2 drives link plate 6 mobile preferably concrete on guide rail bracket 5, first driver train 2 is arranged on the below of link plate 6, and the first driver train 2 is fixedly mounted on pedestal 1, and the telescopic end of the first driver train 2 is fixedly connected with raising legs 15.
When link plate 6 hangs bucket, the telescopic end of the first driver train 2 stretches out, and promotes raising legs 15 and moves on guide rail bracket 5, thus drive sewage disposer 7 moves, until sewage disposer upper limb is pushed up to pressing plate 4 times edges by link plate 6.
The present embodiment also provides a kind of waste-skip, and this waste-skip have employed above-mentioned waste-skip Gua Tong mechanism.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the utility model.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from spirit or scope of the present utility model, can realize in other embodiments.Therefore, the utility model can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.
Claims (8)
1. a waste-skip Gua Tong mechanism, it is characterized in that, comprise pedestal (1), first driver train (2) and the second driver train (3), described pedestal (1) is provided with pressing plate (4), described pressing plate (4) is fixedly mounted on described pedestal (1) by guide rail bracket (5), described guide rail bracket (5) is provided with link plate (6) slidably, described link plate (6) for by the top, edge of sewage disposer (7) to edge under described pressing plate (4), described first driver train (2) drives described link plate (6) upper mobile at described guide rail bracket (5), described pedestal (1) is provided with Bao Tong mechanism, described second driver train (3) drives described Bao Tong mechanism to embrace described sewage disposer (7) by under the top, edge of described sewage disposer (7) to described pressing plate (4) behind edge at described link plate (6) to make described Bao Tong mechanism.
2. waste-skip Gua Tong mechanism according to claim 1, it is characterized in that, described Bao Tong mechanism comprises the arm (9) that two are hinged on described pedestal (1) both sides respectively, described arm (9) is provided with drag board (10) away from one end of described pedestal (1), described drag board (10) is fixedly connected with away from one end with flexible-belt (11), one end of described arm (9), and the other end of described flexible-belt (11) is fixedly mounted on the upper one end near described pedestal (1) of described arm (9).
3. waste-skip Gua Tong mechanism according to claim 2, it is characterized in that, described second driver train (3) drives described Bao Tong mechanism to be specially, one end that described arm (9) is hinged on described pedestal (1) is provided with sprocket wheel (12), described arm (9) is connected on described pedestal (1) by the center hinge of described sprocket wheel (12), two described sprocket wheels (12) are arranged with chain (13) to make two described sprocket wheels (12) energy counter-rotation, a sprocket wheel (12) is wherein fixedly connected with attaching parts (14), telescopic end and the described attaching parts (14) of described second driver train (3) are hinged.
4. waste-skip Gua Tong mechanism according to claim 1, it is characterized in that, described guide rail bracket (5) is provided with link plate (6) be slidably specially, described guide rail bracket (5) is slidably provided with raising legs (15), and described link plate (6) is fixedly mounted on described raising legs (15).
5. waste-skip Gua Tong mechanism according to claim 4, is characterized in that, the link plate (6) be arranged on described raising legs (15) is at least one.
6. waste-skip Gua Tong mechanism according to claim 4, it is characterized in that, described link plate (6) is fixedly mounted on described raising legs (15) by bolt and nut (16), described raising legs (15) is horizontally arranged with position-limited trough (8), and the head of bolt is placed in described position-limited trough (8).
7. waste-skip Gua Tong mechanism according to claim 4, it is characterized in that, described first driver train (2) drives described link plate (6) to be specially upper movement of described guide rail bracket (5), described first driver train (2) is arranged on the below of described link plate (6), and described first driver train (2) is fixedly mounted on described pedestal (1), the telescopic end of described first driver train (2) is fixedly connected with described raising legs (15).
8. a waste-skip, is characterized in that, described waste-skip have employed the waste-skip Gua Tong mechanism described in claim 1 to 7 any one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420644729.8U CN204223599U (en) | 2014-10-31 | 2014-10-31 | A kind of waste-skip Gua Tong mechanism and waste-skip |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420644729.8U CN204223599U (en) | 2014-10-31 | 2014-10-31 | A kind of waste-skip Gua Tong mechanism and waste-skip |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204223599U true CN204223599U (en) | 2015-03-25 |
Family
ID=52921718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420644729.8U Expired - Fee Related CN204223599U (en) | 2014-10-31 | 2014-10-31 | A kind of waste-skip Gua Tong mechanism and waste-skip |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204223599U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110342156A (en) * | 2019-07-11 | 2019-10-18 | 长沙中联重科环境产业有限公司 | Adaptive holding barrels mechanism |
CN110342157A (en) * | 2019-07-11 | 2019-10-18 | 长沙中联重科环境产业有限公司 | Side feeding device and garbage truck with it |
CN113581693A (en) * | 2020-04-30 | 2021-11-02 | 河南森源重工有限公司 | Garbage truck, hang barreled and hang clamp plate structure of barreled |
-
2014
- 2014-10-31 CN CN201420644729.8U patent/CN204223599U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110342156A (en) * | 2019-07-11 | 2019-10-18 | 长沙中联重科环境产业有限公司 | Adaptive holding barrels mechanism |
CN110342157A (en) * | 2019-07-11 | 2019-10-18 | 长沙中联重科环境产业有限公司 | Side feeding device and garbage truck with it |
CN110342157B (en) * | 2019-07-11 | 2021-12-24 | 长沙中联重科环境产业有限公司 | Side loading attachment and have its garbage truck |
CN110342156B (en) * | 2019-07-11 | 2021-12-24 | 长沙中联重科环境产业有限公司 | Self-adaptive bucket holding mechanism |
CN113581693A (en) * | 2020-04-30 | 2021-11-02 | 河南森源重工有限公司 | Garbage truck, hang barreled and hang clamp plate structure of barreled |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204223598U (en) | A kind of waste-skip feed mechanism and waste-skip | |
CN203624319U (en) | Garbage truck tipper and garbage truck | |
CN203959084U (en) | Rubbish loader mechanism | |
CN204223599U (en) | A kind of waste-skip Gua Tong mechanism and waste-skip | |
CN209651795U (en) | A kind of dustbin promotion turnover device | |
CN203450665U (en) | Garbage dumping device | |
CN202784509U (en) | Burying-type lifting garbage station | |
CN105059800A (en) | Movable garbage compressing device with bucket hanging mechanism | |
CN206013565U (en) | A kind of Self-dumping dustbin | |
CN103723400A (en) | Trash can | |
CN204872400U (en) | Area hangs portable garbage compression equipment of bucket mechanism | |
CN204037727U (en) | A kind of battery-driven car automatic support leg device | |
CN203877292U (en) | Collecting barrel | |
CN203568281U (en) | Can turning mechanism of compressed garbage truck | |
CN202369022U (en) | Front feeding food waster trash bin | |
CN204355599U (en) | A kind of adjustable speed bont | |
CN203699087U (en) | Compression type dustbin | |
CN206844000U (en) | A kind of road sweeper rubbish tank mounting structure | |
CN218908522U (en) | Mechanism is emptyd to underground garbage station rubbish | |
CN206679666U (en) | A kind of bulky refuse case | |
CN206011810U (en) | A kind of hydraulic drive type refuse bin transposition platform device | |
CN201458153U (en) | Suspended environment-friendly cleaning box | |
CN203461389U (en) | Large-angle flip achieved garbage truck dumping device and garbage truck | |
CN203767390U (en) | Swill lifting device | |
CN203819838U (en) | Novel side-mounted type bucket mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |