CN204212514U - Distribution engineering martingale structure - Google Patents

Distribution engineering martingale structure Download PDF

Info

Publication number
CN204212514U
CN204212514U CN201420607427.3U CN201420607427U CN204212514U CN 204212514 U CN204212514 U CN 204212514U CN 201420607427 U CN201420607427 U CN 201420607427U CN 204212514 U CN204212514 U CN 204212514U
Authority
CN
China
Prior art keywords
martingale
load
bracing wire
outer end
vertical rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420607427.3U
Other languages
Chinese (zh)
Inventor
陈峻岭
付少奎
郑建烨
谢建明
林少楠
敖慧君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Yishan Electric Power Engineering Co ltd
Original Assignee
Wanshan Mountain Foochow Electric Power Advisory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wanshan Mountain Foochow Electric Power Advisory Co Ltd filed Critical Wanshan Mountain Foochow Electric Power Advisory Co Ltd
Priority to CN201420607427.3U priority Critical patent/CN204212514U/en
Application granted granted Critical
Publication of CN204212514U publication Critical patent/CN204212514U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model relates to a kind of distribution engineering martingale structure, it is characterized in that: comprise a vertical rod and be located at vertical rod middle and upper part martingale load, vertical rod upper end is arranged with bracing wire anchor ear, between described martingale load outer end and bracing wire anchor ear, tractive has upper drag wire, described martingale load outer end is connected with a pull-down line in addition and is connected with the cable quadrant be embedded under earth's surface, described martingale load includes identical halved body, this halved body is by be arranged in parallel and two crosspieces misplaced are formed with the oblique section being connected two crosspieces, the projection with arc-shaped recess is provided with inside the first crosspiece.The utility model allows the stressed of whole electric pole can be distributed to all directions equably, even if thus make electric pole be subject to different wind-force effects, also can be good at ensureing its stability.

Description

Distribution engineering martingale structure
technical field:
The utility model relates to a kind of distribution engineering martingale structure.
background technology:
Can the regular strong point using electric pole and uses as corner in distribution engineering, electric pole in the past and support unreasonable, makes it easily be subject to extraneous wind effect and tilt or collapse, thus greatly affects the normal operation of electrical network.
summary of the invention:
The purpose of this utility model is to provide a kind of distribution engineering martingale structure, and this distribution engineering martingale structure is conducive to realizing good wind loading rating.
The utility model distribution engineering martingale structure, it is characterized in that: comprise a vertical rod and be located at vertical rod middle and upper part martingale load, vertical rod upper end is arranged with bracing wire anchor ear, between described martingale load outer end and bracing wire anchor ear, tractive has upper drag wire, described martingale load outer end is connected with a pull-down line in addition and is connected with the cable quadrant be embedded under earth's surface, described martingale load includes identical halved body, this halved body is by be arranged in parallel and two crosspieces misplaced are formed with the oblique section being connected two crosspieces, the projection with arc-shaped recess is provided with inside the first crosspiece.
Further, above-mentioned cable quadrant is a cement block.
Further, above-mentioned cement block and martingale are carried on a shoulder pole between outer end and are connected U-shaped draw ring, stay rod, UT wire clamp, bracing wire, wedge type clamp and prolongation ring successively.
Further, between above-mentioned martingale load outer end and bracing wire anchor ear, tractive has UT wire clamp, bracing wire, wedge type clamp and prolongation ring successively.
The utility model distribution engineering martingale structure has upper drag wire by arranging tractive between martingale load outer end and bracing wire anchor ear, described martingale load outer end is connected with a pull-down line in addition and is connected with the cable quadrant be embedded under earth's surface, described martingale load includes identical halved body, this halved body is by be arranged in parallel and two crosspieces misplaced are formed with the oblique section being connected two crosspieces, the projection with arc-shaped recess is provided with inside the first crosspiece, this arc-shaped recess holds vertical rod, the mating reaction of upper drag wire and pull-down line, allow the stressed of whole electric pole can be distributed to all directions equably, even if thus make electric pole be subject to different wind-force effects, also can be good at ensureing its stability.
accompanying drawing illustrates:
Fig. 1 is organigram of the present utility model;
Fig. 2 is the organigram that martingale carries on a shoulder pole a halfbody;
Fig. 3 is the A-A sectional drawing of Fig. 1;
Fig. 4 is the top view of arc-shaped recess.
detailed description of the invention:
The utility model distribution engineering martingale structure, comprise a vertical rod 1 and the martingale load 2 being located at vertical rod 1 middle and upper part, vertical rod 1 upper end is arranged with bracing wire anchor ear 3, described martingale carries on a shoulder pole tractive between 2 outer ends and bracing wire anchor ear 3 upper drag wire 4, described martingale load outer end is connected with a pull-down line 5 in addition and is connected with the cable quadrant 6 be embedded under earth's surface, described martingale load 2 includes identical halved body 7, this halved body is by be arrangeding in parallel and two crosspieces 701 misplaced, 705 are formed with the oblique section 702 being connected two crosspieces, the projection 704 with arc-shaped recess 703 is provided with inside the first crosspiece, this arc-shaped recess 703 holds vertical rod 1.The angle that two oblique sections 702 are formed is 16 degree.These 16 degree have best wind resistance effect.
In addition in order to make skidproof effect better, have horizontal groove 706 in arc-shaped recess 703, the whole length direction groove depth of this horizontal groove is all identical, and groove width is identical with separation.The shape of groove is V-type groove, is inlaid with V-type block rubber in V-type groove, and this V-type block rubber be located in V-type groove is more conducive to improving frictional force.
In order to make windproof effect good, vertical rod and ground are the angle of 93 degree.It is the opposite direction toward cable quadrant 6.
Further, in order to reasonable in design, above-mentioned cable quadrant is a cement block, and this cement block is embedded in 1.8-2.4 rice under earth's surface.
Further, in order to reasonable in design, above-mentioned cement block and martingale are carried on a shoulder pole and to be connected U-shaped draw ring 8, stay rod 9, UT wire clamp 10, bracing wire, wedge type clamp 11 between outer end successively and to extend ring 12.Certain cement block and martingale are carried on a shoulder pole between outer end and can directly be substituted with bracing wire.
Further, in order to reasonable in design, between above-mentioned martingale load outer end and bracing wire anchor ear, tractive has UT wire clamp 10, bracing wire, wedge type clamp 11 and extends ring 12 successively.Can directly substitute with bracing wire between certain martingale load outer end and bracing wire anchor ear.
The foregoing is only preferred embodiment of the present utility model, all equalizations done according to the utility model claim change and modify, and all should belong to covering scope of the present utility model.

Claims (4)

1. a distribution engineering martingale structure, it is characterized in that: comprise a vertical rod and be located at vertical rod middle and upper part martingale load, vertical rod upper end is arranged with bracing wire anchor ear, between described martingale load outer end and bracing wire anchor ear, tractive has upper drag wire, described martingale load outer end is connected with a pull-down line in addition and is connected with the cable quadrant be embedded under earth's surface, described martingale load includes identical halved body, this halved body is by be arranged in parallel and two crosspieces misplaced are formed with the oblique section being connected two crosspieces, the projection with arc-shaped recess is provided with inside the first crosspiece.
2. distribution engineering martingale structure according to claim 1, is characterized in that: described cable quadrant is a cement block.
3. distribution engineering martingale structure according to claim 2, is characterized in that: described cement block and martingale are carried on a shoulder pole between outer end and be connected U-shaped draw ring, stay rod, UT wire clamp, bracing wire, wedge type clamp and prolongation ring successively.
4. distribution engineering martingale structure according to claim 1, is characterized in that: between described martingale load outer end and bracing wire anchor ear, tractive has UT wire clamp, bracing wire, wedge type clamp and prolongation ring successively.
CN201420607427.3U 2014-10-18 2014-10-18 Distribution engineering martingale structure Expired - Fee Related CN204212514U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420607427.3U CN204212514U (en) 2014-10-18 2014-10-18 Distribution engineering martingale structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420607427.3U CN204212514U (en) 2014-10-18 2014-10-18 Distribution engineering martingale structure

Publications (1)

Publication Number Publication Date
CN204212514U true CN204212514U (en) 2015-03-18

Family

ID=52981198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420607427.3U Expired - Fee Related CN204212514U (en) 2014-10-18 2014-10-18 Distribution engineering martingale structure

Country Status (1)

Country Link
CN (1) CN204212514U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089325A (en) * 2015-09-17 2015-11-25 广东电网有限责任公司电力科学研究院 Improved distribution network overhead line windproof guy wire device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089325A (en) * 2015-09-17 2015-11-25 广东电网有限责任公司电力科学研究院 Improved distribution network overhead line windproof guy wire device

Similar Documents

Publication Publication Date Title
CN204212514U (en) Distribution engineering martingale structure
CN204474182U (en) A kind of Combined tower crane
CN204552238U (en) A kind of wire is the compound cross-arm tangent tower that inverted triangle is arranged
CN206220619U (en) A kind of single time overhead transmission line cable T joint draws lower anchor support
CN202718447U (en) Steel tower for 110kV double circuits to penetrate through
CN206016391U (en) A kind of double loop cydariform cable termination tower that is maked somebody a mere figurehead based on drain bus under drawing
CN203911394U (en) Simple combined bridge
CN205046915U (en) Adopt two sides in two return circuits of V style of calligraphy combination cluster to cut -off steel pipe shaft tower
CN206220622U (en) A kind of single time overhead transmission line cable cut-offs and draws lower angle tower
CN204205301U (en) Three phase shielding contact box
CN204377555U (en) A kind of film fixing device of flower planting cable wire plastic tunnel
CN204068150U (en) A kind of wire slip-off preventing backup protection equipment
CN106555497A (en) A kind of single time overhead transmission line cable T joint draws lower anchor support
CN203932583U (en) A kind of two output formula video/audio wire joints
CN106555499A (en) Existing single loop strain insulator steel tower cable draws lower beam
CN204040602U (en) With cross bar pole type tent
CN205428608U (en) High voltage transmission lines post insulators
CN204243237U (en) A kind of hanging earthing conductor aid of 10kV overhead wire
CN203499319U (en) Power transmission line pipe tower
CN204886108U (en) A T type connector for power cable
CN204167538U (en) A kind of connector female seat
CN204940671U (en) A kind of civil construction fragment of brick
CN203795933U (en) Composite bushing cable terminal pole
CN203960735U (en) Be assembled bridge floor device
CN202474402U (en) Wall socket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190404

Address after: 350001 Huqian New Village, 150 Huqian Road, Gulou District, Fuzhou City, Fujian Province, 10 603 blocks

Patentee after: Fujian Yishan Electric Power Engineering Co.,Ltd.

Address before: 350001 Huqian New Village, 150 Huqian Road, Gulou District, Fuzhou City, Fujian Province, 10 603 blocks

Patentee before: FUZHOU ONE SUN POWER CONSULTING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150318

Termination date: 20211018